If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-24349 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.011878,"lon":-79.325323,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Porter Township | |
Operator Name: HIGHPOINTE OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: CARLOS 3 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2006-04-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.011878 | |
Longitude: -79.325323 |
Date | Event |
---|---|
2006-04-13 | New Permit Application |
2006-10-02 | Performed Spud Operation |
2006-10-05 | Drilling Completion |
2006-10-25 | Perforation |
2007-01-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | BOYD & SHRIVER INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | BOYD & SHRIVER INC | 5828.00 | 330 | 0.00 | 0 | 0.00 | 0 |
2008 | BOYD & SHRIVER INC | 3653.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | BOYD & SHRIVER INC | 4129.00 | 300 | 0.00 | 0 | 0.00 | 0 |
2010 | HIGHPOINTE OIL & GAS LLC | 8,394.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | HIGHPOINTE OIL & GAS LLC | 3,165.00 | 270 | 0.00 | 0 | 0.00 | 0 |
2012 | HIGHPOINTE OIL & GAS LLC | 4,582.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | HIGHPOINTE OIL & GAS LLC | 2,571.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | HIGHPOINTE OIL & GAS LLC | 2,717.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | HIGHPOINTE OIL & GAS LLC | 1,863.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | HIGHPOINTE OIL & GAS LLC | 4,380.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | HIGHPOINTE OIL & GAS LLC | 1,926.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | HIGHPOINTE OIL & GAS LLC | 2,374.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | HIGHPOINTE OIL & GAS LLC | 2,360.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | BOYD & SHRIVER INC | Brine | 85.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | BOYD & SHRIVER INC | Brine | 47.00 Bbl | Other | PA00020346 |
2011 | HIGHPOINTE OIL & GAS LLC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2015 | HIGHPOINTE OIL & GAS LLC | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1568429 | Primary Facility | 2006-10-03 | Drilling/Alteration | No Violations Noted | |
2210668 | Primary Facility | 2013-09-26 | Routine/Complete Inspection | No Violations Noted | |
2326036 | Primary Facility | 2014-12-04 | Administrative/File Review | No Violations Noted | |
2818699 | Primary Facility | 2018-12-21 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity appeared to be in good condition, however, there was a small thread leak at the production casing valve past the elbow. Only some minor rust was observed. The well was equipped with a separator and tank. The chart was changed on 11/30. The well was properly labeled. Production was reported in 2017 as 1926 mcf for 365 days. |
For data sources see[7]