X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-047-24953

Well Details

Well ID: 37-047-24953
Loading map...
Country: United States
State: Pennsylvania
County: Elk
Municipality: Jones Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 152363
Farm/Lease Name: COP WT 2591 69H 51542
License Status: Active
Spud Date: 2015-10-18
Permit Date: 2015-07-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.564894
Longitude: -78.505783

For data sources see[1][2][3]

Well History

Date Event
2015-07-01 New Permit Application
2015-09-24 New Permit Application
2015-10-18 Performed Spud Operation
2015-12-27 Drilling Completion
2016-02-21 Perforation
2016-04-19 Perforation
2016-04-19 Performed Stage 1 of Stimulation
2016-04-19 Performed Stage 2 of Stimulation
2016-04-20 Perforation
2016-04-20 Performed Stage 3 of Stimulation
2016-04-20 Performed Stage 4 of Stimulation
2016-04-20 Performed Stage 5 of Stimulation
2016-04-20 Performed Stage 6 of Stimulation
2016-04-21 Perforation
2016-04-21 Performed Stage 7 of Stimulation
2016-04-21 Performed Stage 8 of Stimulation
2016-04-21 Performed Stage 9 of Stimulation
2016-04-22 Perforation
2016-04-22 Performed Stage 10 of Stimulation
2016-04-22 Performed Stage 11 of Stimulation
2016-04-22 Performed Stage 12 of Stimulation
2016-04-22 Performed Stage 13 of Stimulation
2016-04-23 Perforation
2016-04-25 Perforation
2016-04-25 Performed Stage 14 of Stimulation
2016-04-25 Performed Stage 15 of Stimulation
2016-04-25 Performed Stage 16 of Stimulation
2016-04-26 Perforation
2016-04-26 Performed Stage 17 of Stimulation
2016-04-26 Performed Stage 18 of Stimulation
2016-04-26 Performed Stage 19 of Stimulation
2016-04-27 Perforation
2016-04-27 Performed Stage 20 of Stimulation
2016-04-27 Performed Stage 21 of Stimulation
2016-04-27 Performed Stage 22 of Stimulation
2016-04-27 Performed Stage 23 of Stimulation
2016-04-28 Perforation
2016-04-28 Performed Stage 24 of Stimulation
2016-04-28 Performed Stage 25 of Stimulation
2016-04-28 Performed Stage 26 of Stimulation
2016-04-28 Performed Stage 27 of Stimulation
2016-04-29 Perforation
2016-04-29 Performed Stage 28 of Stimulation
2016-04-29 Performed Stage 29 of Stimulation
2016-04-29 Performed Stage 30 of Stimulation
2016-05-02 Perforation
2016-05-02 Performed Stage 31 of Stimulation
2016-05-02 Performed Stage 32 of Stimulation
2016-05-02 Performed Stage 33 of Stimulation
2016-05-03 Perforation
2016-05-03 Performed Stage 34 of Stimulation
2016-05-03 Performed Stage 35 of Stimulation
2016-05-03 Performed Stage 36 of Stimulation
2016-05-03 Performed Stage 37 of Stimulation
2016-05-04 Perforation
2016-05-04 Performed Stage 38 of Stimulation
2016-05-04 Performed Stage 39 of Stimulation
2016-05-04 Performed Stage 40 of Stimulation
2016-05-04 Performed Stage 41 of Stimulation
2016-05-05 Perforation
2016-05-05 Performed Stage 42 of Stimulation
2016-05-05 Performed Stage 43 of Stimulation
2016-05-05 Performed Stage 44 of Stimulation
2016-05-06 Perforation
2016-05-06 Performed Stage 45 of Stimulation
2016-05-06 Performed Stage 46 of Stimulation
2016-05-06 Performed Stage 47 of Stimulation
2016-08-10 Deviated
2016-08-10 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-19 2016-05-06 6,263 11,120,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KSI-16 Keane Energy Scale Inhibitor Ammonia 7664-41-7 0.1 0.00001421 0
Ethylene Glycol 107-21-1 35 0.0093315 0
MBC 516 Keane Energy Biocide Glutaraldehyde 111-30-8 27 0.002404 0
Ethanol 64-17-5 2.8 0.0002493 0
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00073901 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.0004897 0
7.5% HydroChloric Acid Keane Energy Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0372203 0
Proppant 80/100 Oklahoma Keane Energy Proppant Silica 14808-60-7 100 0.839983 0
Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.9071 0
Proppant 30/50 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.54603 0
KFR-20 Keane Energy Friction Reducer C12-16 68551-12-2 2 0.00149837 0
Distallates hydrotreated light 64742-47-8 20 0.0149837 0
Oleic acid diethanolamide 93-83-4 2 0.00149837 0
Ammonium chloride 12125-02-9 1 0.00074918 0
Polyacrylamide 69418-26-4 30 0.0224755 0
KFEAC 20 Keane Energy Iron Control Citric acid 77-92-9 30 0.00022657 0
Acetic acid 64-19-7 50 0.00037762 0
KAI-11 Keane Energy Corrosion Inhibitor Propargyl alcohol derivative proprietary 60 0.00064004 0
Propargyl alcohol 107-19-7 1 0.00001067 0
Potassium iodide 7681-11-0 5 0.00005334 0
Proppant 40/70 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.61392 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-04-19 1 OTTAWA 212,668 7,405 5,142
2016-04-19 2 OTTAWA 212,668 7,951 5,050
2016-04-20 3 OTTAWA 212,668 8,021 5,324
2016-04-20 4 OTTAWA 212,668 7,316 4,433
2016-04-20 5 OTTAWA 212,668 7,526 4,653
2016-04-20 6 OTTAWA 212,668 7,895 4,679
2016-04-21 7 OTTAWA 212,668 7,690 4,605
2016-04-21 8 OTTAWA 212,668 7,426 4,714
2016-04-21 9 OTTAWA 212,668 7,678 5,047
2016-04-22 10 OTTAWA 212,668 7,808 5,107
2016-04-22 11 OTTAWA 212,668 7,696 4,580
2016-04-22 12 OTTAWA 212,668 7,528 4,764
2016-04-22 13 OTTAWA 212,668 7,906 4,633
2016-04-25 14 OTTAWA 212,668 7,501 5,242
2016-04-25 15 OTTAWA 212,668 7,649 5,544
2016-04-25 16 OTTAWA 212,668 7,621 4,667
2016-04-26 17 OTTAWA 212,668 7,436 5,936
2016-04-26 18 OTTAWA 212,668 765 5,285
2016-04-26 19 OTTAWA 212,668 7,579 4,857
2016-04-27 20 OTTAWA 212,668 7,623 5,129
2016-04-27 21 OTTAWA 212,668 7,678 5,071
2016-04-27 22 OTTAWA 212,668 7,676 5,484
2016-04-27 23 OTTAWA 212,668 7,726 5,644
2016-04-28 24 OTTAWA 212,668 7,666 5,629
2016-04-28 25 OTTAWA 212,668 7,645 5,784
2016-04-28 26 OTTAWA 212,668 7,518 5,994
2016-04-28 27 OTTAWA 212,668 7,387 5,227
2016-04-29 28 OTTAWA 212,668 7,161 5,574
2016-04-29 29 OTTAWA 212,668 7,514 5,067
2016-04-29 30 OTTAWA 212,668 7,263 5,970
2016-05-02 31 OTTAWA 212,668 7,846 4,762
2016-05-02 32 OTTAWA 212,668 7,753 5,679
2016-05-02 33 OTTAWA 212,668 7,543 5,471
2016-05-03 34 OTTAWA 212,668 7,644 6,615
2016-05-03 35 OTTAWA 212,668 7,125 6,006
2016-05-03 36 OTTAWA 212,668 7,453 5,932
2016-05-03 37 OTTAWA 212,668 7,122 5,906
2016-05-04 38 OTTAWA 212,668 7,163 5,540
2016-05-04 39 OTTAWA 212,668 7,420 5,927
2016-05-04 40 OTTAWA 212,668 7,218 5,686
2016-05-04 41 OTTAWA 212,668 7,178 5,403
2016-05-05 42 OTTAWA 212,668 6,971 5,698
2016-05-05 43 OTTAWA 212,668 6,801 5,619
2016-05-05 44 OTTAWA 212,668 6,852 5,855
2016-05-06 45 OTTAWA 212,668 7,069 5,912
2016-05-06 46 OTTAWA 212,668 7,266 5,854
2016-05-06 47 OTTAWA 212,668 7,465 5,613

