X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24617

Well Details

Well ID: 37-051-24617
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 152252
Farm/Lease Name: ZALAC UNIT
License Status: Active
Spud Date: 2015-05-13
Permit Date: 2015-01-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.904611
Longitude: -79.858172

For data sources see[1][2][3]

Well History

Date Event
2015-01-20 New Permit Application
2015-05-10 Performed Spud Operation
2015-09-15 Drilling Completion
2016-10-13 Perforation
2016-10-13 Performed Stage 1 of Stimulation
2016-10-14 Perforation
2016-10-14 Performed Stage 2 of Stimulation
2016-10-14 Performed Stage 3 of Stimulation
2016-10-15 Perforation
2016-10-15 Performed Stage 4 of Stimulation
2016-10-15 Performed Stage 5 of Stimulation
2016-10-16 Perforation
2016-10-16 Performed Stage 6 of Stimulation
2016-10-17 Perforation
2016-10-17 Performed Stage 7 of Stimulation
2016-10-17 Performed Stage 8 of Stimulation
2016-10-18 Perforation
2016-10-18 Performed Stage 10 of Stimulation
2016-10-18 Performed Stage 11 of Stimulation
2016-10-18 Performed Stage 9 of Stimulation
2016-10-19 Perforation
2016-10-19 Performed Stage 12 of Stimulation
2016-10-19 Performed Stage 13 of Stimulation
2016-10-19 Performed Stage 14 of Stimulation
2016-10-21 Perforation
2016-10-21 Performed Stage 15 of Stimulation
2016-10-21 Performed Stage 16 of Stimulation
2016-10-21 Performed Stage 17 of Stimulation
2016-10-22 Perforation
2016-10-22 Performed Stage 18 of Stimulation
2016-10-22 Performed Stage 19 of Stimulation
2016-10-22 Performed Stage 20 of Stimulation
2016-10-23 Perforation
2016-10-23 Performed Stage 21 of Stimulation
2016-10-23 Performed Stage 22 of Stimulation
2016-10-23 Performed Stage 23 of Stimulation
2016-10-24 Perforation
2016-10-24 Performed Stage 24 of Stimulation
2016-10-24 Performed Stage 25 of Stimulation
2016-10-24 Performed Stage 26 of Stimulation
2016-10-25 Perforation
2016-10-25 Performed Stage 27 of Stimulation
2016-10-25 Performed Stage 28 of Stimulation
2016-10-25 Performed Stage 29 of Stimulation
2016-10-25 Performed Stage 30 of Stimulation
2019-10-25 Perforation
2019-12-09 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-12 2016-10-25 8,358 9,913,890

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Thiourea 62-56-6 1 0
Triethanolamine Tri(Phosphate Ester), Sodium Salt 68171-29-9 30 0.00635
Alcohols, ethoxylated 68002-97-1 5 0.00459
Hydrogen Chloride 7647-01-0 7.5 0.08278
Alcohols, ethoxylated 68439-50-9 5 0.00459
Butyl diglycol 112-34-5 75 0.00027
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.02755
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.00291
Alcohols, ethoxylated 68551-12-2 5 0.00459
Formaldehyde 50-00-0 1 0
Ammonium Acetate 631-61-8 13 0.01194
Water 7732-18-5 100 86.9996
Ethylene Glycol 107-21-1 30 0.00635
Ethylene Glycol 107-21-1 30 0.00616
Water 7732-18-5 30 0.00415
Polyethylene Glycol 25322-68-3 50 0.00692
Methanol 67-56-1 5 0.00002000
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.00018
Silica 14808-60-7 99.9 11.7372
Scale Hib A Universal Well Services Scale Inhibitor Listed Below
K-Bac 1020 Universal Well Services Biocide Listed Below
Iron Control A Universal Well Services Iron Control Agent Listed Below
Unihib G Universal Well Services Acid Inhibitor Listed Below
Unislick ST50 Universal Well Services Friction Reducer Listed Below
Hydrochloric Acid (7.5%) Universal Well Services Acidizing Listed Below
Water Chevron Appalachia, LLC Carrier/Base Fluid Listed Below
Sand (Proppant) Universal Well Services Proppant Listed Below

