Well ID: 37-059-27538 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.802633,"lon":-80.046828,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Greene Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 152262 | |
Farm/Lease Name: COMMONWEALTH A 8H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-11-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.802633 | |
Longitude: -80.046828 |
Date | Event |
---|---|
2017-11-15 | New Permit Application |
2018-01-08 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CHEVRON APPALACHIA LLC | 50,152.00 | 6 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.86 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,150.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 16.25 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Drill Cuttings | 86.11 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 52.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 926.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 42.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil | 0.86 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 11.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 3.10 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 7.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Drill Cuttings | 776.08 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 3.16 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 2.57 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 47.24 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 145.11 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 126.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 72.96 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Drill Cuttings | 286.20 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 5.52 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 218.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Drill Cuttings | 506.85 Tons | LANDFILL | 100172 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,362.75 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 131.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 6.66 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 346.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,152.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 310.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Waste Water Treatment Sludge | 2.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 174.75 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 4.12 Tons | LANDFILL | 100172 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 76.25 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2681350 | Primary Facility | 2018-01-10 | Drilling/Alteration | No Violations Noted | Installing corrugated cellar trough solid rock. Planning to drill for 30" conductor set at 40' today. |
2751663 | Primary Facility | 2018-06-04 | Incident- Response to Accident or Event | In Compliance with Policy | On 06/01/18 at approximately 20:15 hours Chevron reported a spill of 5 to 10 gallons of soap. On 06/04/18 I, along with WQS Adam Ofstun, conducted an incident response inspection. The spill had been remediated by the time of inspection. The spill was addressed in compliance with the spill policy. |
2761013 | Primary Facility | 2018-08-07 | Drilling/Alteration | No Violations Noted | The operator is currently drilling the intermediate #2 borehole section. Intermediate #1 casing was set at 3,682'. The operator reported that full circulation was maintained throughout the job and 40 bbls cement was circulated to surface. The operator topped off the annulus with 2 bbls cement. CIT test performed after WOC of 8 hrs. The operator is currently drilling ahead at 10,911'. The operator is approaching casing point. Conduct site walk. The operator is addressing containment issues identified. |
2763390 | Primary Facility | 2018-08-14 | Drilling/Alteration | No Violations Noted | The operator has drilled the intermediate # 2 borehole section to 11,413'. Operator is currently conducting fishing operations. The operator has stuck tools @ 11,200'. |
2769739 | Primary Facility | 2018-08-31 | Drilling/Alteration | No Violations Noted | The operator has drilled the intermediate # 2 borehole section to 11,652' TMD / 11,495' TVD. The operator is currently conducting fishing operations. |
2773430 | Primary Facility | 2018-09-11 | Drilling/Alteration | No Violations Noted | Operator conducted plug back operations on 9/2/18 after unsuccessful fishing operations.
Kick plug set from 11,600' - 11,100' 11,100'- 10,600' 10,600' - 10,100' Tagged up kick plug - ratty cement @ 9910'. Solid cement 10230' Operator currently attempting to kick off plug at 11,161'. |
2778411 | Primary Facility | 2018-09-20 | Drilling/Alteration | No Violations Noted | Rig is currently setting up to pressure test pressure control system for effective down hole mud weight control system. Hole depth 11,355'.
Intermediate 9 5/8" cement job did not circulate cement to surface. Operator properly notified department and proposed following remedial action plan: As discussed on the phone we pumped the 9-5/8¿ intermediate II cement job on 9/17, maintained returns throughout the job and did not achieve cement to surface. On Tuesday 9/18 we performed a CBL (see attached) and found top of cement at 7,080¿ as confirmed in house and by the service company engineer. Our plan forward: Rig up Managed Pressure Drilling equipment Perform casing integrity test Drill out shoe track, and 10¿ of new formation Perform formation integrity test to 19.0 ppg EMW Drill 8-1/2¿ hole section to TD Rationale: Previous casing strings (Surface, Coal, Intermediate) all successfully cemented to surface ¿ isolating fresh water and coal voids 9-5/8¿ TOC satisfies main cement objectives ¿ isolate Salina |
2807744 | Primary Facility | 2018-11-28 | Drilling/Alteration | No Violations Noted | Currently at 17,696' circulating 16.0 ppg mud, up from 15.7 ppg while on hold due to hunting. Planned TD @ 22,200'. On site inspection shows no apparent violations. NOVIO |
For data sources see[7]