X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26972

Well Details

Well ID: 37-059-26972
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jackson Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 153074
Farm/Lease Name: POLAR VORTEX 8H
License Status:
Spud Date:
Permit Date: 2015-10-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.819222
Longitude: -80.342969

For data sources see[1][2][3]

Well History

Date Event
2015-10-16 New Permit Application
2016-09-22 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-16 2017-11-02 7,963 22,785,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 K-BAC 1020 DBNPA WST Biocide Listed Below
ICA-800 Silverback Chemical Anti-scalant Listed Below
Water USWS Carrier/Base Fluid Water 7732-18-5 100 88.3965 190,147,000.0
LD-2950 Multi-Chem Friction Reducer Listed Below
InsituCide Silver Creek Services Biocide Promoter Listed Below
Sand (Proppant) USWS Proppant Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 30 0.00216357 4654.01
AI-303 USWS Corrosion Inhibitior Water 7732-18-5 30 0.00216357 4654.01
WFRA-405 USWS Friction Reducer Listed Below
WFRC-2350 USWS Friction Reducer Listed Below
SI-117 WST Scale Inhibitor Listed Below
Hydrochloric Acid (15%) USWS Acidizing Listed Below
DETA phosphonate 15827-60-8 20 0.00166933 3590.85
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00004837 104.05
Ethoxylated alcohol Proprietary 5 0.00253847 5460.43
Hexamethylene triamine penta (methylene phosphonic acid) 34690-00-1 20 0.00166933 3590.85
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.0015145 3257.8
Oxyalkylated alcohol Proprietary 5 0.000590182 1269.53
Acetophenone, thiourea, formaldehyde polymer 68527-49-1 5 0.00000359 7.727
2-Propenoic Acid, Polymer with 2-Propenamide 9003-06-9 30 0.00159758 3436.5
Copolymer of maleic and acrylic acid 52255-49-9 70 0.00584266 12568
Hydrotreated light petroleum distillate 64742-47-8 30 0.0152308 32762.6
Polyether Proprietary 10 0.00000718 15.454
Ethylene glycol 107-21-1 40 0.00002874 61.815
Phosphino carboxylic acid polymer 71050-62-9 20 0.00166933 3590.85
Formic acid 64-18-6 20 0.00001437 30.907
Silica Substrate 14808-60-7 100 11.2817 24,267,900.0
Hydrotreated Light Distillate (Petroleum) 64742-47-8 30 0.00159758 3436.5
Inorganic salt Proprietary 10 0.00118036 2539.05
Hydrotreated Light Distillate (Petroleum) 64742-47-8 30 0.00159758 3436.5
Polyethylene glycol 25322-68-3 50 0.00360596 7756.68
Polycarboxylic acid salt mixture Proprietary 40 0.000165032 354.996
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.0015145 3257.8
Cinnamaldehyde 104-55-2 20 0.00001437 30.907
Hypochlorous acid, sodium salt 7681-52-9 12.5 0.000990426 2130.48
Alkyl alcohol Proprietary 10 0.00118036 2539.05
Formic acid 64-18-6 20 0.00001437 30.907
Copolymer of maleic and acrylic acid 52255-49-9 70 0.00584266 12568
Polycarboxylic acid salt mixture Proprietary 40 0.000165032 354.996
Phosphino carboxylic acid polymer 71050-62-9 20 0.00166933 3590.85
Poly(oxy-1,2-ethanediyl)-alpha-tridecyl-omega-hydroxy-branche
d
69011-36-5 5 0.00253847 5460.43
Butyl cellosolve 111-76-2 20 0.00001437 30.907
Acetophenone, thiourea, formaldehyde polymer 68527-49-1 5 0.00000359 7.727
Hydrochloric Acid 7647-01-0 15 0.0342459 73665.5
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.000290227 624.3
DETA phosphonate 15827-60-8 20 0.00166933 3590.85
Hexamethylene triamine penta (methylene phosphonic acid) 34690-00-1 20 0.00166933 3590.85
Cinnamaldehyde 104-55-2 20 0.00001437 30.907
Polyethylene glycol 25322-68-3 50 0.00360596 7756.68
Butyl cellosolve 111-76-2 20 0.00001437 30.907
2-Propenoic Acid, Polymer with 2-Propenamide 9003-06-9 30 0.00159758 3436.5
Polyether Proprietary 10 0.00000718 15.454
Hypochlorous acid, sodium salt 7681-52-9 12.5 0.000990426 2130.48
Hydrotreated light distillate 64742-47-8 30 0.00354109 7617.15
Ethylene glycol 107-21-1 40 0.00002874 61.815
Silver FR-543 Silverback Chemical Friction Reducer Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2017 RICE DRILLING B LLC 168,846.00 11 0.00 0 0.00 0
2018 RICE DRILLING B LLC 7,183,067.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 3,658,867.00 362 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 RICE DRILLING B LLC Drilling Fluid Waste 65.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 158.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Drilling Fluid Waste 101.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Drill Cuttings 57.06 Tons LANDFILL 100620
2016 RICE DRILLING B LLC Produced Fluid 53.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Drill Cuttings 656.25 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Drilling Fluid Waste 625.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Drilling Fluid Waste 511.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 144.15 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 RICE DRILLING B LLC Drilling Fluid Waste 4.96 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Drill Cuttings 1.51 Tons LANDFILL 06-08438
2017 RICE DRILLING B LLC Drill Cuttings 13.40 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 38.75 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 RICE DRILLING B LLC Synthetic Liner Materials 0.93 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 78.74 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 3.55 Tons LANDFILL CID # 28726
2017 RICE DRILLING B LLC Drill Cuttings 21.71 Tons LANDFILL 100620
2017 RICE DRILLING B LLC Synthetic Liner Materials 7.34 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 75.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 RICE DRILLING B LLC Produced Fluid 693.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 778.50 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 9.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 0.66 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 RICE DRILLING B LLC Produced Fluid 402.75 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 79.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2014-4
2017 RICE DRILLING B LLC Drill Cuttings 244.38 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 25.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 136.25 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 RICE DRILLING B LLC Drilling Fluid Waste 55.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Synthetic Liner Materials 4.14 Tons LANDFILL 100419
