X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21246

Well Details

Well ID: 37-035-21246
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Chapman Township
Operator Name: ARD OPR LLC
Well Pad ID: 148059
Farm/Lease Name: COP TRACT 285 H 1048H
License Status:
Spud Date: 2011-05-29
Permit Date: 2011-04-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.409206
Longitude: -77.564997

For data sources see[1][2][3]

Well History

Date Event
2011-04-15 New Permit Application
2011-05-28 Performed Spud Operation
2011-09-19 Drilling Completion
2011-10-08 Perforation
2012-04-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-10-16 2011-10-16 8,049 5,614,491

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 84.26
LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 0.00
BE-9 Biocide Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00199000
Acid, Hydrochloric (15) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 15.00 0.00
Sand (Proppant) Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 15.07
WMTI Poly CS39 Halliburton Energy Services Clay Stabilizer Proprietary inorganic chemical 20.00 0.02
Proprietary poly electrolyte 40.00 0.05
Water 7732-18-5 60.00 0.08
Chloride 16887-00-6 30.00 0.04
LGC-36 UC Halliburton Energy Services Liquid Gel Concentrate Guar gum 9000-30-0 60.00 0.00
Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00003000
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 0.03
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 0.00021000
Propargyl alcohol 107-19-7 10.00 0.00003000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00003000
Hemicellulase enzyme 9012-54-8 15.00 0.00001000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00154000
WMTI Poly SI40 AMPA Halliburton Energy Services Scale Inhibitor
WMTI Poly SI40 AMPA Scale Inhibitor Hydrochloric acid 7647-01-0 17.00 0.00
Phosphonic acid 13598-36-2 3.00 0.00
Water 7732-18-5 70.00 0.00
Poly Phosphonate 40.00 0.00
WMTI Poly CFR40G 1020 Halliburton Energy Services Friction Reducer Cationic water-soluble polymer emulsion 100.00 0.00
WG-36 GELLING AGENT Halliburton Energy Services Gelling Agent Guar gum 9000-30-0 100.00 0.00216000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ANADARKO E&P ONSHORE LLC 122,722.00 34 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 594,268.00 362 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 287,391.00 354 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 338,770.00 351 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 188,495.00 170 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 307,432.00 323 0.00 0 0.00 0
2017 ARD OPR LLC 228,422.69 365 0.00 0 0.00 0
2018 ARD OPR LLC 191,009.67 365 0.00 0 0.00 0
2019 ARD OPR LLC 168,432.04 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 800.94 Tons LANDFILL 06-08438
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 440.15 Tons LANDFILL 100955
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 994.59 Tons LANDFILL 101397
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 4,394.01 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 4,470.30 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 5,278.37 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 414.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 1,661.02 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 262.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 107.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 815.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 1,198.32 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 156.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 1,080.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 1,642.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 263.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 1,206.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 186.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ARD OPR LLC Produced Fluid 258.68 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 1,666.63 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 380.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 65.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 ARD OPR LLC Other Oil & Gas Wastes 6.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Other Oil & Gas Wastes 1.85 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 97.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 1,694.46 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1976153 Primary Facility 2011-05-26 Routine/Complete Inspection No Violations Noted
1976158 Primary Facility 2011-05-26 Routine/Complete Inspection No Violations Noted
1988546 Primary Facility 2011-07-18 Drilling/Alteration No Violations Noted
1994091 Primary Facility 2011-08-05 Drilling/Alteration No Violations Noted
2011483 Primary Facility 2011-10-16 Routine/Complete Inspection No Violations Noted
2031136 Primary Facility 2012-01-03 Routine/Complete Inspection No Violations Noted
2074092 Primary Facility 2012-05-02 Routine/Complete Inspection No Violations Noted
2333535 Primary Facility 2015-01-05 Routine/Complete Inspection No Violations Noted
2700014 Primary Facility 2018-02-28 Routine/Complete Inspection No Violations Noted The weather is 53 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285 H Pad, Well #1048H, on February 28,

2018. There are 3 producing wells on this pad. Production by intermediate (5-1/2 X 9-5/8) annulus vent is shut in to pressure monitor, with pressure reading negative 1 PSI, production casing pressure gauge reads 265 PSI. The production xmas tree top pressure on the 2-3/8 tubing is 217 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. Dehydration unit and produced water tank that are located on site, have been disconnected and not in use. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. Alta Resources, LLC. Representative ¿ Rod Williamson, Production Operator.

2828998 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. COP Tract 285 Pad H. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

There are a total of 3 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 3 line heaters and 4 steel vertical production fluids tanks onsite. A sand separator is associated with each well. Both line heaters and production fluid tanks were stationed in secondary containment.

No violations noted.

For data sources see[8]

References