X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-047-24952

Well Details

Well ID: 37-047-24952
Loading map...
Country: United States
State: Pennsylvania
County: Elk
Municipality: Jones Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 152363
Farm/Lease Name: COP WT 2591 68H 51541
License Status: Active
Spud Date: 2015-10-18
Permit Date: 2015-07-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.564853
Longitude: -78.505781

For data sources see[1][2][3]

Well History

Date Event
2015-07-01 New Permit Application
2015-09-24 New Permit Application
2015-10-18 Performed Spud Operation
2015-12-16 Drilling Completion
2016-02-23 Perforation
2016-04-06 Perforation
2016-04-06 Performed Stage 1 of Stimulation
2016-04-06 Performed Stage 2 of Stimulation
2016-04-06 Performed Stage 3 of Stimulation
2016-04-07 Perforation
2016-04-07 Performed Stage 4 of Stimulation
2016-04-07 Performed Stage 5 of Stimulation
2016-04-07 Performed Stage 6 of Stimulation
2016-04-07 Performed Stage 7 of Stimulation
2016-04-07 Performed Stage 8 of Stimulation
2016-04-08 Perforation
2016-04-08 Performed Stage 10 of Stimulation
2016-04-08 Performed Stage 11 of Stimulation
2016-04-08 Performed Stage 12 of Stimulation
2016-04-08 Performed Stage 13 of Stimulation
2016-04-08 Performed Stage 14 of Stimulation
2016-04-08 Performed Stage 9 of Stimulation
2016-04-09 Perforation
2016-04-09 Performed Stage 15 of Stimulation
2016-04-11 Perforation
2016-04-11 Performed Stage 16 of Stimulation
2016-04-11 Performed Stage 17 of Stimulation
2016-04-11 Performed Stage 18 of Stimulation
2016-04-11 Performed Stage 19 of Stimulation
2016-04-11 Performed Stage 20 of Stimulation
2016-04-12 Perforation
2016-04-12 Performed Stage 21 of Stimulation
2016-04-12 Performed Stage 22 of Stimulation
2016-04-12 Performed Stage 23 of Stimulation
2016-04-12 Performed Stage 24 of Stimulation
2016-04-12 Performed Stage 25 of Stimulation
2016-04-12 Performed Stage 26 of Stimulation
2016-04-13 Perforation
2016-04-13 Performed Stage 27 of Stimulation
2016-04-13 Performed Stage 28 of Stimulation
2016-04-13 Performed Stage 29 of Stimulation
2016-04-13 Performed Stage 30 of Stimulation
2016-04-13 Performed Stage 31 of Stimulation
2016-04-14 Perforation
2016-04-14 Performed Stage 32 of Stimulation
2016-04-14 Performed Stage 33 of Stimulation
2016-04-14 Performed Stage 34 of Stimulation
2016-04-14 Performed Stage 35 of Stimulation
2016-04-14 Performed Stage 36 of Stimulation
2016-04-14 Performed Stage 37 of Stimulation
2016-04-15 Perforation
2016-04-15 Performed Stage 38 of Stimulation
2016-04-15 Performed Stage 39 of Stimulation
2016-04-15 Performed Stage 40 of Stimulation
2016-04-15 Performed Stage 41 of Stimulation
2016-04-15 Performed Stage 42 of Stimulation
2016-04-15 Performed Stage 43 of Stimulation
2016-04-16 Perforation
2016-04-16 Performed Stage 44 of Stimulation
2016-04-16 Performed Stage 45 of Stimulation
2016-04-18 Perforation
2016-04-18 Performed Stage 46 of Stimulation
2016-04-18 Performed Stage 47 of Stimulation
2016-04-18 Performed Stage 48 of Stimulation
2016-04-18 Performed Stage 49 of Stimulation
2016-04-18 Performed Stage 50 of Stimulation
2016-04-18 Performed Stage 51 of Stimulation
2016-08-10 Deviated
2016-08-10 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-06 2016-04-18 6,262 12,016,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFR-20 Keane Energy Friction Reducer Oleic acid diethanolamide 93-83-4 2 0.00148996 0
C12-16 68551-12-2 2 0.00148996 0
Polyacrylamide 69418-26-4 30 0.0223494 0
Ammonium chloride 12125-02-9 1 0.00074498 0
Distallates hydrotreated light 64742-47-8 20 0.0148996 0
Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.9423 0
Proppant 80/100 Oklahoma Keane Energy Proppant Silica 14808-60-7 100 0.839907 0
Proppant 30/50 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.52654 0
KSI-16 Keane Energy Scale Inhibitor Ethylene Glycol 107-21-1 35 0.00911377 0
Ammonia 7664-41-7 0.1 0.00001388 0
MBC 516 Keane Energy Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00073657 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00048809 0
Glutaraldehyde 111-30-8 27 0.00239606 0
Ethanol 64-17-5 2.8 0.00024848 0
KAI-11 Keane Energy Corrosion Inhibitor Propargyl alcohol 107-19-7 1 0.00001071 0
Propargyl alcohol derivative proprietary 60 0.00064233 0
Potassium iodide 7681-11-0 5 0.00005353 0
7.5% HydroChloric Acid Keane Energy Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0373535 0
KFEAC 20 Keane Energy Iron Control Acetic acid 64-19-7 50 0.00037897 0
Citric acid 77-92-9 30 0.00022738 0
Proppant 40/70 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.59866 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-04-06 1 OTTAWA 1,356,426 7,136 6,081
2016-04-06 2 OTTAWA 1,356,426 7,721 4,878
2016-04-06 3 OTTAWA 1,356,426 7,186 4,676
2016-04-07 4 OTTAWA 1,356,426 7,281 4,906
2016-04-07 5 OTTAWA 1,356,426 7,403 4,475
2016-04-07 6 OTTAWA 1,356,426 7,619 4,908
2016-04-07 7 OTTAWA 1,356,426 7,604 4,644
2016-04-07 8 OTTAWA 1,356,426 7,440 4,680
2016-04-08 9 OTTAWA 1,356,426 7,511 4,711
2016-04-08 10 OTTAWA 1,356,426 7,543 4,726
2016-04-08 11 OTTAWA 1,356,426 7,647 4,803
2016-04-08 12 OTTAWA 1,356,426 7,648 4,908
2016-04-08 13 OTTAWA 1,356,426 7,573 4,772
2016-04-08 14 OTTAWA 1,356,426 7,686 4,643
2016-04-09 15 OTTAWA 1,356,426 7,309 5,014
2016-04-11 16 OTTAWA 1,356,426 7,635 4,657
2016-04-11 17 OTTAWA 1,356,426 7,732 5,282
2016-04-11 18 OTTAWA 1,356,426 7,802 4,732
2016-04-11 19 OTTAWA 1,356,426 7,845 5,099
2016-04-11 20 OTTAWA 1,356,426 7,964 4,915
2016-04-12 21 OTTAWA 1,356,426 7,719 4,883
2016-04-12 22 OTTAWA 1,356,426 7,635 5,151
2016-04-12 23 OTTAWA 1,356,426 7,398 4,655
2016-04-12 24 OTTAWA 1,356,426 7,449 4,907
2016-04-12 25 OTTAWA 1,356,426 7,430 4,859
2016-04-12 26 OTTAWA 1,356,426 7,789 4,989
2016-04-13 27 OTTAWA 1,356,426 7,457 4,739
2016-04-13 28 OTTAWA 1,356,426 7,582 5,068
2016-04-13 29 OTTAWA 1,356,426 7,426 4,988
2016-04-13 30 OTTAWA 1,356,426 7,712 5,156
2016-04-13 31 OTTAWA 1,356,426 7,316 5,143
2016-04-14 32 OTTAWA 1,356,426 7,468 4,765
2016-04-14 33 OTTAWA 1,356,426 7,450 4,804
2016-04-14 34 OTTAWA 1,356,426 7,297 4,973
2016-04-14 35 OTTAWA 1,356,426 7,504 4,972
2016-04-14 36 OTTAWA 1,356,426 7,969 5,840
2016-04-14 37 OTTAWA 1,356,426 7,890 5,370
2016-04-15 38 OTTAWA 1,356,426 7,359 5,131
2016-04-15 39 OTTAWA 1,356,426 6,982 4,946
2016-04-15 40 OTTAWA 1,356,426 7,107 4,930
2016-04-15 41 OTTAWA 1,356,426 7,046 5,059
2016-04-15 42 OTTAWA 1,356,426 7,787 5,406
2016-04-15 43 OTTAWA 1,356,426 7,490 4,733
2016-04-16 44 OTTAWA 1,356,426 7,072 4,842
2016-04-16 45 OTTAWA 1,356,426 6,917 5,243
2016-04-18 46 OTTAWA 1,356,426 7,397 5,688
2016-04-18 47 OTTAWA 1,356,426 7,603 5,211
2016-04-18 48 OTTAWA 1,356,426 7,545 5,029
2016-04-18 49 OTTAWA 1,356,426 7,185 4,933
2016-04-18 50 OTTAWA 1,356,426 7,358 5,322
2016-04-18 51 OTTAWA 1,356,426 7,161 5,777

