X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-20006

Well Details

Well ID: 37-021-20006
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Jackson Township
Operator Name: EQUITRANS LP
Well Pad ID:
Farm/Lease Name: MAUDE EMMA BOLE ET AL 1
License Status: ACTIVE
Spud Date: 1965-11-08
Permit Date: 1901-01-01
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.402681
Longitude: -78.950148

For data sources see[1][2][3]

Well History

Date Event
1965-11-08 Performed Spud Operation
1965-12-29 Drilling Completion
1966-02-15 NEWLY DRILLED
1971-07-01 Drilling Completion
1971-07-14 Drilling Completion
1971-07-21 DRILLED DEEPER
1971-12-30 CONVERTED TO STORAGE (GAS)

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2004 0.00 0 0.00 0 0.00 0
2005 0.00 0 0.00 0 0.00 0
2006 0.00 0 0.00 0 0.00 0
2010 0.00 0 0.00 0 0.00 0
2011 0.00 0 0.00 0 0.00 0
2012 0.00 0 0.00 0 0.00 0
2013 0.00 0 0.00 0 0.00 0
2014 EQUITRANS LP 0.00 0 0.00 0 0.00 0
2015 EQUITRANS LP 0.00 0 0.00 0 0.00 0
2016 EQUITRANS LP 0.00 0 0.00 0 0.00 0
2017 EQUITRANS LP 0.00 0 0.00 0 0.00 0
2018 EQUITRANS LP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 Brine 649.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2010 Produced Fluid 838.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 Produced Fluid 7.68 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OH0987034667
2011 Produced Fluid 812.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 Produced Fluid 0.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OH0987034667
2012 Produced Fluid 0.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101532
2012 Produced Fluid 741.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 Produced Fluid 5.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OHD 066060609
2013 Produced Fluid 575 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 Produced Fluid 575.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2013 Produced Fluid 10.34 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OH0987034667

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1407574 Primary Facility 2005-01-04 Routine/Complete Inspection No Violations Noted
1754193 Primary Facility 2008-12-05 Routine/Complete Inspection No Violations Noted
1838987 Primary Facility 2009-10-29 Routine/Complete Inspection No Violations Noted 2009 inspections - 3143 psi, annulus open, current status - injection, no gas leakage,no E&S issues
2009144 Primary Facility 2011-10-07 Routine/Complete Inspection No Violations Noted no E&S issues. injection well at 3107 psi
2116076 Primary Facility 2012-11-15 Routine/Complete Inspection No Violations Noted injection well - 3025 psi. no es issues
214602 Primary Facility 1992-05-13 Routine/Complete Inspection No Violations Noted STORAGE; E&S OK
214604 Primary Facility 1992-05-12 Routine/Complete Inspection No Violations Noted STORAGE; LOGGING; E&S OK
214606 Primary Facility 1992-05-11 Routine/Complete Inspection No Violations Noted STORAGE; KILLING WELL
214609 Primary Facility 1992-05-04 Routine/Complete Inspection No Violations Noted STORAGE; E&S OK
214641 Primary Facility 1992-05-21 Routine/Complete Inspection No Violations Noted STORAGE; E&S OK
217280 Primary Facility 1995-12-13 Routine/Complete Inspection No Violations Noted 2180 PSI; ANNULUS OPEN
218929 Primary Facility 1996-11-26 Routine/Complete Inspection No Violations Noted 1725/ANNULUS OPEN
2218850 Primary Facility 2013-10-18 Routine/Complete Inspection No Violations Noted Injecting into well. pressurea t 3185 psi. no issues
2316351 Primary Facility 2014-10-21 Routine/Complete Inspection No Violations Noted 3181 psig; could use paint job on wellhead; no valve issues
2421481 Primary Facility 2015-10-27 Routine/Complete Inspection No Violations Noted 3140 psi. no issues
2532330 Primary Facility 2016-10-27 Routine/Complete Inspection No Violations Noted 3151 psi
2624201 Primary Facility 2017-08-02 Plugging(Includes Plugged/Mined Through) No Violations Noted CJ energy set two 600 ft plugs fro 3300 ft to 1950 ft. using poz 50/50.
2649654 Primary Facility 2017-10-19 Routine/Complete Inspection No Violations Noted Well pressure 3139 psi. No issues
2787103 Primary Facility 2018-10-09 Routine/Complete Inspection No Violations Noted Well pressure at 3147 psi. Annulus open.

For data sources see[7]

References