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 980,063.53 195 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 1,041,208.67 363 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 706,073.85 332 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 136,254.13 103 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,568.94 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 4.79 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Servicing Fluid 3.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 5,036.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Servicing Fluid 116.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Fracturing Fluid Waste 385.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Produced Fluid 52,611.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil 0.22 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil & Gas Related Spills 0.22 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 76.96 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 16,649.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SENECA RESOURCES CO LLC Produced Fluid 34,466.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 86.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 18,881.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 15.71 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 34.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 628.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 2.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.46 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Produced Fluid 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 48.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 12,771.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 9.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2394869 Primary Facility 2015-08-04 Administrative/File Review No Violations Noted
2417313 Primary Facility 2015-10-19 Drilling/Alteration No Violations Noted
2435583 Primary Facility 2015-12-17 Drilling/Alteration No Violations Noted
2435600 Primary Facility 2015-12-22 Drilling/Alteration No Violations Noted
2446438 Primary Facility 2016-02-04 Administrative/File Review No Violations Noted
2497691 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2497698 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2561564 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/17 at 1222 hrs. I conducted a routine inspection of Seneca Resources' E09-M well #51542 (API 047-24953) in Jones Twp., Elk Co. Eleven out of thirteen permitted wells have been drilled and are equipped for production. Well tags are present at each wellhead. There are no violations noted for this inspection.
2840637 Primary Facility 2019-02-15 Routine/Complete Inspection No Violations Noted This is an unconventional well pad with 13 wells drilled. Three have recently been completed and are currently in flowback. The well pad is mostly flat although rig mats have recently been removed and will require some grading when the weather breaks. There are numerous laydown tanks on site for fluid storage, and the tanks are set within temporary containment. There are also six 400 barrel tanks within lined containment for produced water. The pad was snow covered at this time, but may thaw with additional rain fall and snow melt. The site sign with well information and mailbox are at the entrance to the site.

For data sources see[9]

References