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 902,107.16 196 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 902,211.59 363 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 650,482.09 358 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 321,804.53 237 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,166.13 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 4.72 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Servicing Fluid 3.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 5,480.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Servicing Fluid 116.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Fracturing Fluid Waste 289.15 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Drill Cuttings 114.73 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Produced Fluid 52,686.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil 0.23 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil & Gas Related Spills 0.23 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 76.96 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 16,868.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SENECA RESOURCES CO LLC Produced Fluid 33,878.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 86.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 22,023.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 15.71 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 34.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 628.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 2.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.46 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Produced Fluid 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 48.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 30,409.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 9.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 2.31 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2394868 Primary Facility 2015-08-04 Administrative/File Review No Violations Noted
2417312 Primary Facility 2015-10-19 Drilling/Alteration No Violations Noted
2419874 Primary Facility 2015-10-28 Drilling/Alteration No Violations Noted
2432469 Primary Facility 2015-12-11 Drilling/Alteration No Violations Noted
2435587 Primary Facility 2015-12-17 Drilling/Alteration No Violations Noted
2444150 Primary Facility 2016-01-28 Administrative/File Review No Violations Noted
2497689 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2497702 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2561562 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/17 at 1222 hrs. I conducted a routine inspection of Seneca Resources' E09-M well #51541 (API 047-24952) in Jones Twp., Elk Co. Eleven out of thirteen permitted wells have been drilled and are equipped for production. Well tags are present at each wellhead. There are no violations noted for this inspection.
2840635 Primary Facility 2019-02-15 Routine/Complete Inspection No Violations Noted This is an unconventional well pad with 13 wells drilled. Three have recently been completed and are currently in flowback. The well pad is mostly flat although rig mats have recently been removed and will require some grading when the weather breaks. There are numerous laydown tanks on site for fluid storage, and the tanks are set within temporary containment. There are also six 400 barrel tanks within lined containment for produced water. The pad was snow covered at this time, but may thaw with additional rain fall and snow melt. The site sign with well information and mailbox are at the entrance to the site.

For data sources see[9]

References