If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22645 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.846578,"lon":-79.935133,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Butler Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 154296 | |
Farm/Lease Name: AK STEEL A UNIT | |
License Status: Active | |
Spud Date: 2017-11-14 | |
Permit Date: 2017-08-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.846578 | |
Longitude: -79.935133 |
Date | Event |
---|---|
2016-04-08 | Perforation |
2016-04-09 | Perforation |
2017-08-07 | New Permit Application |
2017-11-13 | Performed Spud Operation |
2018-02-08 | Deviated |
2018-02-19 | Drilling Completion |
2018-04-01 | Perforation |
2018-04-01 | Performed Stage 1 of Stimulation |
2018-04-01 | Performed Stage 2 of Stimulation |
2018-04-02 | Perforation |
2018-04-02 | Performed Stage 3 of Stimulation |
2018-04-02 | Performed Stage 4 of Stimulation |
2018-04-02 | Performed Stage 5 of Stimulation |
2018-04-02 | Performed Stage 6 of Stimulation |
2018-04-03 | Perforation |
2018-04-03 | Performed Stage 7 of Stimulation |
2018-04-03 | Performed Stage 8 of Stimulation |
2018-04-05 | Perforation |
2018-04-05 | Performed Stage 10 of Stimulation |
2018-04-05 | Performed Stage 9 of Stimulation |
2018-04-06 | Perforation |
2018-04-06 | Performed Stage 11 of Stimulation |
2018-04-06 | Performed Stage 12 of Stimulation |
2018-04-06 | Performed Stage 13 of Stimulation |
2018-04-06 | Performed Stage 14 of Stimulation |
2018-04-07 | Perforation |
2018-04-07 | Performed Stage 15 of Stimulation |
2018-04-07 | Performed Stage 16 of Stimulation |
2018-04-07 | Performed Stage 17 of Stimulation |
2018-04-07 | Performed Stage 18 of Stimulation |
2018-04-08 | Perforation |
2018-04-08 | Performed Stage 19 of Stimulation |
2018-04-08 | Performed Stage 20 of Stimulation |
2018-04-08 | Performed Stage 21 of Stimulation |
2018-04-08 | Performed Stage 22 of Stimulation |
2018-04-08 | Performed Stage 23 of Stimulation |
2018-04-09 | Perforation |
2018-04-09 | Performed Stage 24 of Stimulation |
2018-04-09 | Performed Stage 25 of Stimulation |
2018-04-09 | Performed Stage 26 of Stimulation |
2018-04-09 | Performed Stage 27 of Stimulation |
2018-04-09 | Performed Stage 28 of Stimulation |
2018-04-10 | Perforation |
2018-04-10 | Performed Stage 29 of Stimulation |
2018-04-10 | Performed Stage 30 of Stimulation |
2018-04-10 | Performed Stage 31 of Stimulation |
2018-04-10 | Performed Stage 32 of Stimulation |
2018-04-10 | Performed Stage 33 of Stimulation |
2018-04-11 | Perforation |
2018-04-11 | Performed Stage 34 of Stimulation |
2018-04-11 | Performed Stage 35 of Stimulation |
2018-04-11 | Performed Stage 36 of Stimulation |
2018-04-11 | Performed Stage 37 of Stimulation |
2018-04-11 | Performed Stage 38 of Stimulation |
2018-04-11 | Performed Stage 39 of Stimulation |
2018-04-12 | Perforation |
2018-04-12 | Performed Stage 40 of Stimulation |
2018-04-12 | Performed Stage 41 of Stimulation |
2018-04-12 | Performed Stage 42 of Stimulation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-04-01 | 2018-04-12 | 5,695 | 13,951,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 91.0054 | 0 |
CI-3 | C&J Energy Services | Acid Corrosion Inhibitors | Listed Below | Listed Below | 0 | 0 | 0 | |
Ethoxylated Sorbitan Monooleate | 9005-65-6 | 1 | 0.000814 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.86362 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.911911 | 0 | ||||
Sodium Acetate Anhydrous | 127-09-3 | 3 | 0.002441 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000274 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 35 | 0.02848 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.003867 | 0 | ||||
Water | 7732-18-5 | 30 | 0.024411 | 0 | ||||
Tar Bases, Quinoline Derivs. | 68513-87-1 | 1 | 0.00001800 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00004600 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00009100 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001078 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001485 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.003867 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.00018 | 0 | ||||
Water | 7732-18-5 | 90 | 0.006986 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000366 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.002505 | 0 | ||||
Water | 7732-18-5 | 28.5 | 0.005789 | 0 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00004600 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.016332 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001485 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.027553 | 0 | ||||
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat e |
108818-88-8 | 2 | 0.001627 | 0 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 30 | 0.024411 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000731 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002505 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.004069 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 10 | 0.000776 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.50229 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.48328 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000359 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00008100 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.003376 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.073939 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000274 | 0 | ||||
