X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-033-26484

Well Details

Well ID: 37-033-26484
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Brady Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: BONANTE
License Status:
Spud Date:
Permit Date: 2007-06-29
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.994220
Longitude: -78.788751

For data sources see[1][2][3]

Well History

Date Event
2007-06-29 New Permit Application
2008-05-20 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 1,045.30 214 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 1,576.91 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 1,698.60 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 1,082.95 273 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 1,083.16 274 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 975.14 273 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 655.00 273 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 629.39 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 819.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 829.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 692.34 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2008 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2009 DANNIC ENERGY CORP Produced Fluid 161.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2009 DANNIC ENERGY CORP Produced Fluid 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2011 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2011 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2013 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 3,360.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2019 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1712004 Primary Facility 2008-05-21 Drilling/Alteration No Violations Noted waiting on cement, ran 924' surface
1797785 Primary Facility 2009-05-15 Drilling/Alteration No Violations Noted Well in production, vegetation growing, ~ 20% cover
1799011 Primary Facility 2009-05-15 Routine/Partial Inspection No Violations Noted Well in production, site reclaimed, vegetation 20%, Ag field up to edge of prod pad
1822221 Primary Facility 2009-08-18 Routine/Complete Inspection No Violations Noted Well is completed and in production. Access road leading to well is stable. Area around well is farmed field that has been planted. Vegetation is greater than 70%. Remaining well pad also stable and area around brine tank has layer of gravel. Brine tank is sound. Tag is in place

For data sources see[7]

References