If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22447 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.820019,"lon":-79.900208,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Butler Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152630 | |
Farm/Lease Name: BRISTON UNIT 3H | |
License Status: Active | |
Spud Date: 2015-08-13 | |
Permit Date: 2015-06-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.820019 | |
Longitude: -79.900208 |
Date | Event |
---|---|
2015-06-17 | New Permit Application |
2015-08-13 | Performed Spud Operation |
2015-09-29 | Drilling Completion |
2016-02-03 | Perforation |
2016-02-08 | Perforation |
2016-02-08 | Performed Stage 1 of Stimulation |
2016-02-09 | Perforation |
2016-02-09 | Performed Stage 2 of Stimulation |
2016-02-09 | Performed Stage 3 of Stimulation |
2016-02-10 | Perforation |
2016-02-10 | Performed Stage 4 of Stimulation |
2016-02-10 | Performed Stage 5 of Stimulation |
2016-02-11 | Perforation |
2016-02-11 | Performed Stage 6 of Stimulation |
2016-02-14 | Perforation |
2016-02-15 | Perforation |
2016-02-15 | Performed Stage 7 of Stimulation |
2016-02-15 | Performed Stage 8 of Stimulation |
2016-02-16 | Perforation |
2016-02-16 | Performed Stage 10 of Stimulation |
2016-02-16 | Performed Stage 9 of Stimulation |
2016-02-17 | Perforation |
2016-02-17 | Performed Stage 11 of Stimulation |
2016-02-17 | Performed Stage 12 of Stimulation |
2016-02-19 | Perforation |
2016-02-20 | Perforation |
2016-02-20 | Performed Stage 13 of Stimulation |
2016-02-20 | Performed Stage 14 of Stimulation |
2016-02-20 | Performed Stage 15 of Stimulation |
2016-02-21 | Perforation |
2016-02-21 | Performed Stage 16 of Stimulation |
2016-02-21 | Performed Stage 17 of Stimulation |
2016-02-21 | Performed Stage 18 of Stimulation |
2016-02-21 | Performed Stage 19 of Stimulation |
2016-02-22 | Perforation |
2016-02-22 | Performed Stage 20 of Stimulation |
2016-02-22 | Performed Stage 21 of Stimulation |
2016-02-22 | Performed Stage 22 of Stimulation |
2016-02-23 | Perforation |
2016-02-23 | Performed Stage 23 of Stimulation |
2016-02-23 | Performed Stage 24 of Stimulation |
2016-02-23 | Performed Stage 25 of Stimulation |
2016-02-24 | Perforation |
2016-02-24 | Performed Stage 26 of Stimulation |
2016-02-24 | Performed Stage 27 of Stimulation |
2016-02-24 | Performed Stage 28 of Stimulation |
2016-02-25 | Perforation |
2016-02-25 | Performed Stage 29 of Stimulation |
2016-02-25 | Performed Stage 30 of Stimulation |
2016-02-25 | Performed Stage 31 of Stimulation |
2016-02-26 | Perforation |
2016-02-26 | Performed Stage 32 of Stimulation |
2016-02-26 | Performed Stage 33 of Stimulation |
2016-02-27 | Perforation |
2016-02-27 | Performed Stage 34 of Stimulation |
2016-02-27 | Performed Stage 35 of Stimulation |
2016-02-27 | Performed Stage 36 of Stimulation |
2016-12-19 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-02-08 | 2016-02-27 | 5,997 | 15,595,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 1.66997 | 2,306,690.0 |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0039702 | 5483.94 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0009133 | 1261.5 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.424883 | 586880 | |
Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.569416 | 786520 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Ammonium Chloride | 12125-02-9 | 3 | 0.0013842 | 1912.09 | |
Methanol | 67-56-1 | 100 | 0.0009132 | 1261.5 | ||||
Water | 7732-18-5 | 92.5 | 0.453651 | 626675 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00004570 | 63.075 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.0138417 | 19120.9 | ||||
Polyoxyalkylenes | 68951-67-7 | 30 | 0.000274 | 378.45 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0009228 | 1274.73 | ||||
Ethanol | 64-17-5 | 5 | 0.000356 | 491.75 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0037557 | 5188.2 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.30312 | 7,325,750.0 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0002307 | 318.682 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0688956 | 95172.6 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0023904 | 3302.11 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0016692 | 2305.87 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0004173 | 576.467 | ||||
