X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-047-24983

Well Details

Well ID: 37-047-24983
Loading map...
Country: United States
State: Pennsylvania
County: Elk
Municipality: Jones Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 153790
Farm/Lease Name: COP WT 2612 167H
License Status: Active
Spud Date: 2017-06-09
Permit Date: 2017-04-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.6076
Longitude: -78.529167

For data sources see[1][2][3]

Well History

Date Event
2017-04-25 New Permit Application
2017-06-09 Performed Spud Operation
2017-07-29 Drilling Completion
2018-03-04 Perforation
2018-03-04 Performed Stage 1 of Stimulation
2018-03-05 Perforation
2018-03-05 Performed Stage 2 of Stimulation
2018-03-05 Performed Stage 6 of Stimulation
2018-03-06 Perforation
2018-03-06 Performed Stage 3 of Stimulation
2018-03-06 Performed Stage 4 of Stimulation
2018-03-07 Perforation
2018-03-07 Performed Stage 5 of Stimulation
2018-03-08 Perforation
2018-03-09 Perforation
2018-03-09 Performed Stage 7 of Stimulation
2018-03-10 Perforation
2018-03-10 Performed Stage 8 of Stimulation
2018-03-10 Performed Stage 9 of Stimulation
2018-03-11 Perforation
2018-03-11 Performed Stage 10 of Stimulation
2018-03-12 Perforation
2018-03-12 Performed Stage 11 of Stimulation
2018-03-13 Perforation
2018-03-13 Performed Stage 12 of Stimulation
2018-03-14 Perforation
2018-03-14 Performed Stage 13 of Stimulation
2018-03-14 Performed Stage 14 of Stimulation
2018-03-15 Perforation
2018-03-15 Performed Stage 15 of Stimulation
2018-03-16 Perforation
2018-03-16 Performed Stage 16 of Stimulation
2018-03-17 Perforation
2018-03-17 Performed Stage 17 of Stimulation
2018-03-18 Perforation
2018-03-18 Performed Stage 18 of Stimulation
2018-03-18 Performed Stage 19 of Stimulation
2018-03-18 Performed Stage 27 of Stimulation
2018-03-19 Perforation
2018-03-19 Performed Stage 20 of Stimulation
2018-03-20 Perforation
2018-03-20 Performed Stage 21 of Stimulation
2018-03-21 Perforation
2018-03-21 Performed Stage 22 of Stimulation
2018-03-22 Perforation
2018-03-22 Performed Stage 23 of Stimulation
2018-03-22 Performed Stage 24 of Stimulation
2018-03-23 Perforation
2018-03-23 Performed Stage 25 of Stimulation
2018-03-24 Performed Stage 26 of Stimulation
2018-03-25 Perforation
2018-03-26 Perforation
2018-03-26 Performed Stage 28 of Stimulation
2018-03-26 Performed Stage 29 of Stimulation
2018-03-27 Perforation
2018-03-27 Performed Stage 30 of Stimulation
2018-03-28 Perforation
2018-03-28 Performed Stage 31 of Stimulation
2019-07-01 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-04 2018-03-27 6,155 7,572,560 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.000426788 309.469
Acetic acid 64-19-7 60 0.000640182 464.204
KSI-19 Keane Scale Inhibitor Aqueous Solution Proprietary 100 0.0089059 6457.78
7.5% Acid Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.03696 26800.1
Water 7732-18-5 92.5 0.45584 330535
DustProof (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 99.9 12.3962 8,988,620.0
Blend Proprietary 0.1 0.0124086 8997.62
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-0l 107-19-7 5 0.00006322 45.838
fatty imidazoline 61790-69-0 5 0.00006322 45.838
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000723464 524.592
Didecyl dimethyl ammonium chloride 7173-51-5 8 0 0
propan-2-ol 67-63-0 5 0.00006322 45.838
cololymer of 2-propenamide 69418-26-4 30 0.0256987 18634.5
ethanol 64-17-5 2.8 0.000254165 184.298
Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.0171325 12423
gluteral 111-30-8 26.7 0.00242365 1757.42
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482007 349.509
oleic acid diethanolamide 93-83-4 2 0.00171325 1242.3
Water 7732-18-5 92.5 0.45584 330535
Blend Proprietary 0.1 0.0124086 8997.62
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00171325 1242.3
Ammonium Chloride 12125-02-9 1 0.000856624 621.148
ethanol 64-17-5 2.8 0 0
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0 0
xylne 1330-20-7 5 0.00006322 45.838
gluteral 111-30-8 26.7 0 0
Citric acid 77-92-9 40 0.000426788 309.469
ethylbenzene 100-41-4 1 0.00001264 9.168
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.00006322 45.838
KFR-20 Keane Friction Reducer Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.0171325 12423
Ammonium Chloride 12125-02-9 1 0.000856624 621.148
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00171325 1242.3
Water 7732-18-5 45 0.0385481 27951.7
oleic acid diethanolamide 93-83-4 2 0.00171325 1242.3
cololymer of 2-propenamide 69418-26-4 30 0.0256987 18634.5
MBC-516W Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482007 349.509
gluteral 111-30-8 26.7 0.00242365 1757.42
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000723464 524.592
Other components below reportable levels Proprietary 56.7 0.00514866 3733.36
ethanol 64-17-5 2.8 0.000254165 184.298
KAI-12 Keane Acid Inhibitor methanol 67-56-1 90 0.00113788 825.089
ethylbenzene 100-41-4 1 0.00001264 9.168
propan-2-ol 67-63-0 5 0.00006322 45.838
prop-2-yn-1-0l 107-19-7 5 0.00006322 45.838
fatty imidazoline 61790-69-0 5 0.00006322 45.838
xylne 1330-20-7 5 0.00006322 45.838
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.00006322 45.838
Water (Clean - Acid - Chems) Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 86.9926 63,079,400.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-03-04 1 Ottawa 7,740,348 7,925 4,905
2018-03-05 2 Ottawa 7,740,348 8,090 4,718
2018-03-06 3 Ottawa 7,740,348 7,856 5,140
2018-03-06 4 Ottawa 7,740,348 7,987 4,643
2018-03-07 5 Ottawa 7,740,348 7,938 4,586
2018-03-05 6 Ottawa 7,740,348 8,274 4,758
2018-03-09 7 Ottawa 7,740,348 8,389 4,383
2018-03-10 8 Ottawa 7,740,348 8,316 5,254
2018-03-10 9 Ottawa 7,740,348 8,378 5,656
2018-03-11 10 Ottawa 7,740,348 8,301 5,671
2018-03-12 11 Ottawa 7,740,348 8,254 5,086
2018-03-13 12 Ottawa 7,740,348 8,392 8,734
2018-03-14 13 Ottawa 7,740,348 8,204 8,373
2018-03-14 14 Ottawa 7,740,348 8,053 5,502
2018-03-15 15 Ottawa 7,740,348 7,964 5,145
2018-03-16 16 Ottawa 7,740,348 7,942 5,529
2018-03-17 17 Ottawa 7,740,348 8,124 5,074
2018-03-18 18 Ottawa 7,740,348 7,879 5,408
2018-03-18 19 Ottawa 7,740,348 7,731 5,273
2018-03-19 20 Ottawa 7,740,348 7,660 5,674
2018-03-20 21 Ottawa 7,740,348 7,632 5,255
2018-03-21 22 Ottawa 7,740,348 7,428 4,749
2018-03-22 23 Ottawa 7,740,348 7,459 4,480
2018-03-22 24 Ottawa 7,740,348 7,867 5,300
2018-03-23 25 Ottawa 7,740,348 7,613 5,281
2018-03-24 26 Ottawa 7,740,348 8,023 5,495
2018-03-18 27 Ottawa 7,740,348 7,980 5,148
2018-03-26 28 Ottawa 7,740,348 7,522 4,912
2018-03-26 29 Ottawa 7,740,348 7,070 5,170
2018-03-27 30 Ottawa 7,740,348 7,220 5,224
2018-03-28 31 Ottawa 7,740,348 8,409 7,236

