If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26972 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.819222,"lon":-80.342969,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Jackson Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153074 | |
Farm/Lease Name: POLAR VORTEX 8H | |
License Status: | |
Spud Date: | |
Permit Date: 2015-10-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.819222 | |
Longitude: -80.342969 |
Date | Event |
---|---|
2015-10-16 | New Permit Application |
2016-09-22 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-16 | 2017-11-02 | 7,963 | 22,785,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 DBNPA | WST | Biocide | Listed Below | ||||
ICA-800 | Silverback Chemical | Anti-scalant | Listed Below | |||||
Water | USWS | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.3965 | 190,147,000.0 | |
LD-2950 | Multi-Chem | Friction Reducer | Listed Below | |||||
InsituCide | Silver Creek Services | Biocide Promoter | Listed Below | |||||
Sand (Proppant) | USWS | Proppant | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 30 | 0.00216357 | 4654.01 | |
AI-303 | USWS | Corrosion Inhibitior | Water | 7732-18-5 | 30 | 0.00216357 | 4654.01 | |
WFRA-405 | USWS | Friction Reducer | Listed Below | |||||
WFRC-2350 | USWS | Friction Reducer | Listed Below | |||||
SI-117 | WST | Scale Inhibitor | Listed Below | |||||
Hydrochloric Acid (15%) | USWS | Acidizing | Listed Below | |||||
DETA phosphonate | 15827-60-8 | 20 | 0.00166933 | 3590.85 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00004837 | 104.05 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.00253847 | 5460.43 | ||||
Hexamethylene triamine penta (methylene phosphonic acid) | 34690-00-1 | 20 | 0.00166933 | 3590.85 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.0015145 | 3257.8 | ||||
Oxyalkylated alcohol | Proprietary | 5 | 0.000590182 | 1269.53 | ||||
Acetophenone, thiourea, formaldehyde polymer | 68527-49-1 | 5 | 0.00000359 | 7.727 | ||||
2-Propenoic Acid, Polymer with 2-Propenamide | 9003-06-9 | 30 | 0.00159758 | 3436.5 | ||||
Copolymer of maleic and acrylic acid | 52255-49-9 | 70 | 0.00584266 | 12568 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0152308 | 32762.6 | ||||
Polyether | Proprietary | 10 | 0.00000718 | 15.454 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00002874 | 61.815 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 20 | 0.00166933 | 3590.85 | ||||
Formic acid | 64-18-6 | 20 | 0.00001437 | 30.907 | ||||
Silica Substrate | 14808-60-7 | 100 | 11.2817 | 24,267,900.0 | ||||
Hydrotreated Light Distillate (Petroleum) | 64742-47-8 | 30 | 0.00159758 | 3436.5 | ||||
Inorganic salt | Proprietary | 10 | 0.00118036 | 2539.05 | ||||
Hydrotreated Light Distillate (Petroleum) | 64742-47-8 | 30 | 0.00159758 | 3436.5 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.00360596 | 7756.68 | ||||
Polycarboxylic acid salt mixture | Proprietary | 40 | 0.000165032 | 354.996 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.0015145 | 3257.8 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001437 | 30.907 | ||||
Hypochlorous acid, sodium salt | 7681-52-9 | 12.5 | 0.000990426 | 2130.48 | ||||
Alkyl alcohol | Proprietary | 10 | 0.00118036 | 2539.05 | ||||
Formic acid | 64-18-6 | 20 | 0.00001437 | 30.907 | ||||
Copolymer of maleic and acrylic acid | 52255-49-9 | 70 | 0.00584266 | 12568 | ||||
Polycarboxylic acid salt mixture | Proprietary | 40 | 0.000165032 | 354.996 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 20 | 0.00166933 | 3590.85 | ||||
Poly(oxy-1,2-ethanediyl)-alpha-tridecyl-omega-hydroxy-branche d |
69011-36-5 | 5 | 0.00253847 | 5460.43 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001437 | 30.907 | ||||
Acetophenone, thiourea, formaldehyde polymer | 68527-49-1 | 5 | 0.00000359 | 7.727 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0342459 | 73665.5 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.000290227 | 624.3 | ||||
DETA phosphonate | 15827-60-8 | 20 | 0.00166933 | 3590.85 | ||||
Hexamethylene triamine penta (methylene phosphonic acid) | 34690-00-1 | 20 | 0.00166933 | 3590.85 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001437 | 30.907 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.00360596 | 7756.68 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001437 | 30.907 | ||||
2-Propenoic Acid, Polymer with 2-Propenamide | 9003-06-9 | 30 | 0.00159758 | 3436.5 | ||||
Polyether | Proprietary | 10 | 0.00000718 | 15.454 | ||||
Hypochlorous acid, sodium salt | 7681-52-9 | 12.5 | 0.000990426 | 2130.48 | ||||
Hydrotreated light distillate | 64742-47-8 | 30 | 0.00354109 | 7617.15 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00002874 | 61.815 | ||||
Silver FR-543 | Silverback Chemical | Friction Reducer | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 168,846.00 | 11 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 7,183,067.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 3,658,867.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 65.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 158.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 7.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 101.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 57.06 Tons | LANDFILL | 100620 |
2016 | RICE DRILLING B LLC | Produced Fluid | 53.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 656.25 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 625.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 511.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 144.15 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 4.96 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 1.51 Tons | LANDFILL | 06-08438 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 13.40 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 38.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 0.93 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 78.74 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 3.55 Tons | LANDFILL | CID # 28726 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 21.71 Tons | LANDFILL | 100620 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 7.34 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 693.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 778.50 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 0.66 Tons | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2017 | RICE DRILLING B LLC | Produced Fluid | 402.75 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 79.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 244.38 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 28.71 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 25.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 136.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 55.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 4.14 Tons | LANDFILL | 100419 |
