X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-023-20182

Well Details

Well ID: 37-023-20182
Loading map...
Country: United States
State: Pennsylvania
County: Cameron
Municipality: Shippen Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 151772
Farm/Lease Name: SRC WT 5034 84H 51292
License Status: PLUGGED & ABANDONED
Spud Date: 2015-04-17
Permit Date: 2014-10-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.570941
Longitude: -78.351586

For data sources see[1][2][3]

Well History

Date Event
2014-10-10 New Permit Application
2014-12-19 New Permit Application
2015-03-20 Performed Spud Operation
2015-04-17 Begin Plugging
2015-06-07 Drilling Completion
2015-07-03 Drilling Completion
2015-07-03 Finished Plugging
2017-08-30 Perforation
2017-08-30 Performed Stage 1 of Stimulation
2017-08-31 Perforation
2017-08-31 Performed Stage 2 of Stimulation
2017-09-01 Perforation
2017-09-01 Performed Stage 3 of Stimulation
2017-09-05 Perforation
2017-09-07 Perforation
2017-09-07 Performed Stage 4 of Stimulation
2017-09-07 Performed Stage 5 of Stimulation
2017-09-07 Performed Stage 6 of Stimulation
2017-09-10 Perforation
2017-09-10 Performed Stage 7 of Stimulation
2017-09-10 Performed Stage 8 of Stimulation
2017-09-10 Performed Stage 9 of Stimulation
2017-09-12 Perforation
2017-09-12 Performed Stage 10 of Stimulation
2017-09-12 Performed Stage 11 of Stimulation
2017-09-12 Performed Stage 12 of Stimulation
2017-09-12 Performed Stage 13 of Stimulation
2017-09-14 Perforation
2017-09-14 Performed Stage 14 of Stimulation
2017-09-14 Performed Stage 15 of Stimulation
2017-09-15 Perforation
2017-09-15 Performed Stage 16 of Stimulation
2017-09-18 Perforation
2017-09-18 Performed Stage 17 of Stimulation
2017-09-18 Performed Stage 18 of Stimulation
2017-09-19 Perforation
2017-09-19 Performed Stage 19 of Stimulation
2017-09-20 Perforation
2017-09-20 Performed Stage 20 of Stimulation
2017-09-20 Performed Stage 21 of Stimulation
2017-09-20 Performed Stage 22 of Stimulation
2017-09-21 Perforation
2017-09-21 Performed Stage 23 of Stimulation
2017-09-21 Performed Stage 24 of Stimulation
2017-09-24 Perforation
2017-09-24 Performed Stage 25 of Stimulation
2017-09-24 Performed Stage 26 of Stimulation
2017-09-25 Perforation
2017-09-25 Performed Stage 27 of Stimulation
2017-09-26 Perforation
2017-09-26 Performed Stage 28 of Stimulation
2017-09-26 Performed Stage 29 of Stimulation
2017-09-26 Performed Stage 30 of Stimulation
2017-09-27 Perforation
2017-09-27 Performed Stage 31 of Stimulation
2017-09-27 Performed Stage 32 of Stimulation
2017-09-28 Perforation
2017-09-28 Performed Stage 33 of Stimulation
2017-09-28 Performed Stage 34 of Stimulation
2017-09-28 Performed Stage 35 of Stimulation
2017-09-29 Perforation
2017-09-29 Performed Stage 36 of Stimulation
2017-09-29 Performed Stage 37 of Stimulation
2017-09-29 Performed Stage 38 of Stimulation
2017-09-30 Performed Stage 39 of Stimulation
2017-09-30 Performed Stage 40 of Stimulation
2020-02-27 Deviated
2020-02-27 Fully Plugged

