If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24628 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.962947,"lon":-79.946842,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Luzerne Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 152396 | |
Farm/Lease Name: STEWART | |
License Status: Active | |
Spud Date: 2015-09-02 | |
Permit Date: 2015-07-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.962947 | |
Longitude: -79.946842 |
Date | Event |
---|---|
2015-07-17 | New Permit Application |
2015-09-02 | Performed Spud Operation |
2015-10-24 | Drilling Completion |
2016-04-27 | Perforation |
2018-01-26 | MOD |
2019-03-27 | Perforation |
2019-03-27 | Performed Stage 1 of Stimulation |
2019-03-28 | Perforation |
2019-03-28 | Performed Stage 2 of Stimulation |
2019-03-28 | Performed Stage 3 of Stimulation |
2019-03-29 | Perforation |
2019-03-29 | Performed Stage 4 of Stimulation |
2019-03-29 | Performed Stage 5 of Stimulation |
2019-03-30 | Perforation |
2019-03-30 | Performed Stage 6 of Stimulation |
2019-03-30 | Performed Stage 7 of Stimulation |
2019-03-31 | Perforation |
2019-03-31 | Performed Stage 8 of Stimulation |
2019-03-31 | Performed Stage 9 of Stimulation |
2019-04-01 | Perforation |
2019-04-01 | Performed Stage 10 of Stimulation |
2019-04-01 | Performed Stage 11 of Stimulation |
2019-04-02 | Perforation |
2019-04-02 | Performed Stage 12 of Stimulation |
2019-04-02 | Performed Stage 13 of Stimulation |
2019-04-03 | Perforation |
2019-04-03 | Performed Stage 14 of Stimulation |
2019-04-03 | Performed Stage 15 of Stimulation |
2019-04-04 | Perforation |
2019-04-04 | Performed Stage 16 of Stimulation |
2019-04-04 | Performed Stage 17 of Stimulation |
2019-04-05 | Perforation |
2019-04-05 | Performed Stage 18 of Stimulation |
2019-04-05 | Performed Stage 19 of Stimulation |
2019-04-05 | Performed Stage 20 of Stimulation |
2019-04-05 | Performed Stage 21 of Stimulation |
2019-04-06 | Perforation |
2019-04-06 | Performed Stage 22 of Stimulation |
2019-04-06 | Performed Stage 23 of Stimulation |
2019-04-07 | Perforation |
2019-04-07 | Performed Stage 24 of Stimulation |
2019-04-07 | Performed Stage 25 of Stimulation |
2019-04-08 | Perforation |
2019-04-09 | Perforation |
2019-04-10 | Perforation |
2019-04-11 | Perforation |
2019-04-12 | Perforation |
2019-04-13 | Perforation |
2019-04-14 | Perforation |
2019-04-15 | Perforation |
2019-04-16 | Perforation |
2019-04-17 | Perforation |
2019-04-19 | Perforation |
2019-04-20 | Perforation |
2019-04-21 | Perforation |
2019-04-22 | Perforation |
2019-04-23 | Perforation |
2019-04-24 | Perforation |
2019-04-25 | Perforation |
2019-04-26 | Perforation |
2019-04-27 | Perforation |
2019-04-28 | Perforation |
2019-11-27 | Deviated |
2019-11-27 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2019-03-27 | 1 | Ottawa | 0 | 10,234 | 8,383 |
2019-03-28 | 2 | Ottawa | 0 | 10,487 | 5,996 |
2019-03-28 | 3 | Ottawa | 0 | 10,381 | 6,213 |
2019-03-29 | 4 | Ottawa | 0 | 10,081 | 5,590 |
2019-03-29 | 5 | Ottawa | 0 | 10,549 | 5,774 |
2019-03-30 | 6 | Ottawa | 0 | 10,345 | 6,240 |
2019-03-30 | 7 | Ottawa | 0 | 10,457 | 63,650 |
2019-03-31 | 8 | Ottowa | 0 | 10,330 | 6,161 |
2019-03-31 | 9 | Ottawa | 0 | 10,431 | 6,787 |
2019-04-01 | 10 | Ottawa | 0 | 10,327 | 6,181 |
2019-04-01 | 11 | Ottawa | 0 | 10,367 | 6,355 |
2019-04-02 | 12 | Ottawa | 0 | 10,473 | 6,326 |
2019-04-02 | 13 | Ottawa | 0 | 10,033 | 6,205 |
2019-04-03 | 14 | Ottawa | 0 | 9,935 | 5,905 |
2019-04-03 | 15 | Ottawa | 0 | 10,173 | 6,736 |
2019-04-04 | 16 | Ottawa | 0 | 9,808 | 6,179 |
2019-04-04 | 17 | Ottawa | 0 | 9,502 | 6,663 |
2019-04-05 | 18 | Ottawa | 0 | 9,419 | 6,385 |
2019-04-05 | 19 | Ottawa | 0 | 9,491 | 6,070 |
2019-04-05 | 20 | Ottawa | 0 | 9,495 | 6,003 |
2019-04-05 | 21 | Ottawa | 0 | 9,614 | 6,524 |
2019-04-06 | 22 | Ottawa | 0 | 9,651 | 6,160 |
2019-04-06 | 23 | Ottawa | 0 | 9,730 | 6,371 |
2019-04-07 | 24 | Ottawa | 0 | 9,714 | 6,305 |
2019-04-07 | 25 | Ottawa | 0 | 10,024 | 7,304 |
26 | no info available-stage 26 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 1,615,128.00 | 146 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHEVRON APPALACHIA LLC | Waste Water Treatment Sludge | 80.49 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Drill Cuttings | 492.17 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 432.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 88.96 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Drill Cuttings | 104.99 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 31.43 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 413.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 117.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 16.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 0.53 Tons | LANDFILL | 100172 |
2018 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 4.61 Tons | LANDFILL | 100663 |