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 627,251.85 210 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 582,612.73 361 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 1,062.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 3.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Drill Cuttings 13.65 Tons ON SITE PIT
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Drill Cuttings 886.88 Tons LANDFILL 100361
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 10.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 126.36 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Unused Fracturing Fluid Waste 136.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 269.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 48.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 43,214.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 2.32 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 21,225.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 56.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2594665 Primary Facility 2017-05-17 Administrative/File Review No Violations Noted
2606986 Primary Facility 2017-06-15 Drilling/Alteration No Violations Noted
2617647 Primary Facility 2017-07-20 Drilling/Alteration No Violations Noted
2676134 Primary Facility 2017-12-28 Routine/Complete Inspection No Violations Noted On 12/28/17 at 1152 hrs., I conducted a routine inspection of Seneca Resources' COP WT 2612 167H 51521 (API 047-24983) in Jones Twp., Elk Co. The well has been drilled, but is not yet frac'd. There are no violations noted for this inspection.
2832895 Primary Facility 2019-01-29 Routine/Complete Inspection No Violations Noted This is a shale well pad with 11 wells drilled. The wells appear to be in production. The area around the wellheads is clean. There are 12 laydown tanks on site within temporary containment, with no evidence of spills or leaks. There is a tank battery with six 400 barrel tanks within containment. The site is snow covered and seems to be stable. Signage and the mailbox are in place at the entrance to the site.

For data sources see[9]

References