X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22215

Well Details

Well ID: 37-019-22215
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150936
Farm/Lease Name: VADNAL B UNIT 5H
License Status:
Spud Date:
Permit Date: 2014-02-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.768769
Longitude: -79.852883

For data sources see[1][2][3]

Well History

Date Event
2014-02-24 New Permit Application
2014-04-16 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2019 XTO ENERGY INC 885,088.28 348 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,322.76 Tons LANDFILL 100403
2018 XTO ENERGY INC Synthetic Liner Materials 2.23 Tons LANDFILL 100434
2018 XTO ENERGY INC Other Oil & Gas Wastes 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 1,255.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 13,377.55 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 3,037.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 4,633.15 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Waste Water Treatment Sludge 38.59 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Synthetic Liner Materials 18.38 Tons LANDFILL 100434
2019 XTO ENERGY INC Produced Fluid 120.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 19,315.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2273405 Primary Facility 2014-05-21 Drilling/Alteration No Violations Noted
2299904 Primary Facility 2014-08-26 Drilling/Alteration No Violations Noted
2338783 Primary Facility 2015-01-16 Routine/Partial Inspection No Violations Noted
2345012 Primary Facility 2015-02-13 Routine/Partial Inspection No Violations Noted
2551262 Primary Facility 2017-01-06 Routine/Partial Inspection No Violations Noted
2687357 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At the time of inspection, well was shut in. Well does not have a Christmas tree yet, only wellhead. There were no leaks or corrosion associated with the well. The well was properly labeled and ER sign remains posted. There were 5 tanks and 4 line heaters within a lined, steel dike. A gas buster was also on site.

A homeowner in the area recently called in. I did not detect any gas during my inspection.

2693270 Primary Facility 2018-02-12 Routine/Partial Inspection No Violations Noted On 2/12/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two post construction infiltration basins maintained. Four wells drilled ( two in production). Five 400 bbl tanks installed within secondary stainless steel containment structure. No apparent issues.
2809340 Primary Facility 2018-11-30 Routine/Partial Inspection No Violations Noted On 11/30/2018, WQS Brian MacQuarrie onsite. Well stimulation activities completed at wells A3H (37-019-22213) and B5H (37-019-22215). Wells 10HB (37-019-22214) and 7H (37-019-22216) shut in. No activity onsite today. Waiting on coil tubing. Twenty-two frac tanks staged onsite. Tank battery consists of five 400bbl tanks in containment. Infiltration basin maintained. Snow on ground during inspection.

For data sources see[7]

References