2017 | RICE DRILLING B LLC | Produced Fluid | 73.92 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 668.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Servicing Fluid | 2.38 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 58.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 113.75 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 308.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 3.55 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Soil Contaminated by Oil | 52.37 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Produced Fluid | 424.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Produced Fluid | 2,448.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 75.47 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2018 | RICE DRILLING B LLC | Produced Fluid | 75.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 3,509.81 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 117.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 16.25 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 27.31 Bbl | INJECTION DISPOSAL WELL | 34-167-28462 |
2018 | RICE DRILLING B LLC | Produced Fluid | 3,344.70 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 52.37 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Produced Fluid | 11.71 Tons | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2018 | RICE DRILLING B LLC | Produced Fluid | 47.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2018 | RICE DRILLING B LLC | Produced Fluid | 26.97 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil | 1.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | RICE DRILLING B LLC | Produced Fluid | 111.66 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 1.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 237.50 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 5,035.15 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 26.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 116.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2503793 | Primary Facility | 2016-07-08 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled yet. |
2513700 | Primary Facility | 2016-07-14 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2514369 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. |
2514677 | Primary Facility | 2016-07-26 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled. |
2514823 | Primary Facility | 2016-08-01 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2517195 | Primary Facility | 2016-08-04 | Routine/Complete Inspection | No Violations Noted | Site being constructed. Well not drilled. |
2517318 | Primary Facility | 2016-08-10 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. |
2517400 | Primary Facility | 2016-08-16 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2517961 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled at time of inspection. |
2518277 | Primary Facility | 2016-09-01 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled at time of inspection. |
2522532 | Primary Facility | 2016-09-26 | Drilling/Alteration | No Violations Noted | Well spud on 9/22/2016. Operator drilled 36-inch borehole and set and cemented 26-inch conductor pipe at 40 ft. Cylindrical well cellar installed around conductor. Cellar floor cemented around conductor. |
2526673 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | No Violations Noted | Site under construction. Well not drilled. |
2528695 | Primary Facility | 2016-09-14 | Routine/Complete Inspection | No Violations Noted | Well site under construction. Well not drilled. Pre-spud inspection. |
2531751 | Primary Facility | 2016-10-13 | Routine/Complete Inspection | No Violations Noted | Well has been spud. Commencment of drilling activity expected. |
2537092 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Well spud on 9/22/2016. Conductor cemented in place. Operator currently rigging up on Polar Vortex 2H 059-26969. |
2538145 | Primary Facility | 2016-10-24 | Routine/Complete Inspection | No Violations Noted | Well conductor set. Continuation of drilling to commence in the near future. |
2543477 | Primary Facility | 2016-12-09 | Drilling/Alteration | No Violations Noted | Operator has set surface and coal protective casings. Surface casing (20”) was set @ 245’ and cemented to the surface by the displacement method with 35 bbls of cement circulated to the surface. Coal protective casing (13 3/8”) was set @ 1,152’ and cemented the surface by the displacement method with 15 bbls of cement circulated to the surface. Operator TIIH. |
2574721 | Primary Facility | 2017-03-13 | Routine/Complete Inspection | No Violations Noted | On March 13, 2017, the Department performed an inspection of the Rice Energy Polar Vortex well pad site. The site is located in Jackson Township, Greene county. The inspection was a routine complete inspection during drilling activity.
The operator is currently completing installation of secondary containment and is moving rig on site to complete drilling of lateral sections on the four wells on site. Well drilled to TVD and awaiting drilling resumption to complete drilling to TD. |
2577981 | Primary Facility | 2017-03-29 | Drilling/Alteration | No Violations Noted | Patterson rig # 349. Well has been drilled to total depth. Production casing set and cemented @ 19,423’ on 3/27/17. Operator estimates TOC @ 2,100’ |
2708382 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | On March 8, 2018, the Department performed an inspection of the EQT/Rice Energy Polar Vortex well pad site. The site is located in Jackson Twp., Greene Co. The inspection was CEI related to violations noted on 9/28/17 and 12/7/17.
The operator has finished flow back operations on the recently hydraulically fractured wells on the site. The flow back equipment has been removed. The operator has remediated the two reported frac fluid releases on the well pad. The operator has recently completed construction of the PCSM structures on the site. 4 wells have been drilled to TD on the site, and have been equipped for production. |
2822432 | Primary Facility | 2019-01-04 | Routine/Complete Inspection | No Violations Noted | The well is properly identified, equipped for production, and is producing. |
For data sources see[8]