X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-023-20193

Well Details

Well ID: 37-023-20193
Loading map...
Country: United States
State: Pennsylvania
County: Cameron
Municipality: Shippen Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 151525
Farm/Lease Name: SRC WT 2354 63H 50713
License Status:
Spud Date: 2014-11-23
Permit Date: 2014-10-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.597591
Longitude: -78.362503

For data sources see[1][2][3]

Well History

Date Event
2014-10-20 New Permit Application
2014-11-14 Performed Spud Operation
2015-03-29 Drilling Completion
2016-01-12 Perforation
2016-01-12 Performed Stage 1 of Stimulation
2016-01-13 Perforation
2016-01-13 Performed Stage 2 of Stimulation
2016-01-14 Perforation
2016-01-15 Perforation
2016-01-15 Performed Stage 3 of Stimulation
2016-01-15 Performed Stage 4 of Stimulation
2016-01-15 Performed Stage 5 of Stimulation
2016-01-16 Perforation
2016-01-16 Performed Stage 6 of Stimulation
2016-01-16 Performed Stage 7 of Stimulation
2016-01-17 Perforation
2016-01-17 Performed Stage 10 of Stimulation
2016-01-17 Performed Stage 11 of Stimulation
2016-01-17 Performed Stage 8 of Stimulation
2016-01-17 Performed Stage 9 of Stimulation
2016-01-18 Perforation
2016-01-18 Performed Stage 12 of Stimulation
2016-01-18 Performed Stage 13 of Stimulation
2016-01-19 Perforation
2016-01-19 Performed Stage 14 of Stimulation
2016-01-19 Performed Stage 15 of Stimulation
2016-01-19 Performed Stage 16 of Stimulation
2016-01-19 Performed Stage 17 of Stimulation
2016-01-20 Perforation
2016-01-21 Perforation
2016-01-21 Performed Stage 23 of Stimulation
2016-01-21 Performed Stage 24 of Stimulation
2016-01-22 Perforation
2016-01-22 Performed Stage 25 of Stimulation
2016-01-25 Perforation
2016-01-25 Performed Stage 26 of Stimulation
2016-01-26 Perforation
2016-01-26 Performed Stage 27 of Stimulation
2016-01-26 Performed Stage 28 of Stimulation
2016-01-27 Perforation
2016-01-27 Performed Stage 29 of Stimulation
2016-01-27 Performed Stage 30 of Stimulation
2016-01-28 Perforation
2016-01-28 Performed Stage 31 of Stimulation
2016-01-29 Perforation
2016-01-29 Performed Stage 32 of Stimulation
2016-01-29 Performed Stage 33 of Stimulation
2016-01-30 Perforation
2016-01-30 Performed Stage 34 of Stimulation
2016-02-01 Perforation
2016-02-01 Performed Stage 35 of Stimulation
2016-02-02 Perforation
2016-02-02 Performed Stage 36 of Stimulation
2016-02-02 Performed Stage 37 of Stimulation
2016-02-02 Performed Stage 38 of Stimulation
2016-02-03 Perforation
2016-02-03 Performed Stage 39 of Stimulation
2016-02-03 Performed Stage 40 of Stimulation
2016-02-03 Performed Stage 41 of Stimulation
2016-02-04 Perforation
2016-02-04 Performed Stage 42 of Stimulation
2016-02-20 Performed Stage 18 of Stimulation
2016-02-20 Performed Stage 19 of Stimulation
2016-02-20 Performed Stage 20 of Stimulation
2016-02-21 Performed Stage 21 of Stimulation
2016-02-21 Performed Stage 22 of Stimulation
2016-06-17 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-12 2016-02-04 6,346 10,263,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-20 Trican Friction Reducer Oleic acid diethanolamide 93-83-4 2 0.00158198 0
Ammonium chloride 12125-02-9 1 0.000790995 0
C12-16 68551-12-2 2 0.00158198 0
Distallates hydrotreated light 64742-47-8 20 0.0158175 0
Polyacrylamide 639418-26-4 30 0.0237244 0
AI-11 Trican Corrosion Inhibitor Potassium iodide 7681-11-0 5 0.00005853 0
Propargyl alcohol derivative proprietary 60 0.000702327 0
Propargyl alcohol 107-19-7 1 0.00001171 0
MBC 516 Trican Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.000822053 0
Glutaraldehyde 111-30-8 27 0.0026741 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.000544736 0
Ethanol 64-17-5 2.8 0.000277321 0
Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.2787 0
LSI-20 Trican Scale Inhibitor Organic phosphonic acids salts proprietary 1 0.000241621 0
Methanol 67-56-1 15 0.00362419 0
Proppant 30/50 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.83242 0
7.5% HydroChloric Acid Trican Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0408263 0
Proppant 40/70 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.84772 0
Proppant 80/100 Oklahoma Trican Proppant Silica 14808-60-7 100 0.947238 0
FEAC 20 Trican Iron Control Acetic acid 64-19-7 50 0.000414374 0
Citric acid 77-92-9 30 0.000248625 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-01-12 1 Ottawa 1,502,480 8,616 7,598
2016-01-13 2 Ottawa 1,502,480 7,901 5,686
2016-01-15 3 Ottawa 1,502,480 7,631 4,736
2016-01-15 4 Ottawa 1,502,480 7,601 4,811
2016-01-15 5 Ottawa 1,502,480 7,307 4,692
2016-01-16 6 Ottawa 1,502,480 7,761 4,806
2016-01-16 7 Ottawa 1,502,480 7,765 4,902
2016-01-17 8 Ottawa 1,502,480 7,852 4,915
2016-01-17 9 Ottawa 1,502,480 7,869 4,722
2016-01-17 10 Ottawa 1,502,480 7,696 5,026
2016-01-17 11 Ottawa 1,502,480 7,890 5,073
2016-01-18 12 Ottawa 1,502,480 7,376 4,694
2016-01-18 13 Ottawa 1,502,480 7,511 4,770
2016-01-19 14 Ottawa 1,502,480 7,326 4,848
2016-01-19 15 Ottawa 1,502,480 7,484 4,943
2016-01-19 16 Ottawa 1,502,480 7,390 4,749
2016-01-19 17 Ottawa 1,502,480 7,174 5,094
2016-02-20 18 Ottawa 1,502,480 7,365 9,105
2016-02-20 19 Ottawa 1,502,480 7,220 4,678
2016-02-20 20 Ottawa 1,502,480 7,169 4,883
2016-02-21 21 Ottawa 1,502,480 7,174 4,986
2016-02-21 22 Ottawa 1,502,480 7,326 4,934
2016-01-21 23 Ottawa 1,502,480 7,210 4,712
2016-01-21 24 Ottawa 1,502,480 7,033 4,965
2016-01-22 25 Ottawa 1,502,480 6,997 5,004
2016-01-25 26 Ottawa 1,502,480 6,860 4,647
2016-01-26 27 Ottawa 1,502,480 6,918 4,782
2016-01-26 28 Ottawa 1,502,480 6,921 4,996
2016-01-27 29 Ottawa 1,502,480 6,744 4,926
2016-01-27 30 Ottawa 1,502,480 6,948 5,000
2016-01-28 31 Ottawa 1,502,480 6,853 5,157
2016-01-29 32 Ottawa 1,502,480 6,725 4,805
2016-01-29 33 Ottawa 1,502,480 6,851 5,143
2016-01-30 34 Ottawa 1,502,480 6,862 4,765
2016-02-01 35 Ottawa 1,502,480 7,302 4,840
2016-02-02 36 Ottawa 1,502,480 6,760 5,376
2016-02-02 37 Ottawa 1,502,480 6,876 4,986
2016-02-02 38 Ottawa 1,502,480 6,642 5,291
2016-02-03 39 Ottawa 1,502,480 6,483 5,055
2016-02-03 40 Ottawa 1,502,480 6,503 5,016
2016-02-03 41 Ottawa 1,502,480 6,682 4,916
2016-02-04 42 Ottawa 1,502,480 6,529 4,715

