If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-22677 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02963,"lon":-79.35278,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Porter Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: REID & HOWLEY HEIRS AMBROSE 10 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1992-10-20 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.029630 | |
Longitude: -79.352780 |
Date | Event |
---|---|
1992-08-11 | Perforation |
1992-10-20 | New Permit Application |
1992-12-18 | Performed Spud Operation |
1992-12-22 | Drilling Completion |
1993-09-24 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1996 | CASTLE GAS CO INC | 5798 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | CASTLE GAS CO INC | 5073 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | CASTLE GAS CO INC | 5237 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | CASTLE GAS CO INC | 4198 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | CASTLE GAS CO INC | 4146 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | CASTLE GAS CO INC | 3507 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | CASTLE GAS CO INC | 3459 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | CASTLE GAS CO INC | 3129 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | CASTLE GAS CO INC | 2677 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | CASTLE GAS CO INC | 2796 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | CASTLE GAS CO INC | 3031.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | 2012.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2009 | PETRO DEV CORP | 2848.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PETRO DEV CORP | 1,363.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PDC MOUNTAINEER LLC | 636.88 | 365 | 0.01 | 365 | 0.00 | 0 |
2012 | PETRO DEV CORP | 2,069.09 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | PDC MOUNTAINEER LLC | 1,087.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ALLIANCE PETRO CO LLC | 857.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ALLIANCE PETRO CO LLC | 302.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 478.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 462.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 368.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 335.00 | 303 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1996 | CASTLE GAS CO INC | Brine | 71.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
1999 | CASTLE GAS CO INC | Brine | 35.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2005 | CASTLE GAS CO INC | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2012 | PETRO DEV CORP | Produced Fluid | 60.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2014 | ALLIANCE PETRO CO LLC | Produced Fluid | 160 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | ALLIANCE PETRO CO LLC | Produced Fluid | 160.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
215214 | Primary Facility | 1993-01-04 | Routine/Complete Inspection | Violation(s) Noted | |
215242 | Primary Facility | 1993-01-22 | Routine/Complete Inspection | No Violations Noted | |
215243 | Primary Facility | 1993-01-21 | Routine/Complete Inspection | No Violations Noted | |
215244 | Primary Facility | 1993-01-08 | Routine/Complete Inspection | Violation(s) Noted | |
215245 | Primary Facility | 1993-01-05 | Routine/Complete Inspection | No Violations Noted | |
215260 | Primary Facility | 1993-02-17 | Routine/Complete Inspection | Violation(s) Noted | |
215262 | Primary Facility | 1993-02-08 | Routine/Complete Inspection | Violation(s) Noted | |
215264 | Primary Facility | 1993-02-25 | Routine/Complete Inspection | No Violations Noted | |
215313 | Primary Facility | 1993-03-04 | Routine/Complete Inspection | Violation(s) Noted | |
215314 | Primary Facility | 1993-02-24 | Routine/Complete Inspection | Violation(s) Noted | |
215315 | Primary Facility | 1993-03-09 | Routine/Complete Inspection | No Violations Noted | |
215316 | Primary Facility | 1993-03-18 | Routine/Complete Inspection | No Violations Noted | |
215390 | Primary Facility | 1993-05-11 | Routine/Complete Inspection | Violation(s) Noted | |
215401 | Primary Facility | 1993-06-02 | Routine/Complete Inspection | No Violations Noted | |
215481 | Primary Facility | 1993-07-13 | Routine/Complete Inspection | No Violations Noted | |
215485 | Primary Facility | 1993-07-22 | Routine/Complete Inspection | No Violations Noted | |
215488 | Primary Facility | 1993-07-20 | Routine/Complete Inspection | No Violations Noted | |
215532 | Primary Facility | 1993-08-12 | Routine/Complete Inspection | No Violations Noted | |
215739 | Primary Facility | 1993-12-03 | Routine/Complete Inspection | No Violations Noted | |
215845 | Primary Facility | 1994-03-24 | Routine/Complete Inspection | No Violations Noted | |
216010 | Primary Facility | 1994-06-22 | Routine/Complete Inspection | No Violations Noted | |
2187812 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
219216 | Primary Facility | 1997-07-09 | Routine/Complete Inspection | Violation(s) Noted | |
219420 | Primary Facility | 1997-07-18 | Routine/Complete Inspection | No Violations Noted | |
2804955 | Primary Facility | 2018-11-14 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. I could hear the gas flow. Well integrity appeared to be in good condition, with no signs of any leaks. Well was properly labeled. Well was equipped with a line heater and drip. A 100 bbl tank was also in use. The chart as changed on 10/31. Production was reported in 2017 as 462 mcf for 365 days. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
215214 | 99020 | 01/04/1993 | 1993-01-04 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215244 | 99110 | 01/08/1993 | 1993-01-08 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215260 | 99264 | 02/17/1993 | 1993-02-17 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215262 | 99265 | 02/08/1993 | 1993-02-08 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215313 | 99436 | 03/04/1993 | 1993-03-04 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215314 | 99493 | 02/24/1993 | 1993-02-24 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative | |
215314 | 99494 | 02/24/1993 | 1993-02-24 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
215390 | 100328 | 05/11/1993 | 1993-05-11 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
219216 | 109619 | 07/09/1997 | 1997-07-09 | 301307 - Unpermitted discharge of IW (brine, drill cuttings, & oil spills) | Environmental Health & Safety | |
219216 | 109620 | 07/09/1997 | 1997-07-09 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
For data sources see[7]