Water | 7732-18-5 | 30 | 0.000549 | 0 | ||||
Alcohols, C12-15-branched and linear, ethoxylated propoxylated |
120313-48-6 | 2 | 0.001627 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000274 | 0 | ||||
Water | 7732-18-5 | 85 | 0.019129 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.010155 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00004600 | 0 | ||||
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega hydroxy-, branched |
127087-87-0 | 5 | 0.00009100 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006093 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.042542 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 2 | 0.001627 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000359 | 0 | ||||
Water | 7732-18-5 | 96 | 0.017254 | 0 | ||||
SI-6 PA-Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-16 | C&J Energy Services | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
BIO-CLEAR 2000 | C&J Energy Services | Biocides | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-15 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-7.5 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-10 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-04-01 | 1 | Sand | 7,537,494 | 7,512 | 7,875 |
2018-04-01 | 2 | Sand | 7,537,494 | 7,463 | 5,076 |
2018-04-02 | 3 | Sand | 7,537,494 | 7,338 | 5,223 |
2018-04-02 | 4 | Sand | 7,537,494 | 7,382 | 5,819 |
2018-04-02 | 5 | Sand | 7,537,494 | 7,367 | 4,812 |
2018-04-02 | 6 | Sand | 7,537,494 | 7,397 | 4,270 |
2018-04-03 | 7 | Sand | 7,537,494 | 7,177 | 4,227 |
2018-04-03 | 8 | Sand | 7,537,494 | 7,344 | 6,159 |
2018-04-05 | 9 | Sand | 7,537,494 | 7,364 | 4,143 |
2018-04-05 | 10 | Sand | 7,537,494 | 7,330 | 4,490 |
2018-04-06 | 11 | Sand | 7,537,494 | 7,030 | 7,274 |
2018-04-06 | 12 | Sand | 7,537,494 | 6,417 | 4,178 |
2018-04-06 | 13 | Sand | 7,537,494 | 7,210 | 5,534 |
2018-04-06 | 14 | Sand | 7,537,494 | 7,197 | 5,987 |
2018-04-07 | 15 | Sand | 7,537,494 | 7,328 | 6,261 |
2018-04-07 | 16 | Sand | 7,537,494 | 6,607 | 4,235 |
2018-04-07 | 17 | Sand | 7,537,494 | 7,272 | 5,879 |
2018-04-07 | 18 | Sand | 7,537,494 | 7,382 | 6,353 |
2018-04-08 | 19 | Sand | 7,537,494 | 6,887 | 4,552 |
2018-04-08 | 20 | Sand | 7,537,494 | 7,538 | 5,767 |
2018-04-08 | 21 | Sand | 7,537,494 | 7,488 | 6,268 |
2018-04-08 | 22 | Sand | 7,537,494 | 6,851 | 5,895 |
2018-04-08 | 23 | Sand | 7,537,494 | 6,700 | 6,302 |
2018-04-09 | 24 | Sand | 7,537,494 | 7,025 | 6,141 |
2018-04-09 | 25 | Sand | 7,537,494 | 6,854 | 5,801 |
2018-04-09 | 26 | sand | 7,537,494 | 6,757 | 6,311 |
2018-04-09 | 27 | Sand | 7,537,494 | 6,855 | 5,942 |
2018-04-09 | 28 | Sand | 7,537,494 | 6,476 | 6,454 |
2018-04-10 | 29 | Sand | 7,537,494 | 7,165 | 5,974 |
2018-04-10 | 30 | Sand | 7,537,494 | 6,901 | 5,720 |
2018-04-10 | 31 | Sand | 7,537,494 | 6,580 | 5,129 |
2018-04-10 | 32 | Sand | 7,537,494 | 6,646 | 5,684 |
2018-04-10 | 33 | Sand | 7,537,494 | 6,541 | 6,206 |
2018-04-11 | 34 | Sand | 7,537,494 | 6,624 | 6,174 |
2018-04-11 | 35 | Sand | 7,537,494 | 6,941 | 6,146 |
2018-04-11 | 36 | Sand | 7,537,494 | 6,395 | 4,634 |
2018-04-11 | 37 | Sand | 7,537,494 | 6,441 | 4,908 |
2018-04-11 | 38 | Sand | 7,537,494 | 6,492 | 5,711 |
2018-04-11 | 39 | Sand | 7,537,494 | 6,303 | 6,298 |
2018-04-12 | 40 | Sand | 7,537,494 | 6,036 | 5,992 |
2018-04-12 | 41 | Sand | 7,537,494 | 6,057 | 5,215 |
2018-04-12 | 42 | Sand | 7,537,494 | 6,304 | 5,162 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 315,005.97 | 160 | 0.00 | 0 | 930.37 | 160 |
2019 | XTO ENERGY INC | 1,031,629.79 | 364 | 0.00 | 0 | 2,159.54 | 364 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | XTO ENERGY INC | Drilling Fluid Waste | 1,410.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Drill Cuttings | 349.21 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 23.64 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Produced Fluid | 1,865.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Produced Fluid | 1,482.59 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Drill Cuttings | 959.69 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 15.47 Tons | LANDFILL | 100434 |
2018 | XTO ENERGY INC | Waste Water Treatment Sludge | 32.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 27,103.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 320.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 9,504.33 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 4,860.30 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 23,869.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 2,412.95 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2652830 | Primary Facility | 2017-10-26 | Preoperation Inspection | No Violations Noted | Well staked out, ready for spudding.