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-10-13 1 Ottawa 468,555 9,250 8,467
2016-10-14 2 Ottawa 468,555 9,432 7,959
2016-10-14 3 Ottawa 468,555 9,514 8,154
2016-10-15 4 Ottawa 468,555 9,449 7,198
2016-10-15 5 Ottawa 468,555 9,440 7,308
2016-10-16 6 Ottawa 468,555 9,363 7,479
2016-10-17 7 Ottawa 468,555 9,255 7,079
2016-10-17 8 Ottawa 468,555 9,472 7,097
2016-10-18 9 Ottawa 468,555 9,187 7,605
2016-10-18 10 Ottawa 468,555 9,486 7,267
2016-10-18 11 Ottawa 468,555 9,268 7,481
2016-10-19 12 Ottawa 468,555 9,487 7,575
2016-10-19 13 Ottawa 468,555 9,533 7,616
2016-10-19 14 Ottawa 468,555 9,319 7,742
2016-10-21 15 Ottawa 468,555 9,094 7,000
2016-10-21 16 Ottawa 468,555 9,488 7,634
2016-10-21 17 Ottawa 468,555 8,839 7,927
2016-10-22 18 Ottawa 468,555 9,422 7,426
2016-10-22 19 Ottawa 468,555 9,511 7,369
2016-10-22 20 Ottawa 468,555 9,276 7,555
2016-10-23 21 Ottawa 468,555 9,328 7,564
2016-10-23 22 Ottawa 468,555 9,260 5,370
2016-10-23 23 Ottawa 468,555 9,020 7,011
2016-10-24 24 Ottawa 468,555 9,222 6,993
2016-10-24 25 Ottawa 468,555 9,161 7,528
2016-10-24 26 Ottawa 468,555 9,329 7,320
2016-10-25 27 Ottawa 468,555 9,203 7,484
2016-10-25 28 Ottawa 468,555 8,974 7,142
2016-10-25 29 Ottawa 468,555 9,116 6,924
2016-10-25 30 Ottawa 468,555 9,221 9,222

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 1,343,657.00 361 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 993,515.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 750,119.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 28.72 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 356.30 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 720.46 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 2,871.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 644.46 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 35,616.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 23,836.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 382.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 15.71 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 20.50 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,789.97 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Synthetic Liner Materials 0.46 Tons LANDFILL 100172
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 22.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 128.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 69.76 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 16.95 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Synthetic Liner Materials 7.07 Tons LANDFILL 100663
2018 CHEVRON APPALACHIA LLC Produced Fluid 210.12 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 0.43 Bbl LANDFILL 100172
2018 CHEVRON APPALACHIA LLC Produced Fluid 93.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Drilling Fluid Waste 7.42 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018 CHEVRON APPALACHIA LLC Produced Fluid 1,978.28 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 141.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 35.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 997.13 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 85.71 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2407288 Primary Facility 2015-09-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Nabors drilling on fluid @ 4,632' today (9/5/2015). Tripping out of hole drill pipe possible having circulation issues.
2416035 Primary Facility 2015-09-28 Incident- Response to Accident or Event In Compliance with Policy On 9/28/15, I inspected the Zalac site in response to a spill reported on 9/20/15 by the operator and made the following observations:
2420215 Primary Facility 2015-09-16 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Nabors drilling on fluid @ 16,158' (TD).Setting 51/2" Prod. Casing and cementing tonight (9/15/2015
2449469 Primary Facility 2015-12-23 Compliance Evaluation No Violations Noted On 12/23/15, I performed a compliance evaluation/follow up inspection on the Zalac site in response to a spill reported on 9/20/15 by the operator and made the following observations:
2463546 Primary Facility 2016-03-11 Routine/Complete Inspection No Violations Noted

On 03/11/16 at approximately 0700 hours I conducted a routine complete inspection of the Zalac Unit. The Act 9 sign was in place. All required documents were present at the site.

The site was well vegetated and all BMPs appeared to be in good condition. Seven wells had been drilled and were protected by barriers. These wells were appropriately labeled. No E&S issues were observed at the time of inspection.

2513902 Primary Facility 2016-08-26 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Prepairing site for fracing operation starting in 2-weeks.
2515446 Primary Facility 2016-08-19 Routine/Complete Inspection No Violations Noted On 08/19/16 at approximately 1030 hours I conducted a routine complete inspection of the Zalac well site in response to a site restoration extension request submitted by Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and no signs of erosion were observed. At the time of inspection the GPUs were being installed. The original date for site restoration was to be August 4th, 2016. A two year extension has been granted. The new date for site restoration will be August 4th, 2018.
2556876 Primary Facility 2017-01-26 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Tank farm completed ,operator finishing sales line connection.
2564567 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. A logging operation was in progress off the side of the access road and a log lay down area was adjacent to the access road. BMPs on site were properly maintained and appeared to be in good condition. Disturbed areas were present due to a pipeline operator installing a well connection pipeline. The disturbed areas were appropriately stabilized. The well site was well vegetated and no signs of erosion were observed. There were no violations observed at the time of inspection.
2636907 Primary Facility 2017-08-11 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The purpose of the inspection was to meet with Chevron representatives to discuss redline changes to the site. Chevron requested redline approval to stockpile gravel on the well pad. The request was approved and a photograph documenting the change is attached.
2652122 Primary Facility 2017-09-28 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The purpose of the inspection was to transfer previously approved redlines to a new set of plans. There were no violations observed at the time of inspection.
2652661 Primary Facility 2017-10-19 Routine/Partial Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The purpose of the inspection was to discuss redline vegetation changes to basins 2 and 3. Due to the main areas of the basins holding less water than anticipated, Chevron requested Department approval to change to a seed mixture that would be more suitable for the site conditions. The requested change was approved.
2719596 Primary Facility 2018-04-17 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2771336 Primary Facility 2018-09-06 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and met and exceeded uniform 70% vegetative cover. PCSM features were installed and appeared to be in good condition. The site meets the requirements for permit termination. The NOT is approved.
2843198 Primary Facility 2019-02-22 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References