X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-049-00050

Well Details

Well ID: 37-049-00050
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: Summit Township
Operator Name:
Well Pad ID:
Farm/Lease Name: EJ Oless
License Status: Plugged and Abandoned
Spud Date: 1991-08-07
Permit Date:
Well Type: STORAGE WELL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 42.050194
Longitude: -80.047611

For data sources see[1][2][3]

Well History

Date Event
1991-08-07 Drilling Completion
2018-07-31 Begin Plugging
2018-08-07 Finished Plugging
2019-04-23 Fully Plugged
2019-10-31 Old Well

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2011 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2012 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2013 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2014 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2015 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2016 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2017 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2018 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 NATL FUEL GAS SUPPLY CORP Drilling Fluid Waste 95.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1082676 Primary Facility 2001-12-11 Routine/Complete Inspection No Violations Noted
1082677 Primary Facility 2001-12-11 Routine/Complete Inspection No Violations Noted
1297901 Primary Facility 2003-12-15 Routine/Complete Inspection No Violations Noted
1839819 Primary Facility 2009-10-22 Routine/Complete Inspection No Violations Noted
1919606 Primary Facility 2010-10-13 Routine/Complete Inspection No Violations Noted
2014087 Primary Facility 2011-10-25 Routine/Complete Inspection No Violations Noted
2107923 Primary Facility 2012-10-10 Routine/Complete Inspection No Violations Noted
2213192 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted
2306370 Primary Facility 2014-09-23 Routine/Complete Inspection No Violations Noted
2421633 Primary Facility 2015-10-28 Routine/Partial Inspection No Violations Noted
2533591 Primary Facility 2016-11-02 Routine/Complete Inspection No Violations Noted
2655790 Primary Facility 2017-11-01 Routine/Partial Inspection No Violations Noted
2759769 Primary Facility 2018-08-03 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, rig was setup on well and circulating, cement crew arrived on location and is beginning to rig up to rig up to pump bottom hole cement plug after plug is set crew will then come back Monday and tag bottom plug then set bridge plug and run CBL and finish plugging top portion of well.
2803226 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted
361102 Primary Facility 1987-11-04 Routine/Complete Inspection No Violations Noted
361103 Primary Facility 1988-11-15 Routine/Complete Inspection No Violations Noted
361104 Primary Facility 1989-11-14 Routine/Complete Inspection No Violations Noted
367511 Primary Facility 1990-12-19 Routine/Complete Inspection No Violations Noted
369954 Primary Facility 1991-09-24 Routine/Complete Inspection No Violations Noted
372755 Primary Facility 1992-10-28 Routine/Complete Inspection No Violations Noted
375433 Primary Facility 1994-01-26 Routine/Complete Inspection No Violations Noted
377182 Primary Facility 1994-12-14 Routine/Complete Inspection No Violations Noted
379958 Primary Facility 1995-12-07 Routine/Complete Inspection No Violations Noted
383703 Primary Facility 1997-10-29 Routine/Complete Inspection No Violations Noted
386261 Primary Facility 1998-10-21 Routine/Complete Inspection No Violations Noted
893709 Primary Facility 1999-11-04 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References