X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26675

Well Details

Well ID: 37-059-26675
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morris Township
Operator Name: EQT PROD CO
Well Pad ID: 151394
Farm/Lease Name: JOHNSTON 592955
License Status: Active
Spud Date: 2014-12-05
Permit Date: 2014-10-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.978953
Longitude: -80.289247

For data sources see[1][2][3]

Well History

Date Event
2014-10-14 New Permit Application
2014-12-06 Performed Spud Operation
2015-09-30 Drilling Completion
2016-03-26 Perforation
2016-03-26 Performed Stage 1 of Stimulation
2016-03-26 Performed Stage 2 of Stimulation
2016-03-26 Performed Stage 3 of Stimulation
2016-03-26 Performed Stage 4 of Stimulation
2016-03-26 Performed Stage 5 of Stimulation
2016-03-27 Perforation
2016-03-27 Performed Stage 10 of Stimulation
2016-03-27 Performed Stage 6 of Stimulation
2016-03-27 Performed Stage 7 of Stimulation
2016-03-27 Performed Stage 8 of Stimulation
2016-03-27 Performed Stage 9 of Stimulation
2016-03-28 Perforation
2016-03-28 Performed Stage 11 of Stimulation
2016-03-28 Performed Stage 12 of Stimulation
2016-03-28 Performed Stage 13 of Stimulation
2016-03-28 Performed Stage 14 of Stimulation
2016-03-28 Performed Stage 15 of Stimulation
2016-03-28 Performed Stage 16 of Stimulation
2016-03-29 Perforation
2016-03-29 Performed Stage 17 of Stimulation
2016-03-29 Performed Stage 18 of Stimulation
2016-03-29 Performed Stage 19 of Stimulation
2016-03-29 Performed Stage 20 of Stimulation
2016-03-29 Performed Stage 21 of Stimulation
2016-03-29 Performed Stage 22 of Stimulation
2016-03-30 Perforation
2016-03-30 Performed Stage 23 of Stimulation
2016-03-30 Performed Stage 24 of Stimulation
2016-03-30 Performed Stage 25 of Stimulation
2016-03-30 Performed Stage 26 of Stimulation
2016-03-30 Performed Stage 27 of Stimulation
2016-03-30 Performed Stage 28 of Stimulation
2016-03-31 Perforation
2016-03-31 Performed Stage 29 of Stimulation
2016-03-31 Performed Stage 30 of Stimulation
2016-03-31 Performed Stage 31 of Stimulation
2016-03-31 Performed Stage 32 of Stimulation
2016-03-31 Performed Stage 33 of Stimulation
2016-03-31 Performed Stage 34 of Stimulation
2016-04-01 Perforation
2016-04-01 Performed Stage 35 of Stimulation
2016-04-01 Performed Stage 36 of Stimulation
2016-04-01 Performed Stage 37 of Stimulation
2016-04-01 Performed Stage 38 of Stimulation
2016-04-01 Performed Stage 39 of Stimulation
2016-04-01 Performed Stage 40 of Stimulation
2016-04-01 Performed Stage 41 of Stimulation
2016-04-02 Perforation
2016-04-02 Performed Stage 42 of Stimulation
2016-04-02 Performed Stage 43 of Stimulation
2016-04-02 Performed Stage 44 of Stimulation
2016-04-02 Performed Stage 45 of Stimulation
2016-04-02 Performed Stage 46 of Stimulation
2018-10-18 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-26 2016-04-02 7,743 10,418,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-150 FTS International Acid corrosion inhibitor Dimethylformamide 68-12-2 10 0.00004107 39.655
Quaternary ammonium compound Proprietary 10 0.00004107 39.655
Ethylene glycol 107-21-1 30 0.0001232 118.966
Organic amine resin salt Proprietary 30 0.0001232 118.966
Aromatic aldehyde Proprietary 10 0.00004107 39.655
Isopropanol 67-63-0 30 0.0001232 118.966
MC MX 5-3886 Multi-Chem Group Specialty Brine Calcium Nitrate.4H2O 13477-34-4 100 0.110242 106453
Sand (Proppant) FTS International Proppant Silica Substrate 14808-60-7 100 9.53373 9,206,090.0
FRW-900 FTS International Friction Reducer Alkyl Alcohol Proprietary 10 0.00018086 174.644
Oxyalkylated alcohol A Proprietary 5 0.00009043 87.322
Hydrotreated Light Distillate 64742-47-8 30 0.000542579 523.932
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 90.0336 86,939,400.0
MC MX 8-2544 Multi-Chem Group Nitrate Reducing Bacteria Sodium nitrate 7631-99-4 5 0.000489094 472.285
Sodium chloride 7647-14-5 100 0.00978188 9445.7
Hydrochloric Acid (15%) FTS International Acidizing Hydrochloric Acid 7647-01-0 15 0.033289 32144.9
LD-2250 Multi-Chem Group Friction Reducer Ethoxylated alcohol Proprietary 5 0.00254985 2462.22
Polyacrylate Proprietary 30 0.0152991 14773.3
Hydrotreated light petroleum distillate 64742-47-8 30 0.0152991 14773.3
Sodium chloride 7647-14-5 5 0.00254985 2462.22
Fatty nitrogen derived amides Proprietary 5 0.00254985 2462.22
CS-500-SI FTS International Scale inhibitor Ethylene glycol 107-21-1 10 0.00249257 2406.91
LD-2550 Multi-Chem Group Additive Sodium chloride 7647-14-5 10 0.00126062 1217.29
Inner salt of alkyl amines Proprietary 60 0.0075637 7303.76