2017 RICE DRILLING B LLC Produced Fluid 73.92 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 668.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Servicing Fluid 2.38 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 58.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RICE DRILLING B LLC Drilling Fluid Waste 113.75 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 308.50 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 RICE DRILLING B LLC Soil Contaminated by Oil 3.55 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Soil Contaminated by Oil 52.37 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 424.19 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 RICE DRILLING B LLC Produced Fluid 2,448.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 75.47 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018 RICE DRILLING B LLC Produced Fluid 75.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RICE DRILLING B LLC Produced Fluid 3,509.81 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 117.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 16.25 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 27.31 Bbl INJECTION DISPOSAL WELL 34-167-28462
2018 RICE DRILLING B LLC Produced Fluid 3,344.70 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 52.37 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 11.71 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 RICE DRILLING B LLC Produced Fluid 47.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2018 RICE DRILLING B LLC Produced Fluid 26.97 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 RICE DRILLING B LLC Soil Contaminated by Oil 1.00 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 RICE DRILLING B LLC Produced Fluid 111.66 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 1.00 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 237.50 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 5,035.15 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 26.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 116.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2503793 Primary Facility 2016-07-08 Routine/Complete Inspection No Violations Noted Site being constructed. Well not drilled yet.
2513700 Primary Facility 2016-07-14 Routine/Complete Inspection No Violations Noted Site under construction. Well not drilled.
2514369 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted Well site under construction. Well not drilled.
2514677 Primary Facility 2016-07-26 Routine/Complete Inspection No Violations Noted Site being constructed. Well not drilled.
2514823 Primary Facility 2016-08-01 Routine/Complete Inspection No Violations Noted Site under construction. Well not drilled.
2517195 Primary Facility 2016-08-04 Routine/Complete Inspection No Violations Noted Site being constructed. Well not drilled.
2517318 Primary Facility 2016-08-10 Routine/Complete Inspection No Violations Noted Well site under construction. Well not drilled.
2517400 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted Site under construction. Well not drilled.
2517961 Primary Facility 2016-08-24 Routine/Complete Inspection No Violations Noted Site under construction. Well not drilled at time of inspection.
2518277 Primary Facility 2016-09-01 Routine/Complete Inspection No Violations Noted Well site under construction. Well not drilled at time of inspection.
2522532 Primary Facility 2016-09-26 Drilling/Alteration No Violations Noted Well spud on 9/22/2016. Operator drilled 36-inch borehole and set and cemented 26-inch conductor pipe at 40 ft. Cylindrical well cellar installed around conductor. Cellar floor cemented around conductor.
2526673 Primary Facility 2016-09-06 Routine/Complete Inspection No Violations Noted Site under construction. Well not drilled.
2528695 Primary Facility 2016-09-14 Routine/Complete Inspection No Violations Noted Well site under construction. Well not drilled. Pre-spud inspection.
2531751 Primary Facility 2016-10-13 Routine/Complete Inspection No Violations Noted Well has been spud. Commencment of drilling activity expected.
2537092 Primary Facility 2016-11-10 Drilling/Alteration No Violations Noted Well spud on 9/22/2016. Conductor cemented in place. Operator currently rigging up on Polar Vortex 2H 059-26969.
2538145 Primary Facility 2016-10-24 Routine/Complete Inspection No Violations Noted Well conductor set. Continuation of drilling to commence in the near future.
2543477 Primary Facility 2016-12-09 Drilling/Alteration No Violations Noted Operator has set surface and coal protective casings. Surface casing (20”) was set @ 245’ and cemented to the surface by the displacement method with 35 bbls of cement circulated to the surface. Coal protective casing (13 3/8”) was set @ 1,152’ and cemented the surface by the displacement method with 15 bbls of cement circulated to the surface. Operator TIIH.
2574721 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted On March 13, 2017, the Department performed an inspection of the Rice Energy Polar Vortex well pad site. The site is located in Jackson Township, Greene county. The inspection was a routine complete inspection during drilling activity.

The operator is currently completing installation of secondary containment and is moving rig on site to complete drilling of lateral sections on the four wells on site.

Well drilled to TVD and awaiting drilling resumption to complete drilling to TD.

2577981 Primary Facility 2017-03-29 Drilling/Alteration No Violations Noted Patterson rig # 349. Well has been drilled to total depth. Production casing set and cemented @ 19,423’ on 3/27/17. Operator estimates TOC @ 2,100’
2708382 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted On March 8, 2018, the Department performed an inspection of the EQT/Rice Energy Polar Vortex well pad site. The site is located in Jackson Twp., Greene Co. The inspection was CEI related to violations noted on 9/28/17 and 12/7/17.

The operator has finished flow back operations on the recently hydraulically fractured wells on the site. The flow back equipment has been removed. The operator has remediated the two reported frac fluid releases on the well pad. The operator has recently completed construction of the PCSM structures on the site.

4 wells have been drilled to TD on the site, and have been equipped for production.

2822432 Primary Facility 2019-01-04 Routine/Complete Inspection No Violations Noted The well is properly identified, equipped for production, and is producing.

For data sources see[8]

References