If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.288776,"lon":-77.769086,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Noyes Township | |
Operator Name: CAPITAL OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: C O P TRACT 678 107 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-06-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.288776 | |
Longitude: -77.769086 |
Date | Event |
---|---|
2007-06-27 | New Permit Application |
2007-09-24 | Performed Spud Operation |
2007-09-28 | Drilling Completion |
2007-10-09 | Perforation |
2007-12-06 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | NCL NATURAL RESOURCES LLC | 17181.00 | 65 | 0.00 | 0 | 0.00 | 0 |
2008 | NCL NATURAL RESOURCES LLC | 53051.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | NCL NATURAL RESOURCES LLC | 35655.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | NCL NATURAL RESOURCES LLC | 29,434.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | NCL NATURAL RESOURCES LLC | 23,760.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | NCL NATURAL RESOURCES LLC | 21,762.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | NCL NATURAL RESOURCES LLC | 18,763.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | NCL NATURAL RESOURCES LLC | 17,439.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | NCL NATURAL RESOURCES LLC | 16,610.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | NCL NATURAL RESOURCES LLC | 18,819.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CAPITAL OIL & GAS INC | 10,244.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | CAPITAL OIL & GAS INC | 12,339.00 | 325 | 0.00 | 0 | 0.00 | 0 |
2019 | CAPITAL OIL & GAS INC | 12,715.00 | 339 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | NCL NATURAL RESOURCES LLC | Brine | 55.00 Bbl | Municipal Sewage Treatment Plant | PA0020486 |
2009 | NCL NATURAL RESOURCES LLC | Brine | 33.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2010 | NCL NATURAL RESOURCES LLC | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2010 | NCL NATURAL RESOURCES LLC | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2013 | NCL NATURAL RESOURCES LLC | Produced Fluid | 25 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2013 | NCL NATURAL RESOURCES LLC | Produced Fluid | 25.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1656325 | Primary Facility | 2007-09-24 | Drilling/Alteration | No Violations Noted | |
1983321 | Primary Facility | 2011-06-15 | Complaint Inspection | Violation(s) Noted | Hydrocarbon spills on site, no E&S Plan or Inspection Log on site, no E&S controls, site not stabilized |
1983322 | Primary Facility | 2011-06-20 | Follow-up Inspection | Violation(s) Noted | Hydrocarbon spill significant - never reported, well site past due for restoration, outstanding violations from 06/15/11 inspection still exhibited |
1993292 | Primary Facility | 2011-07-27 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | NCL starting to address violations, no violations capable of being closed out yet |
2100304 | Primary Facility | 2012-08-15 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1983321 | 614249 | 06/15/2011 | 2011-06-15 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1983321 | 614250 | 06/15/2011 | 2011-06-15 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | |
1983321 | 614251 | 06/15/2011 | 2011-06-15 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | |
1983321 | 614252 | 06/15/2011 | 2011-06-15 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
1983321 | 614253 | 06/15/2011 | 2011-06-15 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1983322 | 614254 | 06/20/2011 | 2011-06-20 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614255 | 06/20/2011 | 2011-06-20 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614256 | 06/20/2011 | 2011-06-20 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614257 | 06/20/2011 | 2011-06-20 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614258 | 06/20/2011 | 2011-06-20 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614259 | 06/20/2011 | 2011-06-20 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
1983322 | 614260 | 06/20/2011 | 2011-06-20 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | All viols indic as corrected 8/15/12. NOV closed 2/18/15 |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
614254 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614255 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614256 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614257 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614258 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614259 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 | |||
614260 | 272399 | NOV - Notice of Violation | Comply/Closed | 2015-02-18 |
For data sources see[7]