If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-25546 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.043058,"lon":-79.455447,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Toby Township | |
Operator Name: NORTHEAST NATURAL ENERGY LLC | |
Well Pad ID: 144725 | |
Farm/Lease Name: RADAKER B 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.043058 | |
Longitude: -79.455447 |
Date | Event |
---|---|
2011-10-04 | New Permit Application |
2012-06-12 | Performed Spud Operation |
2013-02-19 | New Permit Application |
2014-03-26 | New Permit Application |
2015-03-27 | New Permit Application |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-06 | 2015-08-11 | 5,850 | 4,656,040 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | PA Specific 40/70 mesh Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Iron Oxide | 1309-37-1 | 0.1 | 0.00987618 | 0 |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 9.86606 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.108635 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00987618 | 0 | ||||
Acid Inhibitor 2 (AI-2) | C&J Well Services | Acid Corrosion Inhibitors | 2-Butoxyethanol | 111-76-2 | 20 | 0.000196964 | 0 | |
Propargyl Alcohol | 107-19-7 | 20 | 0.000196964 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 20 | 0.000196964 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000147973 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00009898 | 0 | ||||
OB-2 LT | C&J Well Services | Gel Breakers | Talc | 14807-96-6 | 1 | 0.00000100 | 0 | |
Ammonium Persulfate | 7727-54-0 | 85 | 0.00009398 | 0 | ||||
EC6486A | Nalco-Champion | Scale Inhibitor | Amine Triphosphate | Proprietary | 30 | 0.00134465 | 608.5 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00149668 | 677.3 | ||||
FR-18 | C&J Well Services | Friction Reducer | Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.0350566 | 0 | |
Ethylene Glycol | 107-21-1 | 10 | 0.00779057 | 0 | ||||
Water | Northeast Natural Energy | Water | Water | 7732-18-5 | 100 | 85.8086 | 0 | |
K-139 | Nalco-Champion | Microbial Control | Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride | 68424-85-1 | 30 | 0.0101588 | 4597.2 | |
Glutaraldehyde | 111-30-8 | 10 | 0.00398732 | 1804.4 | ||||
Ethanol | 64-17-5 | 5 | 0.00138837 | 628.284 | ||||
Super GREEN SOLV-M | C&J Well Services | Paraffin & Scale Additives | tetradecane | Proprietary | 11 | 0.000470913 | 0 | |
Tridecane | Proprietary | 9 | 0.000384929 | 0 | ||||
Dodecane | Proprietary | 14 | 0.00059889 | 0 | ||||
Undecane | Proprietary | 8 | 0.000341937 | 0 | ||||
Aliphatic Hydrocarbons | Proprietary | 95 | 0.00406325 | 0 | ||||
PA Specific 100 mesh Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Titanium Oxide | 13463-67-7 | 0.1 | 0.00368432 | 0 | |
Aluminum Oxide | 1344-28-1 | 1.1 | 0.0405326 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.68112 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00368432 | 0 | ||||
Other Ingredients | C&J Well Services | Other Ingredients | Proprietary | Proprietary | 0.02 | 0 | 0 | |
guar gum | 9000-30-0 | 50 | 0.0032694 | 0 | ||||
Organophylic Clay | 68953-58-2 | 10 | 0.00065388 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000393928 | 0 | ||||
Water | 7732-18-5 | 33 | 0.0257083 | 0 | ||||
Alcohol Ethoxylates component | Proprietary | 100 | 0.00389528 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00001000 | 0 | ||||
Anionic Polyacrylamide | Proprietary | 100 | 0.0257083 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000472913 | 0 | ||||
Surfactant | 68439-51-0 | 2 | 0.000130976 | 0 | ||||
Cured Acrylic Resin | Proprietary | 22 | 0.00002400 | 0 | ||||
Crystalline Silica (in the form of quartz) | 14808-60-7 | 2 | 0.000130976 | 0 | ||||
LSG-100L | C&J Well Services | Gelling Agents | Petroleum Distillates | 64742-47-8 | 70 | 0.00457716 | 0 | |
HCl Acid (12.5-18.0%), 22 Baume | C&J Well Services | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.457168 | 0 | |
Hydrochloric Acid | 7647-01-0 | 18 | 0.0940457 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | NORTHEAST NATURAL ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | NORTHEAST NATURAL ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | NORTHEAST NATURAL ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | NORTHEAST NATURAL ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | NORTHEAST NATURAL ENERGY LLC | 125,125.00 | 105 | 0.00 | 0 | 0.00 | 0 |
2016 | NORTHEAST NATURAL ENERGY LLC | 307,847.00 | 269 | 0.00 | 0 | 0.00 | 0 |
2017 | NORTHEAST NATURAL ENERGY LLC | 326,753.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | NORTHEAST NATURAL ENERGY LLC | 258,220.83 | 348 | 0.00 | 0 | 0.00 | 0 |
2019 | NORTHEAST NATURAL ENERGY LLC | 265,627.00 | 358 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | NORTHEAST NATURAL ENERGY LLC | Drilling Fluid Waste | 3,100.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2012 | NORTHEAST NATURAL ENERGY LLC | Drill Cuttings | 275.00 Tons | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 5,743.10 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | NORTHEAST NATURAL ENERGY LLC | Drill Cuttings | 6.00 Tons | LANDFILL | PAD059087072 |
