X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26355

Well Details

Well ID: 37-059-26355
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 150676
Farm/Lease Name: ALPHA 1 592150
License Status:
Spud Date:
Permit Date: 2014-01-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.942392
Longitude: -80.130586

For data sources see[1][2][3]

Well History

Date Event
2014-01-09 New Permit Application
2014-04-30 Performed Spud Operation
2014-05-08 New Permit Application
2014-09-26 Drilling Completion
2014-11-23 Performed Stimulation
2014-11-24 Perforation
2016-03-09 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-23 2014-12-06 7,799 15,971,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Group Proppant Silica Substrate 14808-60-7 100 9.85446 14,618,000.0
Hydrochloric Acid (15%) Keane Group Acidizing Hydrochloric Acid 7647-01-0 15 0.0305222 45276.2
EC6111A Keane Group Biocide Glutaraldehyde 111-30-8 30 0.00317439 4708.85
SL 1014/1072 Keane Group Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 25 0.0200516 29744.2
LEB-10X Keane Group Gel breaker Ethylene Glycol 107-21-1 30 0.000117463 174.244
AI 600 Keane Group Acid corrosion inhibitor 1-Octanol 111-87-5 2.5 0.00001272 18.87
Ispropanol 67-63-0 2.5 0.00001272 18.87
Poly(oxy-1,2-ethanediyl), .alpha.-(4-nonylphenyl)-.omega.-hydroxy-,branche
d
127087-87-0 5 0.00002544 37.739
N, N-Dimethylformamide 68-12-2 20 0.000101765 150.956
Triethyl phosphate 78-40-0 2.5 0.00001272 18.87
Cinnamaldehyde 104-55-2 15 0.00007632 113.217
Ethylene Glycol 107-21-1 40 0.000203529 301.912
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.00007632 113.217
1-Deconal 112-30-1 5 0.00002544 37.739
2-Butoxyethanol 111-76-2 15 0.00007632 113.217
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 89.8478 133,279,000.0
Chlorine Dioxide Solution - SVP - Pure Neptune Disinfectant/oxidizer Chlorine dioxide 10049-04-4 0.3 0.00000148 2.192
FRA 407 Keane Group Friction reducer Ammonium acetate 631-61-8 5 0.000102215 151.624
Petroleum distillates, hydrotreated light 64742-47-8 40 0.000817719 1212.99

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-11-23 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 1,606,031.00 165 0.00 0 0.00 0
2016 EQT PROD CO 2,100,376.00 366 0.00 0 0.00 0
2017 EQT PROD CO 1,124,528.00 344 0.00 0 0.00 0
2018 EQT PROD CO 832,395.00 365 0.00 0 0.00 0
2019 EQT PROD CO 691,471.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 EQT PROD CO Drill Cuttings 1,137.05 Tons LANDFILL 100419
2014 EQT PROD CO Drilling Fluid Waste 4,810.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracturing Fluid Waste 67.00 Tons LANDFILL SWF 1032-WV0109
2015 EQT PROD CO Drilling Fluid Waste 150.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracing Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Produced Fluid 2,200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Fracturing Fluid Waste 9.01 Tons LANDFILL 100277
2015 EQT PROD CO Fracing Fluid Waste 17,081.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 46,611.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracturing Fluid Waste 24.00 Tons LANDFILL 101397
2016 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 EQT PROD CO Produced Fluid 860.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Synthetic Liner Materials 15.00 Tons LANDFILL 100419
2016 EQT PROD CO Produced Fluid 1,000.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Other Oil & Gas Wastes 1.09 Tons LANDFILL 100277
2016 EQT PROD CO Produced Fluid 28,875.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 130.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 EQT PROD CO Produced Fluid 480.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1,965.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 24.24 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018 EQT PROD CO Other Oil & Gas Wastes 128.34 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 789.16 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 18.64 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 302.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 25.86 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 EQT PROD CO Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 363.92 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 227.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 1,018.04 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 126.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2269006 Primary Facility 2014-05-08 Drilling/Alteration No Violations Noted 26" conductor set @ 22'; Alpha Rig 5 moving on location;
2276115 Primary Facility 2014-05-03 Drilling/Alteration No Violations Noted Drilled to 240' TD; attempting to run 20" casing with threading issues and getting hung up in hole on the conductor pipe;
2280567 Primary Facility 2014-06-06 Drilling/Alteration No Violations Noted Drilled to 240'; set 20"casing to 214'; cemented to surface 6/4/14; Open mine @439-444'; drilling to casing point below mine at this time; location good;
2280599 Primary Facility 2014-06-12 Drilling/Alteration No Violations Noted 9 5/8" pipe run on 6/9/14;to 2954'; cemented well to surface; 11 bls cement returns;
2308692 Primary Facility 2014-09-23 Drilling/Alteration No Violations Noted Pilot hole @ 6700TD; KOP@6700'; presently drilling @ 15261'; walked location; no containment or drilling issues;
2318349 Primary Facility 2014-10-02 Drilling/Alteration No Violations Noted TD @ 16950; 5 1/2" set @ 16947'; cemented with plug down 9/26/14;
2338550 Primary Facility 2014-11-03 Routine/Complete Inspection No Violations Noted Well drilled. Well waiting to be fracked.
2376894 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted On 6/4/15, I inspected the Alpha 1 Pad as routine inspection and made the following observations:
2398869 Primary Facility 2015-07-28 Incident- Response to Accident or Event No Violations Noted On 7/28/15, I inspected the Alpha 1 site in response to an operator reported spill and made the following observations:
2399481 Primary Facility 2015-08-06 Follow-up Inspection No Violations Noted On 8/6/15, I performed a follow up inspection on the Alpha 1 site meeting with EQT representative Corey Giles to gather further information about a production fluid spill that occurred and was reported on 7/27/15:
2448358 Primary Facility 2016-02-04 Administrative/File Review No Violations Noted An administrative compliance evaluation inspection in response to the 8/6/15 Alpha 1 NOV indicates that as of 2/4/16 the situation is ready to be forwarded to the Environmental Cleanup Board. The dispensation of the site is as follows:

• On 7/27/15 EQT’s Corey Giles reported that “the containment for the sand tank accumulated 5,300 gallons of produced fluid. The containment overflowed releasing an additional 3-4 barrels to the pad surface.” • Administrative review of the initial clean up report and NOV response left some questions and issues unresolved. • An update to the initial response reviewed by DEP Kevin Maskol resolves all issues preventing the situation being taken over by ECB.

2532579 Primary Facility 2016-10-14 Routine/Complete Inspection No Violations Noted On 10/14/16 at approximately 1130 hours I conducted a routine complete inspection of the Alpha 1 pad. The Act 9 sign was in place and all required documents were present at the site. A drawing found in the mailbox (see photographs) roughly matched the site as constructed. According to Department records, this plan was not approved, nor were the changes made to the site.

Multiple violations of 102.5(m)(4) 102.5(c) were observed at the time of inspection and are listed below:

-The road to the south of the well pad was not constructed in the approved location -The gravel area to the south of the well pad was not constructed as approved and an increase in impervious area has resulted. -The location approved as an impoundment was constructed as an AST pad and is a significant increase in impervious area.

The area between the well pad, gravel pad to the south, and the location that was approved as an impoundment contained a large volume of water. The constructed features in this area are effectively working as

For data sources see[9]

References