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 958,474.73 261 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 801,451.89 362 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 566,093.70 363 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 428,573.16 354 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SENECA RESOURCES CO LLC Drill Cuttings 194.00 Tons LANDFILL 100361
2015 SENECA RESOURCES CO LLC Fracing Fluid Waste 51.43 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Servicing Fluid 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SENECA RESOURCES CO LLC Drill Cuttings 835.30 Tons LANDFILL 100361
2015 SENECA RESOURCES CO LLC Drilling Fluid Waste 290.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.35 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 SENECA RESOURCES CO LLC Produced Fluid 3,801.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 178.31 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Fracturing Fluid Waste 178.46 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Produced Fluid 55,970.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 32,092.42 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 127.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.68 Tons LANDFILL 100361
2017 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 0.72 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 167.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 26,254.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 977.32 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 7,382.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 70.71 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Produced Fluid 47.14 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 50.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 656.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 11.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 2.33 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 1,212.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 12,313.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 19.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.33 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2323243 Primary Facility 2014-11-18 Routine/Complete Inspection No Violations Noted
2337086 Primary Facility 2015-01-14 Routine/Complete Inspection No Violations Noted At the time of inspection 1201pm, clear sky, 25 degrees F, light snow cover
2343082 Primary Facility 2015-02-11 Routine/Complete Inspection No Violations Noted
2346852 Primary Facility 2015-02-25 Routine/Complete Inspection No Violations Noted
2353614 Primary Facility 2015-03-19 Routine/Complete Inspection No Violations Noted
2355804 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted At the time of inspection Cloudy sky, light rain and ~33° F.
2360005 Primary Facility 2015-04-07 Routine/Complete Inspection No Violations Noted At the time of inspection cloudy sky, light rain and ~45° F.
2360324 Primary Facility 2015-04-09 Routine/Complete Inspection No Violations Noted
2378039 Primary Facility 2015-06-05 Routine/Complete Inspection No Violations Noted At the time of inspection cloudy sky, ~ 70° F.
2437952 Primary Facility 2016-01-05 Routine/Complete Inspection No Violations Noted
2440297 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted
2444971 Primary Facility 2016-01-29 Complaint Inspection No Violations Noted
2447289 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted
2467204 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted
2474456 Primary Facility 2016-04-04 Routine/Complete Inspection No Violations Noted
2476647 Primary Facility 2016-04-20 Routine/Complete Inspection No Violations Noted
2506077 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2547041 Primary Facility 2016-12-14 Routine/Complete Inspection No Violations Noted
2672433 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted Routine site inspection of Seneca Resources CRV PAD C08-X on December 15, 2017. There are a total of 7 producing Marcellus wells located on this well pad. Stationed near the well heads in secondary man-made containment is a frac tank with a berm. There are 7 gas production units located on the E edge of the well pad. In addition, there are (5) 400 BBL produced fluids tanks stationed in a modular secondary cobtainment along the N edge of the well pad. Water within this containment is frozen and snow covered.