2015 | NORTHEAST NATURAL ENERGY LLC | Fracturing Fluid Waste | 12.00 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | NORTHEAST NATURAL ENERGY LLC | Fracing Fluid Waste | 14,092.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | NORTHEAST NATURAL ENERGY LLC | Fracing Fluid Waste | 14,092.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | NORTHEAST NATURAL ENERGY LLC | Fracing Fluid Waste | 61.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2015 | NORTHEAST NATURAL ENERGY LLC | Fracing Fluid Waste | 1,744.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 739.13 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 5,743.10 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,948.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 211.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,544.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 54.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,948.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,628.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,405.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 198.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 114.96 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 3,590.40 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 3,659.52 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,772.72 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,596.32 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,548.48 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 3,022.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2042410 | Primary Facility | 2012-02-07 | Routine/Complete Inspection | No Violations Noted | |
2077790 | Primary Facility | 2012-06-19 | Drilling/Alteration | No Violations Noted | |
2082776 | Primary Facility | 2012-07-12 | Drilling/Alteration | No Violations Noted | |
2083539 | Primary Facility | 2012-07-16 | Drilling/Alteration | No Violations Noted | |
2084744 | Primary Facility | 2012-07-20 | Drilling/Alteration | No Violations Noted | |
2086139 | Primary Facility | 2012-07-25 | Drilling/Alteration | No Violations Noted | |
2094719 | Primary Facility | 2012-08-17 | Drilling/Alteration | No Violations Noted | |
2097039 | Primary Facility | 2012-08-28 | Routine/Complete Inspection | No Violations Noted | |
2097066 | Primary Facility | 2012-09-04 | Routine/Complete Inspection | No Violations Noted | |
2121731 | Primary Facility | 2012-12-04 | Routine/Complete Inspection | No Violations Noted | |
2128383 | Primary Facility | 2013-01-07 | Routine/Partial Inspection | No Violations Noted | |
2143319 | Primary Facility | 2013-02-20 | Routine/Complete Inspection | No Violations Noted | |
2143348 | Primary Facility | 2013-02-20 | Routine/Complete Inspection | No Violations Noted | |
2340809 | Primary Facility | 2015-01-28 | Routine/Complete Inspection | No Violations Noted | |
2399014 | Primary Facility | 2015-08-05 | Routine/Complete Inspection | No Violations Noted | |
2420971 | Primary Facility | 2015-11-02 | Administrative/File Review | No Violations Noted | |
2425983 | Primary Facility | 2015-10-29 | Routine/Complete Inspection | No Violations Noted | |
2484096 | Primary Facility | 2016-05-09 | Routine/Complete Inspection | No Violations Noted | |
2643607 | Primary Facility | 2017-09-29 | Routine/Complete Inspection | No Violations Noted | This site is located north off of Flick Road in an old field, well 031-25657 also drilled on this site. This site is stable with a good growth of vegetation, the well pad, access road and storage area stoned and stable. Monthly production reporting received for 2015-2017. Production reporting for 2017 shows gas production only in April.
No violations observed. |
2686232 | Primary Facility | 2018-01-25 | Routine/Partial Inspection | No Violations Noted | Well is connected to sales line producing. |
2769493 | Primary Facility | 2018-08-29 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. The tubing pressure was reading as 225 psi, while the production casing gauge was showing 410 psi. The well integrity appeared to be in good condition, with no signs of any leaks. Well has a grate over top and about a foot of water in the cellar. The well was properly labeled. The Emergency Response sign and permit signs remain in place at the entrance to the lease. There were 2 separator/ line heater units onsite and contained within a lined, steel dike were 2 large tanks and 1 smaller for fluids. Production is being reported to the Department. |
2787847 | Primary Facility | 2018-10-11 | Routine/Complete Inspection | No Violations Noted | This site located north off Flick Road in an old pasture field. An ESCGP-2 has been permitted for this site.
WQS Taylor signed off on restoring the cut slope to a 3:1 slope while keeping the drainage the same for the restoration of this pad. The pile of coal and associated overburden removed from the wet pond and stored off the west end of the pad will be reworked to keep water from damming behind the pile and seeping through the coal pile. Planting of the wet pond and construction of final E&S controls needs to be completed immediately. |
2792795 | Primary Facility | 2018-10-22 | Routine/Complete Inspection | No Violations Noted | This site located north off Flick Road in an old pasture field. An ESCGP-2 has been permitted for this site.
WQS Taylor signed off on restoring the cut slope to a 3:1 slope while keeping the drainage the same for the restoration of this pad. No change observed from the last inspection completed on this site. |
2795584 | Primary Facility | 2018-10-29 | Administrative/File Review | No Violations Noted | |
2806216 | Primary Facility | 2018-11-26 | Administrative/File Review | No Violations Noted |
For data sources see[8]