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-30 2017-09-30 5,426 9,976,850 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.000330733 312.198
Acetic acid 64-19-7 60 0.000496099 468.297
KFR-20 Keane Friction Reducer Ammonium Chloride 12125-02-9 1 0.00093634 883.866
cololymer of 2-propenamide 69418-26-4 30 0.0280902 26516
Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.0187268 17677.3
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00187268 1767.73
oleic acid diethanolamide 93-83-4 2 0.00187268 1767.73
Water 7732-18-5 45 0.0421353 39774
Sand (Proppant) (lbs) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 0.176385 166500
7.5% Acid Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0376245 35515.9
Water 7732-18-5 92.5 0.464036 438030
MBC-516 Keane Biocide gluteral 111-30-8 26.7 0.00231484 2185.11
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000460367 434.567
ethanol 64-17-5 2.8 0.000242755 229.15
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000690984 652.26
KSI-19 NW Keane Scale Inhibitor Aqueous Solution Proprietary 100 0.010364 9783.18
Water (Clean - Acid - Chems) Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 88.1997 83,256,800.0
KAI-12 Keane Acid Inhibitor propan-2-ol 67-63-0 5 0.00006528 61.618
prop-2-yn-1-0l 107-19-7 5 0.00006528 61.618
ethylbenzene 100-41-4 1 0.00001306 12.324
xylne 1330-20-7 5 0.00006528 61.618
fatty imidazoline 61790-69-0 5 0.00006528 61.618
methanol 67-56-1 90 0.00117497 1109.12
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.00006528 61.618
DustProof (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 99.9 10.9964 10,380,200.0
Blend Proprietary 0.1 0.0110075 10390.6

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2017-08-30 1 Ottawa 0 7,457 7,414
2017-08-31 2 Ottawa 0 7,156 2,780
2017-09-01 3 Ottawa 0 7,443 5,085
2017-09-07 4 Ottawa 0 7,354 5,027
2017-09-07 5 Ottawa 0 7,579 5,600
2017-09-07 6 Ottawa 0 7,720 5,959
2017-09-10 7 Ottawa 0 7,640 6,264
2017-09-10 8 Ottawa 0 7,377 6,199
2017-09-10 9 Ottawa 0 7,332 6,005
2017-09-12 10 Ottawa 0 7,348 5,549
2017-09-12 11 Ottawa 0 7,434 5,617
2017-09-12 12 Ottawa 0 7,476 5,508
2017-09-12 13 Ottawa 0 7,277 5,663
2017-09-14 14 Ottawa 0 6,978 5,545
2017-09-14 15 Ottawa 0 7,235 5,078
2017-09-15 16 Ottawa 0 6,642 5,829
2017-09-18 17 Ottawa 0 7,444 5,582
2017-09-18 18 Ottawa 0 6,879 4,410
2017-09-19 19 Ottawa 0 6,873 4,781
2017-09-20 20 Ottawa 0 7,203 5,281
2017-09-20 21 Ottawa 0 7,219 4,998
2017-09-20 22 Ottawa 0 7,171 4,871
2017-09-21 23 Ottawa 0 7,420 4,550
2017-09-21 24 Ottawa 0 7,079 4,897
2017-09-24 25 Ottawa 0 7,253 5,018
2017-09-24 26 Ottawa 0 7,407 4,898
2017-09-25 27 Ottawa 0 6,992 6,861
2017-09-26 28 Ottawa 0 6,605 5,540
2017-09-26 29 Ottawa 0 6,115 4,354
2017-09-26 30 Ottawa 0 6,457 4,510
2017-09-27 31 Ottawa 0 5,999 4,374
2017-09-27 32 Ottawa 0 6,373 4,176
2017-09-28 33 Ottawa 0 6,161 4,346
2017-09-28 34 Ottawa 0 6,087 3,975
2017-09-28 35 Ottawa 0 5,946 4,754
2017-09-29 36 Ottawa 0 5,849 3,971
2017-09-29 37 Ottawa 0 5,910 4,208
2017-09-29 38 Ottawa 0 6,124 4,175
2017-09-30 39 Ottawa 0 5,996 5,866
2017-09-30 40 Ottawa 0 6,141 4,803