Well site is fully constructed with all E/S controls installed. Site ID sign and drilling permit on site. |
2664007 | Primary Facility | 2017-11-16 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, a Soilmec SR 30 auger rig is onsite drilling mouse holes. Well was spud and has 24" conductor set to 42'. Cellar is also set. Well was covered with a steel plate. Cuttings were being sent to a roll off. There were sound walls set up on the eastern and northern sides of the pad. Location is stoned. The Emergency Response sign and permit sign are posted at the entrance to the lease access road. |
2671857 | Primary Facility | 2017-12-07 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Appalachian Drillers rig 1 was onsite drilling on the 2H well. This well had surface casing cemented using 530 sxs Class A (115 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 85 bbls water and landed plug at 210 psi. Pressured up to 760 psi and floats held. 7 bbls cement to surface, which fell back down about 9 feet. This was topped off. A float collar and float shoe were used with 5 centralizers. Intermediate casing was cemented with 700 sxs (152 bbls) as same cement used on surface job. Displaced with 155 bbls processed water and landed plug. Floats held and 30 bbls returned to surface. Float shoe and float collar used with 16 centralizers. |
2675453 | Primary Facility | 2017-12-28 | Routine/Partial Inspection | No Violations Noted | Well has intermediate casing ran and cemented. Steel plate over cellar with well in it. Cattle gate on top off steel plate. Sound walls around the East and South ends off the well pad. |
2691914 | Primary Facility | 2018-02-08 | Administrative/File Review | No Violations Noted | |
2695525 | Primary Facility | 2018-02-20 | Administrative/File Review | No Violations Noted | |
2700519 | Primary Facility | 2018-02-22 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Nomac 79 was getting ready to drill on the 2H well. The 1H had production casing cemented using a lead of 340 sxs 35:65 Poz Class H (67 bbls), 15.2 ppg, 1.1 yield and tail of 1240 sxs Class H, 35% Acid Soluble (346 bbls ), 15.6 ppg, 1.56 yield. This was displaced with 305.5 bbls water with inhibitor. Plug was bumped and floats held. 6 bbls of spacer returned so calculated top of cement is at 5100'. |
2707866 | Primary Facility | 2018-03-21 | Administrative/File Review | No Violations Noted | |
2709893 | Primary Facility | 2018-03-26 | Administrative/File Review | No Violations Noted | |
2727896 | Primary Facility | 2018-05-09 | Routine/Partial Inspection | No Violations Noted | On 5/09/2018, WQS Brian MacQuarrie onsite. Additional E/S controls (straw bales) added to infiltration berms along access road. Contact Matt Thomas-XTO Energy, Major Modification to address infiltration basin and berms is in the process of being submitted. No activity on well site. Two wells drilled, Permit No. 019-22645 and 019-22646. |
2734893 | Primary Facility | 2018-05-29 | Administrative/File Review | No Violations Noted | |
2763047 | Primary Facility | 2018-08-13 | Routine/Partial Inspection | No Violations Noted | On 8/13/2018, WQS Brian MacQuarrie onsite. Two wells in production, permit no. 019-22645 and 019- 22646. Tank battery consists of three 400 bbl tanks installed within steel secondary containment structure. Infiltration berms and basin installed. Major modification to address infiltration basin submitted by the operator to the Department. Vegetative growth established in previously disturbed areas. |
2813183 | Primary Facility | 2018-12-10 | Routine/Partial Inspection | No Violations Noted | On 12/10/2018, WQS Brian MacQuarrie conducted a site inspection. Site consists of two wells in production the 1H-019-22645 and 2H -019-22646). Production equipment consists of three 400 bbl tanks, 2 GPus and TVO. A Well Site Restoration Extension request was submitted by the operator on 8/31/2018 for the purpose of addressing stormwater issues. A major modification has been submitted and extension will be granted until 8/30/2019. |
For data sources see[9]