If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-23829 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.723917,"lon":-79.612422,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Wharton Township | |
Operator Name: DIVERSIFIED OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: B JOHNSTON 14 | |
License Status: | |
Spud Date: | |
Permit Date: 2007-11-09 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 39.723917 | |
Longitude: -79.612422 |
Date | Event |
---|---|
2007-11-09 | New Permit Application |
2008-11-03 | Performed Spud Operation |
2008-11-07 | Drilling Completion |
2008-11-13 | Perforation |
2008-11-13 | Performed Stimulation |
2010-12-03 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2008-11-13 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | TEXAS KEYSTONE INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | TEXAS KEYSTONE INC | 2,640.00 | 41 | 0.00 | 0 | 0.00 | 0 |
2009 | TEXAS KEYSTONE INC | 17820.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2010 | TEXAS KEYSTONE INC | 10,194.00 | 303 | 0.00 | 0 | 0.00 | 0 |
2011 | TEXAS KEYSTONE INC | 6,909.00 | 290 | 0.00 | 0 | 0.00 | 0 |
2012 | TEXAS KEYSTONE INC | 4,194.00 | 306 | 0.00 | 0 | 0.00 | 0 |
2013 | TEXAS KEYSTONE INC | 4,058.00 | 287 | 0.00 | 0 | 0.00 | 0 |
2014 | TEXAS KEYSTONE INC | 2,805.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2015 | TEXAS KEYSTONE INC | 2,319.00 | 261 | 0.00 | 0 | 0.00 | 0 |
2016 | DIVERSIFIED OIL & GAS LLC | 2,053.00 | 293 | 0.00 | 0 | 0.00 | 0 |
2017 | DIVERSIFIED OIL & GAS LLC | 2,162.00 | 260 | 0.00 | 0 | 0.00 | 0 |
2018 | DIVERSIFIED OIL & GAS LLC | 1,645.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DIVERSIFIED OIL & GAS LLC | 2,360.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | TEXAS KEYSTONE INC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | TEXAS KEYSTONE INC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | TEXAS KEYSTONE INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | TEXAS KEYSTONE INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | TEXAS KEYSTONE INC | Produced Fluid | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | TEXAS KEYSTONE INC | Produced Fluid | 30 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2711096 | Primary Facility | 2018-03-27 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production.
Department spoke with operator rep Lisa Raffle by phone regarding fluid ponding on site. Ms. Raffle stated a well tender will visit site today and she will follow up with Department on his findings. UPDATE 15:50: Ms. Raffle contacted Department by phone. She stated tank contains 5' 4" of brine and that that level is consistent with her records. In addition, snowmelt, current rainfall, and livestock presence may have contributed to ponding. Department recommends operator continue to monitor and maintain site to avoid any E and S issues. |
For data sources see[8]