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 120,676.23 60 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 38,277.63 63 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 48,400.90 109 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,334.19 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 3.21 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 96.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 25.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 SENECA RESOURCES CO LLC Servicing Fluid 96.25 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 165.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 51,673.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 55.00 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.73 Tons LANDFILL 100361
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 318.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Unused Fracturing Fluid Waste 279.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 SENECA RESOURCES CO LLC Produced Fluid 79.00 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Produced Fluid 162.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 29.47 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 11,765.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Soil Contaminated by Oil & Gas Related Spills 8.24 Tons LANDFILL 100361
2018 SENECA RESOURCES CO LLC Produced Fluid 208.75 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Soil Contaminated by Oil 8.24 Tons LANDFILL 100361
2018 SENECA RESOURCES CO LLC Produced Fluid 131.25 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 1.25 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 312.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.50 Tons LANDFILL 100361
2018 SENECA RESOURCES CO LLC Produced Fluid 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.26 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Produced Fluid 4,278.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 287.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 188.75 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2019 SENECA RESOURCES CO LLC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 102.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 71.25 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2351141 Primary Facility 2015-03-11 Routine/Complete Inspection No Violations Noted
2353605 Primary Facility 2015-03-19 Routine/Complete Inspection No Violations Noted
2355742 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted At the time of inspection Cloudy sky, light rain and ~33° F.
2357085 Primary Facility 2015-04-01 Routine/Complete Inspection No Violations Noted
2358089 Primary Facility 2015-04-02 Routine/Complete Inspection No Violations Noted
2365284 Primary Facility 2015-04-23 Routine/Complete Inspection No Violations Noted
2407773 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted At the time of inspection Cloudy sky, light rain and ~33° F.
2430987 Primary Facility 2015-12-08 Plugging(Includes Plugged/Mined Through) No Violations Noted
2432270 Primary Facility 2015-12-08 Routine/Complete Inspection No Violations Noted
2470485 Primary Facility 2016-03-30 Routine/Complete Inspection No Violations Noted
2474100 Primary Facility 2016-04-12 Routine/Complete Inspection No Violations Noted
2506065 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2610252 Primary Facility 2017-06-13 Routine/Complete Inspection No Violations Noted
2616261 Primary Facility 2017-07-18 Administrative/File Review Violation(s) Noted Administrative Inspection Record created for the purpose of entering Enforcement Record for failure to plug an abandoned well.
2622139 Primary Facility 2017-07-26 Routine/Complete Inspection No Violations Noted Routine inspection of Seneca Resources Corp CRV PAD C09-G on July 26, 2017. No one was onsite during my inspection.

Rig mats remain onsite with a total of 25 produced fluids frac containers. It appears that the operator is gearing up for well stimulation. All wells are labeled with the well number and operator. A total of 9 wells have been TD. Well 023-20182 has been drilled and plugged.

There are 6 produced fluids silos located in secondary containment onsite. Field screen reading for specific conductance within this containment was 82.0 uS/cm.

Overall, the pad is in good condition and all necessary BMPs are in place surrounding the well pad.

The sign located at the entrance to the well pad only has a total of 7 well listed. This does not match with the number of drilled wells onsite. I recommend updating the well site to reflect the number of drilled wells onsite.

2627524 Primary Facility 2017-08-18 Routine/Complete Inspection No Violations Noted Routine inspection of Seneca Resources Corp CRV PAD C09-G on August 17, 2017 with company man Adam Pierce of Seneca Resources.

Crews were currently working on fracing Marcellus wells 023-20178, 023-20179, 023-20183, and 023-20184. The fracing crew was approximately half way done with fracing these four wells. Once finished they will move the rig over and work on stimulating Marcellus wells 023-20180, 023-20181, 023-20182, and 023-20198. According to Mr. Pierce, crews are installing a perforation string downhole and with 8 perforation holes per every 2 ft. section of the string. Plugs made of a composite are being placed between 190 ft. perforation stages.

Sand is being hauled via trucks from the Cameron County rail yard. Water used for stimulation is being transferred to this pad via the above ground water line from the Clermont Water Treatment Facility. The above ground waterline is plumbed into a series of manifolded frac tanks.

All equipment is placed on secondary containment. Overall, the pad is i

2630947 Primary Facility 2017-08-15 Routine/Complete Inspection No Violations Noted
2643030 Primary Facility 2017-10-03 Routine/Complete Inspection No Violations Noted Routine inspection of Seneca Resources Corp CRV PAD C09-G on September 28, 2017 with company man Scott Digel of Seneca Resources.

Crews were currently working on fracing Marcellus wells 023-20182, 023-20183, and 023-20184. The fracing crew was almost completed with well stimulation on these 3 wells. Stimulation been completed on wells 023-20178, 023-20179, 023-29180, 023-20181, and 023-20198. According to Mr. Digel, once all of the wells have been stimulated, crews will remove this rig and bring in 2 work-over rigs to drill out the plugs on the above mentioned wells.

Sand is being hauled via trucks from the Cameron County rail yard, then being trucked to this site. Water used for well stimulation is being transferred to this pad via the above ground water line from the Clermont Water Treatment Facility. The above ground waterline is plumbed into a series of manifolded frac tanks. These tanks are located along the Eastern border of the pad.

All equipment is placed on secondary containment. Overall, th

2668146 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted This well was in production at the time of this inspection. The tubing pressure(production) was 1064 psi. at this inspection. Checked all fittings and vented annulus 20x13, 13x9, and 9x5 at this inspection. Pad and well area were neat and organized.
2672481 Primary Facility 2017-12-15 Routine/Complete Inspection No Violations Noted Routine inspection of Seneca Resources CRV PAD C09-G on December 15, 2017.

