X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-023-20233

Well Details

Well ID: 37-023-20233
Loading map...
Country: United States
State: Pennsylvania
County: Cameron
Municipality: Shippen Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 151525
Farm/Lease Name: SRC WT 2354 254HU 52751
License Status:
Spud Date:
Permit Date: 2018-03-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.597360
Longitude: -78.362341

For data sources see[1][2][3]

Well History

Date Event
2018-03-09 New Permit Application
2018-06-05 MOD
2018-06-15 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SENECA RESOURCES CO LLC 536,593.81 165 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 50.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Drill Cuttings 1,531.11 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 74.57 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 48,289.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 2.97 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 19.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.33 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 657.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2743473 Primary Facility 2018-06-19 Routine/Complete Inspection No Violations Noted At the time of this inspection this well status was 120' of 20" conductor only. Well development is ongoing. No violations were noted at this inspection.
2762015 Primary Facility 2018-08-09 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was a condutor only. This is scheduled to be the 5th Utica well drilled on this pad. No set date has been determined for the start of the drilling of this well at the time of this inspection. Justin Greene(drilling consultant) was at this inspection. No violations were noted at the time of this inspection.
2765969 Primary Facility 2018-08-16 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on August 16, 2018 with company man Justin Greene. The site sign, weekly E&S log, drilling permits, emergency response plan, and PPC plan were onsite for review.

There are currently 7 producing Marcellus wells located on the well pad. The operator is currently in the process of drilling 1 of 6 Utica wells. All six Uitca wells have been spud. The operator was is in the process of drilling Utica well 023-20235 using Patterson 328 Rig. The drilling depth was at approximately 6,650 ft. during the Departments inspection. The kick-off point is at 10,500 ft. with a total depth of 21,000 ft.

All rig equipment, tanks, silos, diesel fuel tanks, oils, etc. have been placed on the primary rig timber mat containment. An additional layer of secondary containment separates all of the equipment listed above. Overall, the containment system looks great, no water was observed laying on the containment. A dedicated v

2813529 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on December 11, 2018. The site sign, weekly E&S log, drilling permits, emergency response plan, and PPC plan were onsite for review.

The operator just finished drilling Utica well 023-2033 and then walked the Patterson 328 rig over to begin drilling on well 023-20230. Drilling on Utica well 033-20230 just began today (December 11, 2018).

All rig equipment, tanks, silos, diesel fuel tanks, oils, etc. have been placed on timber rig mats serving as primary containment. An additional layer of secondary containment separates all of the equipment listed above and consists of geotextile and additional liners. Overall, the containment system looks great, no water was observed laying on the containment. A dedicated vacuum set system is stationed onsite within secondary containment. Freshwater is being trucked onsite and offloaded into (4) 400 bbl silos for drilling purposes. The drill mud system is operatin

2825281 Primary Facility 2019-01-10 Routine/Complete Inspection No Violations Noted At the time of this inspection this well had been drilled. Kevin Deal, a drilling consultant was at this inspection. The drilling was started on 11-13-18 and drilling was completed on 12-11-18. No violations were noted at this inspection.
2839643 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted At the time of this inspection the drilling of this well had been completed. The prepping of this well for Hydraulic Fracturing (Stimulation) was complete at the time of this inspection. Adam Pierce (Stimulation consultant) was at this inspection. No violations noted at this inspection.
2850657 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on March 6, 2019.

There are a total of 7 producing Marcellus wells located on this well pad. Each well is currently enclosed in a yellow cage. In addition, there are 6 recently drilled Utica wells on this pad. Each Utica well head is currently wrapped in black fabric. Adjacent to the Utica wells are 5 frac tanks stationed in secondary containment with a berm. Snow was observed within the containment system,

There are 7 gas production units located on the E edge of the well pad. In addition, there are (5) 400 BBL produced fluids tanks stationed in a modular secondary cobtainment along the N edge of the well pad. Water within this containment is frozen and snow covered. Adjacent to the produced fluids containment are 20 manifolded frac tanks stationed in secondary containment with a berm. Snow was observed in the containment system.

The well pad and surrounding areas are snow covered. E&S controls

2856110 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted At the time of this inspection Keane Company was Hydraulic Fracturing (stimulation process) this well. This well and two others are being zipper fractured (a type of fracturing that allows fracturing multiple wells simultaneously). Rich Young, Seneca Resources completion foreman was at this inspection. Anticipation is for mid April to be done with the three wells being stimulated at this inspection. No violations noted at this inspection.

For data sources see[7]

References