2018 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 7.04 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2019 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil & Gas Related Spills | 4.77 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 12.50 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Waste Water Treatment Sludge | 2.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 8.33 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,872.37 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 43.36 Tons | LANDFILL | 100172 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 105.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Drill Cuttings | 292.31 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drill Cuttings | 94.25 Tons | LANDFILL | 100172 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,083.49 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 249.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 20.13 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2019 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 15.93 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 411.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,193.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 199.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 7.14 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2019 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil | 4.77 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 7.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 0.26 Tons | LANDFILL | 100172 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 676.74 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2407195 | Primary Facility | 2015-09-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, Setting 30"conductor @ 40' today (9/2/2015). |
2408946 | Primary Facility | 2015-09-16 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, Drilling on air @ 350' (TD). Setting Water Protection Casing and cementing tonight (9/16/2015). |
2408958 | Primary Facility | 2015-09-18 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, Drilling on air @ 565' (TD). Setting Coal Protection Casing and cementing tonight (9/18/2015). |
2419580 | Primary Facility | 2015-10-23 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, Drilling on air @ 3197' (TD). Setting Intermediate Casing and cementing tonight (10/23/2015). During cementing of casing loss circulation occurred at end of job. Operator has agree to (CBL) to determine top of cement. |
2421231 | Primary Facility | 2015-09-01 | Routine/Complete Inspection | No Violations Noted | |
2495428 | Primary Facility | 2016-06-15 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Inspection for Inactive Status,well & site looks good. |
2581134 | Primary Facility | 2017-04-11 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated but there were locations along the access road that could use additional seeding. Small erosion rills were observed in several locations throughout the site. An erosion channel was observed in the swale between the AST pad. The wells had previously been spud, but additional drilling has not yet occurred. |
2611989 | Primary Facility | 2017-06-26 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated, but some erosion was observed in the swale between the AST pad and the access road. Six SPUD wells were present at the site. |
2638223 | Primary Facility | 2017-09-20 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated. A small erosion rill was observed between the AST pad and stockpile. The wells on the site had been previously SPUD. |
2658468 | Primary Facility | 2017-11-06 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and stable. The wells on site had been SPUD, but not drilled to TD. The wells are currently on inactive status. There were no violations observed at the time of inspection. |
2686513 | Primary Facility | 2018-01-19 | Routine/Complete Inspection | No Violations Noted | Inactive Status was approved (6/17/2016). Pending Permit issues being address now. |
2752603 | Primary Facility | 2018-07-17 | Drilling/Alteration | No Violations Noted | Highlands Rig #14 currently TTR @ 6735'. All seven wells on location are in stages of air rig build into the curve with 8 3/4" hole, operator will then load hole with mud and move off air. Fluid rig will follow to complete lateral. Location having issues with gas production above mine and are using cement pill plugs before drilling into mine to reduce or eliminate gas migration from uphole. On site inspection found no apparent violations. NOVIO |
2761371 | Primary Facility | 2018-08-07 | Drilling/Alteration | No Violations Noted | Operator has set 9 5/8" csg and drilled 8 3/4" hole into the kick, prepped well for triple to move on location to finish lateral. On site inspection showed no apparent violations. NOVIO |
2845966 | Primary Facility | 2019-02-15 | Compliance Evaluation | No Violations Noted | On 11/06/18 an Oil based mud spill had occurred at the site and an NOV was issued.
On 02/15/19 at approximately 1015 hours I conducted a CEI at the site. The Act 9 sign was in place and all required documents were present at the site. The impacted soils had been remediated and all contaminated equipment had been cleaned and removed from the site. The violations have been corrected and there were no violations observed at the time of inspection. |
For data sources see[8]