37-051-24325

Well Details

Well ID: 37-051-24325
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Henry Clay Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 146187
Farm/Lease Name: BURNWORTH UNIT
License Status: INACTIVE
Spud Date: 2010-05-10
Permit Date: 2010-03-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.808139
Longitude: -79.390917

For data sources see[1][2][3]

Well History

Date Event
DEVIATED
2010-03-05 New Permit Application
2010-05-10 Performed Spud Operation
2010-05-28 Drilling Completion
2019-12-17 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2019 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 331.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CHIEF OIL & GAS LLC Drill Cuttings 662.43 Tons LANDFILL 100172
2011 CHIEF OIL & GAS LLC Drill Cuttings 399.44 Tons LANDFILL 100081
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,600.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1889746 Primary Facility 2010-05-27 Routine/Complete Inspection No Violations Noted
1958047 Primary Facility 2011-02-18 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD .UDI # 5 CEMENTING, INTER MEDIATE CASING @ 1834'. RETURNS OF CEMENT TO SURFACE,JOB WENT GOOD.
1958051 Primary Facility 2011-02-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 671' AT PRESENT TIME. E&S LOOKS GOOD.
1958059 Primary Facility 2011-02-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 500' AT PRESENT TIME.EXSPECTING TO TD @ 563'.RECEIVED CALL 2/12/2011 ABOUT 10:00 PM LOST CIRCULATION PRIOR TO TD @ 563' REQURING IF THET TO USE POUR STRING. WHAT OPTIONS ARE THERE BECAUSE NO POUR STRING.RECOMMENDED 1" TUBING TO BE USED. VOID IS @ 170' -190'. TOTAL OF 340 SACKS OF CEMENT USED TO FILL VOID. RETURNS TO SURFACE TEN SACKS OF CEMENT.
1960999 Primary Facility 2011-03-14 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,CLOSE LOOP SYSTEM WORKING GOOD. TD @ 10,525' TODAY RUNNING PROD. CASING TODAY,CEMENTING TONIGHT.
1961191 Primary Facility 2011-03-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. UDI # 5 DRILLING @ 7926'. EXSPECTING TO LAND IN MARCELLUS @ 8367'.
1979334 Primary Facility 2011-06-09 Routine/Complete Inspection Violation(s) Noted
1989856 Primary Facility 2011-07-19 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2006151 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WELL SITE IN PROGRESS OF BEING RECLAIMED.
2046964 Primary Facility 2012-02-15 Compliance Evaluation No Violations Noted On June 9, 2011, WQS Beth Smock inspected the Burnworth site and found that the site was not restored within the required 9 months and issued a NOV to Chief for the same. Also in 2011, Chevron acquired the Burnworth site and the Chief NOV.
2092490 Primary Facility 2012-08-16 Routine/Complete Inspection No Violations Noted Site ID sign in place, area fenced in and gated, good vegetative growth and coverage, no other equipment on site, well was labeled.
2165182 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted Restoration work has been completed. Some areas left unmulched due to landowner request.
2187997 Primary Facility 2013-07-23 Routine/Complete Inspection No Violations Noted Well inactive. Reclaimation done earlier in year has good growth now. No E&S issues.
2265674 Primary Facility 2014-04-23 Site Restoration No Violations Noted On 4/23/2014, the Department performed an inspection of Chevron Appalachia LLC's Burnworth West Unit 1H in Henry Clay Township, Fayette County. The reason for the inspection was that the operator is requesting a Notice of Termination, (NOT), for their ESCGP#1 permit for the site. The well on site, permit # 051-24325, is on inactive status at this time.
2474445 Primary Facility 2016-04-12 Routine/Complete Inspection No Violations Noted ID sign at entrance. 1 well drilled but not equipped for production. No tanks. No pits. E&S ok. Inactive Status approved as per efacts.
2694033 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted Well head surrounded by security fence. The well does not appear equipped for production. The NOT associated with this site was approved on 4-23-14. According to Department records this well is in regulatory inactive status.
2755233 Primary Facility 2018-07-24 Routine/Complete Inspection No Violations Noted Well does not appear to be in production and does not appear to be equipped for production. Basement is wet but shows no hydrocarbon sheen. A significant pressure is noted on one annulus while another gauge shows no pressure. Unable to determine what is open and/or shut in. On site inspection shows no apparent violations. NOVIO
2851850 Primary Facility 2019-03-12 Compliance Evaluation No Violations Noted This well is tagged and presently under regulatory inactive status.

The well head casing looks ok.

The application for inactive status was a one year extension and on the application the operator states that if the economics of building a pipeline to the Burnworth Well Pad do not support the cost of building the pipeline infrastructure then the operator will proceed with Plugging and Abandoning the well by May, 2019.

An additional compliance inspection will be conducted at a later date.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1979334 613113 06/09/2011 2011-06-09 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
613113 271504 NOV - Notice of Violation Comply/Closed 2012-03-02

For data sources see[7]

References