There are a total of 8 producing Marcellus wells located on this pad. Rig mats from the recent flowback operation have been removed and are currently being stationed along the N edge of the well pad. There is one frac tank stationed on man-made secondary containment with a berm near the well heads. There are 4 frac tanks located near the produced fluids containment along the S border. These frac tanks are currently not located in secondary containment nor to they appear to be connected to anything. There are (6) 400 BBL produced fluids tanks located in modular secondary containment. Water within the containment is frozen and snow covered. In addition, there's a row of 22 frac tanks stationed along the E edge of the well pad. This series of 22 frac tanks are stationed in secondary man made containment with a berm. There are 8 gas production units stationed along the W edge of the well pad.

The pad and surrounding areas are snow cove

2707931 Primary Facility 2018-03-20 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The wellhead assembly, annulus vents 20" x 13 3/8", 13 3/8" x 9 5/8" and 9 5/8" x 5 1/2" were tested for gas. Results of this testing was that 100% LEL(lower explosion limit) and 42% Methane was detected on the 9 5/8" x 5 1/2" annulus vent. No other gas was detected on the wellhead assembly or the well area.
2734716 Primary Facility 2018-05-24 Incident- Response to Accident or Event No Violations Noted I arrived onsite and met with Jeff Passarello of Seneca in response to a spill report. Between 3 and 4 AM on 5/24, a worker on the site set up to pump produced water from both the Baker tank battery and the production tanks to the Clermont storage facility. The same pump is used to pump water from the well cellars (when needed) along with the produced water, but no pumping was occurring at the cellars. A water line is left in place to the cellars, but capped ~20' from the cellars to allow vehicle traffic through. When the worker turned on the pump, the cap popped off of the water line to the cellars and spilled ~1 1/2 barrels of produced water from the pump to the pad surface. When I arrived, approximately a third to a half of the spill area had already been excavated and a 30 yard dumpster filled. Jeff informed me that they were waiting on another rolloff to continue the excavation. The gravel was underlain by a clay layer, making visual confirmation of the spill removal possible, but Jeff was also u
2792977 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV C09-G Well Pad on October 16, 2018. There are a total of 8 drilled and producing wells located on this well pad. All well heads are properly tagged. Well cellars are full of water. No bubbling or sheen observed in the cellars. There are (6) 400 bbl. produced fluids tanks stationed in secondary containment. Approximately 1" of rain water was found in the produced fluids secondary containment with a conductivity reading of 78.8 uS/cm. A series of 12 manifolded frac tanks are being stationed on secondary along the NE edge of the well pad. Just a trace of water was observed within this containment. Overall, the well site looks good. No violations noted.
2807493 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are two (3) annulus vents openly venting on this well. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2808928 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted Seneca Resources submitted a spud notice to the Department via the Greenport system on November 21, 2018 for the following Utica wells: 023-20238 through 023-20243.

Department representative Sue Herzing conducted a routine site inspection at Seneca Resources CRV Pad C09-G on November 29, 2018. Each 20" round 100' in length conductor was in-place for the above listed wells. In addition, there are a total of 8 producing Marcellus wells located on the pad.

Overall, the well pad was snow covered and frozen. No signs of leaks or spills were observed on the well pad.

No violations noted.

2843517 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was not in production (temporarily shut in). 915 psi (pounds per square inch) was showing on the production/ flow line at the time of this inspection. This well has 3 annulus vents vented to surface. The annulus vents were all tested for combustible gas with a Altair 5 x Multi gas meter. The results were the 20" x 13" tested 0% LEL (lower explosion limit) and 0% METHANE. 13" x 9" tested 0% LEL (lower explosion limit) and 0% METHANE. The 9" x 5" tested 100% LEL (lower explosion limit) and 41% METHANE. This meter was calibrated on 2-20-19. No violations noted at this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2616261 791564 2017-07-18 2017-08-16 78a91(a) Environmental Health & Safety The SRC WT 5034 84H well was drilled to total depth on June 7, 2015 under the authorization of well permit number 023-20182. No production has ever been reported for the SRC WT 5034 84H well. The well is therefore considered "abandoned" in accordance with Section 3203 of the 2012 Oil and Gas Act,

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
791564 356250 NOV - Notice of Violation 2017-08-16

For data sources see[9]

References