Citric Acid | 77-92-9 | 60 | 0.0023819 | 3290.36 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.000356 | 491.75 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0021359 | 2950.5 | ||||
Olefin | 64743-02-8 | 5 | 0.00004570 | 63.075 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0002307 | 318.682 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000910 | 12.615 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.00008350 | 115.293 | ||||
Modified Thiourea Polymer | 68527-49-1 | 7 | 0.00006390 | 88.305 | ||||
Fatty Acids | 61790-12-3 | 10 | 0.00009130 | 126.15 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0138417 | 19120.9 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.000712 | 983.5 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0009228 | 1274.73 | ||||
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 94.1273 | 130,028,000.0 | |
Sand, White, 30/50 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 3.06423 | 4,232,550.0 | |
Scaletrol 720, 330 gl tote | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0083468 | 11529.3 | |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0071202 | 9835 | |
HCl, 5.1 - 7.5% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.068806 | 95040 | |
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0461432 | 63736.4 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-02-08 | 1 | SAND | 12,359,884 | 7,654 | 5,511 |
2016-02-09 | 2 | SAND | 12,359,884 | 6,842 | 4,911 |
2016-02-09 | 3 | SAND | 12,359,884 | 7,386 | 5,025 |
2016-02-10 | 4 | SAND | 12,359,884 | 7,512 | 4,705 |
2016-02-10 | 5 | SAND | 12,359,884 | 7,784 | 5,083 |
2016-02-11 | 6 | SAND | 12,359,884 | 8,142 | 5,004 |
2016-02-15 | 7 | SAND | 12,359,884 | 6,502 | 4,571 |
2016-02-15 | 8 | SAND | 12,359,884 | 6,903 | 5,420 |
2016-02-16 | 9 | SAND | 12,359,884 | 6,534 | 5,638 |
2016-02-16 | 10 | SAND | 12,359,884 | 6,846 | 5,757 |
2016-02-17 | 11 | SAND | 12,359,884 | 6,923 | 4,832 |
2016-02-17 | 12 | SAND | 12,359,884 | 6,935 | 5,437 |
2016-02-20 | 13 | SAND | 12,359,884 | 6,817 | 5,820 |
2016-02-20 | 14 | SAND | 12,359,884 | 6,820 | 5,624 |
2016-02-20 | 15 | SAND | 12,359,884 | 6,570 | 5,185 |
2016-02-21 | 16 | SAND | 12,359,884 | 5,541 | 5,899 |
2016-02-21 | 17 | SAND | 12,359,884 | 6,461 | 5,466 |
2016-02-21 | 18 | SAND | 12,359,884 | 6,578 | 5,193 |
2016-02-21 | 19 | SAND | 12,359,884 | 6,592 | 5,451 |
2016-02-22 | 20 | SAND | 12,359,884 | 6,291 | 4,993 |
2016-02-22 | 21 | SAND | 12,359,884 | 6,521 | 3,734 |
2016-02-22 | 22 | SAND | 12,359,884 | 6,513 | 5,449 |
2016-02-23 | 23 | SAND | 12,359,884 | 6,786 | 5,831 |
2016-02-23 | 24 | SAND | 12,359,884 | 6,533 | 4,765 |
2016-02-23 | 25 | SAND | 12,359,884 | 6,122 | 4,881 |
2016-02-24 | 26 | SAND | 12,359,884 | 6,281 | 4,874 |
2016-02-24 | 27 | SAND | 12,359,884 | 6,363 | 5,430 |
2016-02-24 | 28 | SAND | 12,359,884 | 6,182 | 4,973 |
2016-02-25 | 29 | SAND | 12,359,884 | 6,153 | 4,827 |
2016-02-25 | 30 | SAND | 12,359,884 | 6,072 | 5,189 |
2016-02-25 | 31 | SAND | 12,359,884 | 5,820 | 3,665 |
2016-02-26 | 32 | SAND | 12,359,884 | 6,273 | 5,273 |
2016-02-26 | 33 | SAND | 12,359,884 | 6,102 | 5,248 |
2016-02-27 | 34 | SAND | 12,359,884 | 5,997 | 6,351 |
2016-02-27 | 35 | SAND | 12,359,884 | 6,412 | 6,524 |
2016-02-27 | 36 | SAND | 12,359,884 | 5,642 | 4,348 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 188,476.00 | 114 | 0.00 | 0 | 727.09 | 114 |
2017 | XTO ENERGY INC | 992,707.00 | 358 | 0.00 | 0 | 3,598.04 | 358 |
2018 | XTO ENERGY INC | 238,680.03 | 163 | 73.02 | 14 | 840.53 | 149 |