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-03-26 1 Sand 125,370 9,113 9,421
2016-03-26 2 Sand 125,370 9,125 9,375
2016-03-26 3 Sand 125,370 9,137 9,355
2016-03-26 4 Sand 125,370 9,113 9,490
2016-03-26 5 Sand 125,370 9,188 9,455
2016-03-27 6 Sand 125,370 9,294 9,488
2016-03-27 7 Sand 125,370 9,152 9,443
2016-03-27 8 Sand 125,370 9,105 9,441
2016-03-27 9 Sand 125,370 9,046 9,385
2016-03-27 10 Sand 125,370 9,177 9,412
2016-03-28 11 Sand 125,370 9,269 9,453
2016-03-28 12 Sand 125,370 9,034 9,335
2016-03-28 13 Sand 125,370 9,067 9,334
2016-03-28 14 Sand 125,370 9,175 9,431
2016-03-28 15 Sand 125,370 9,097 9,347
2016-03-28 16 Sand 125,370 8,973 9,381
2016-03-29 17 Sand 125,370 8,919 9,181
2016-03-29 18 Sand 125,370 8,723 8,991
2016-03-29 19 Sand 125,370 9,191 9,457
2016-03-29 20 Sand 125,370 8,744 9,176
2016-03-29 21 Sand 125,370 9,099 9,544
2016-03-29 22 Sand 125,370 9,095 9,490
2016-03-30 23 Sand 125,370 8,995 9,508
2016-03-30 24 Sand 125,370 8,633 8,958
2016-03-30 25 Sand 125,370 8,570 8,917
2016-03-30 26 Sand 125,370 8,250 8,649
2016-03-30 27 Sand 125,370 8,754 9,504
2016-03-30 28 Sand 125,370 8,997 9,555
2016-03-31 29 Sand 125,370 8,911 9,512
2016-03-31 30 Sand 125,370 8,657 9,257
2016-03-31 31 Sand 125,370 8,603 9,026
2016-03-31 32 Sand 125,370 8,568 9,500
2016-03-31 33 Sand 125,370 8,349 8,715
2016-03-31 34 Sand 125,370 8,599 8,915
2016-04-01 35 Sand 125,370 8,458 9,306
2016-04-01 36 Sand 125,370 8,096 8,671
2016-04-01 37 Sand 125,370 8,263 8,647
2016-04-01 38 Sand 125,370 8,314 9,214
2016-04-01 39 Sand 125,370 7,805 8,338
2016-04-01 40 Sand 125,370 7,996 8,602
2016-04-01 41 Sand 125,370 8,200 9,321
2016-04-02 42 Sand 125,370 8,007 9,345
2016-04-02 43 Sand 125,370 8,259 9,295
2016-04-02 44 Sand 125,370 8,663 9,288
2016-04-02 45 Sand 125,370 8,713 9,501
2016-04-02 46 Sand 125,370 8,619 9,471