The well pad and surrounding areas are snow covered. E&S controls and PCSM are in place and appear to be functioning as design.

A notice of termination has not been approved to date for this ESCGP and the well pad remains at full built out.

2692454 Primary Facility 2018-02-08 Routine/Complete Inspection No Violations Noted This well was in production at the time of this inspection. The wellhead assembly all flow lines, fittings and vented annulus were tested for gas at this inspection. Results of this testing was that no gas was detected on the well or the well area.
2716798 Primary Facility 2018-04-10 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The annulus vents , all fittings and flow lines were tested for combustable gas. Results of this testing was that no combustable was detected on the wellhead assembly or the well area.
2743239 Primary Facility 2018-06-19 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. No violations were noted at this inspection.
2755407 Primary Facility 2018-07-24 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. No violations were noted on this well at this inspection.
2765961 Primary Facility 2018-08-16 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on August 16, 2018 with company man Justin Greene. The site sign, weekly E&S log, drilling permits, emergency response plan, and PPC plan were onsite for review.

There are currently 7 producing Marcellus wells located on the well pad. The operator is currently in the process of drilling 1 of 6 Utica wells. All six Uitca wells have been spud. The operator was is in the process of drilling Utica well 023-20235 using Patterson 328 Rig. The drilling depth was at approximately 6,650 ft. during the Departments inspection. The kick-off point is at 10,500 ft. with a total depth of 21,000 ft.

All rig equipment, tanks, silos, diesel fuel tanks, oils, etc. have been placed on the primary rig timber mat containment. An additional layer of secondary containment separates all of the equipment listed above. Overall, the containment system looks great, no water was observed laying on the containment. A dedicated v

2813554 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on December 11, 2018. The site sign, weekly E&S log, drilling permits, emergency response plan, and PPC plan were onsite for review.

There are currently 7 producing Marcellus wells located on the well pad. The operator just finished drilling Utica well 023-2033 and then walked the Patterson 328 rig over to begin drilling on well 023-20230. Drilling on Utica well 033-20230 just began today (December 11, 2018).

All rig equipment, tanks, silos, diesel fuel tanks, oils, etc. have been placed on timber rig mats serving as primary containment. An additional layer of secondary containment separates all of the equipment listed above and consists of geotextile and additional liners. Overall, the containment system looks great, no water was observed laying on the containment. A dedicated vacuum set system is stationed onsite within secondary containment. Freshwater is being trucked onsite and offloaded into

2850647 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C08-X on March 6, 2019.

There are a total of 7 producing Marcellus wells located on this well pad. Each well is currently enclosed in a yellow cage. In addition, there are 6 recently drilled Utica wells on this pad. Each Utica well head is currently wrapped in black fabric. Adjacent to the Utica wells are 5 frac tanks stationed in secondary containment with a berm. Snow was observed within the containment system,

There are 7 gas production units located on the E edge of the well pad. In addition, there are (5) 400 BBL produced fluids tanks stationed in a modular secondary cobtainment along the N edge of the well pad. Water within this containment is frozen and snow covered. Adjacent to the produced fluids containment are 20 manifolded frac tanks stationed in secondary containment with a berm. Snow was observed in the containment system.

The well pad and surrounding areas are snow covered. E&S controls

For data sources see[9]

References