2019 | XTO ENERGY INC | 643,825.29 | 351 | 0.00 | 0 | 3,233.61 | 351 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 1,392.49 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 6,338.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 990.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 85.91 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 5,642.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 1,950.25 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 2,840.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 753.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 10,498.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 305.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 740.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,936.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,883.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 623.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 107.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2398725 | Primary Facility | 2015-08-14 | Routine/Partial Inspection | No Violations Noted | |
2399778 | Primary Facility | 2015-08-18 | Drilling/Alteration | No Violations Noted | |
2412343 | Primary Facility | 2015-10-01 | Routine/Partial Inspection | No Violations Noted | |
2453611 | Primary Facility | 2016-02-24 | Drilling/Alteration | No Violations Noted | |
2486265 | Primary Facility | 2016-05-18 | Complaint Inspection | No Violations Noted | |
2486271 | Primary Facility | 2016-05-19 | Complaint Inspection | No Violations Noted | |
2496031 | Primary Facility | 2016-06-27 | Administrative/File Review | No Violations Noted | |
2508350 | Primary Facility | 2016-08-03 | Complaint Inspection | No Violations Noted | |
2511391 | Primary Facility | 2016-08-16 | Administrative/File Review | No Violations Noted | |
2539622 | Primary Facility | 2016-11-15 | Routine/Partial Inspection | No Violations Noted | |
2619150 | Primary Facility | 2017-07-26 | Routine/Partial Inspection | No Violations Noted | On site for a partial inspection.
Well is drilled, completed, and in production. Well head is fenced with jersey barriers. There is a well tag. Production equipment in place, production tanks on containment, there is one GPU, and one combustor. Well is connected to a gathering pipeline. Well site has been restored, the PCSM plan implemented and has 100% vegetation. |
2680052 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | On 1/9/2018, WQS Brian MacQuarrie onsite. One well in production properly tagged. Soundwall installed around well pad. Production equipment installed outside of sound wall, which includes gpu and two 400 bbl production tanks installed within stainless steel containment structure. Site sign maintained at entrance. Snow covered ground. No apparent issues. |
2731921 | Primary Facility | 2018-05-21 | Routine/Partial Inspection | No Violations Noted | On 5/21/2018, WQS Brian MacQuarrie onsite, Well stimulation notification received from operator today. Well site consists of one well in production(3H-37-019-22447) and the (5H-37-019-22696) scheduled for stimulation activities. Sound wall maintained around well pad. Erosion and Sedimentation best management practices maintained. Vegetative growth well established. |
2749765 | Primary Facility | 2018-07-09 | Routine/Partial Inspection | No Violations Noted | On 7/09/208, WQS Brian MacQuarrie onsite. Well stimulation activities concluded on the 5H. The well site consists of the (3H-37-019-22447) and the (5H-37-019-22696). Wells currently shut-in until coil tubing rig can do clean out run. Sound wall maintained around well pad. Post drilling well site restoration report for the Briston B Unit 5H received by the Department. Erosion and Sedimentation best management practices maintained. Vegetative growth well established. |
2836897 | Primary Facility | 2019-02-06 | Routine/Partial Inspection | No Violations Noted | On 2/6/2019, WQS Brian MacQuarrie onsite. Meet with George Eckman-XTO well tender. Site sign installed at entrance to site. Access road maintained. Well site consists of one well in production 3H (019-22447) and one well fraced 5H (019-22696). Waiting on snubbing unit to finish 5H. Well site temporary secondary containment setup. Tank battery consists of three 400 bbl tanks ( one condensate and two production water installed within secondary containment structure). Previously disturbed areas well vegetated. |
For data sources see[9]