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 1,053,681.00 142 0.00 0 0.00 0
2017 EQT PROD CO 1,412,219.00 365 0.00 0 0.00 0
2018 EQT PROD CO 811,997.00 365 0.00 0 0.00 0
2019 EQT PROD CO 672,097.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Drilling Fluid Waste 2,100.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Drill Cuttings 1,403.72 Tons LANDFILL 100419
2015 EQT PROD CO Produced Fluid 115.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Servicing Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 325.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Fracturing Fluid Waste 1,730.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 920.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016 EQT PROD CO Produced Fluid 210.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 EQT PROD CO Fracturing Fluid Waste 40.95 Tons LANDFILL 100277
2016 EQT PROD CO Produced Fluid 310.00 Bbl INJECTION DISPOSAL WELL 34-167-2-9543
2016 EQT PROD CO Fracturing Fluid Waste 3,860.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Fracturing Fluid Waste 1,190.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Other Oil & Gas Wastes 4.46 Tons LANDFILL 100419
2016 EQT PROD CO Produced Fluid 2,440.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 64,615.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 110.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Other Oil & Gas Wastes 590.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 2,760.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 EQT PROD CO Produced Fluid 590.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 EQT PROD CO Produced Fluid 7,160.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 35.17 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018 EQT PROD CO Other Oil & Gas Wastes 38.50 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 799.89 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 181.51 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 285.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 112.05 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Produced Fluid 7.16 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Other Oil & Gas Wastes 37.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 333.29 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 8.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 134.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 181.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 1,689.38 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 29.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2336870 Primary Facility 2014-10-16 Routine/Complete Inspection No Violations Noted Well not drilled, pre-spud inspection.
2337266 Primary Facility 2015-01-12 Routine/Complete Inspection No Violations Noted
2338816 Primary Facility 2015-01-21 Drilling/Alteration No Violations Noted 20" conductor pipe set @ 53'
2343822 Primary Facility 2015-02-04 Follow-up Inspection No Violations Noted
2362865 Primary Facility 2015-04-10 Drilling/Alteration No Violations Noted drilled and set 9 5/8' @ 2688'; cemented casing with cement returns of 45 bbls; plug down 4/5/15
2418996 Primary Facility 2015-10-01 Drilling/Alteration No Violations Noted Pioneer Rig 70. Well drilled to 15,040’ MD. Running 5 ½” production casing into hole. Operator anticipates cementing production casing on 10/2/15.
2530186 Primary Facility 2016-10-05 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.
2554833 Primary Facility 2017-01-18 Routine/Complete Inspection No Violations Noted Well properly identified and tagged. Well is equipped with production equipment and production tanks.
2556674 Primary Facility 2017-01-20 Incident- Response to Accident or Event In Compliance with Policy Incident response/site meeting
2734946 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted On Monday, May 14, 2018, I conducted a routine-complete inspection at the Johnston Well Site located in Morris Township, Greene County.

Gas well 592955 and the associated infrastructure appeared to be in good condition and functioning properly. The well was tagged.

No violations were identified during the inspection.

2808871 Primary Facility 2018-11-27 Routine/Complete Inspection No Violations Noted On Tuesday November 27, 2018 I conducted a routine-complete inspection at the Johnston Well Site located in Morris Township, Greene County.

The gas well and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification.

No violations were identified during the inspection.

For data sources see[9]

References