X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22176

Well Details

Well ID: 37-019-22176
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145088
Farm/Lease Name: CYPHER B UNIT 3H
License Status:
Spud Date:
Permit Date: 2013-12-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.882508
Longitude: -79.749667

For data sources see[1][2][3]

Well History

Date Event
2013-12-16 New Permit Application
2013-12-26 Performed Spud Operation
2014-03-15 Drilling Completion
2014-08-19 Perforation
2015-03-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-12 2014-10-15 5,885 7,040,180 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.94789 6,570,500.0
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.9493 58,750,300.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.0074733 4936.06
Ethylene Glycol 107-21-1 30 0.00320284 2115.45
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0151634 10015.3
Hydrochloric Acid 7647-01-0 7.5 0.0133438 8813.48
Hydrochloric Acid 7647-01-0 7.5 0.0321465 21232.5
Other - (non-hazardous) NA 92.5 0.748063 494089
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00540163 3567.73
Hydrochloric Acid 7647-01-0 15 0.00224219 1480.94
Other - (non-hazardous) NA 85 0.0577533 38145.5
Hydrochloric Acid 7647-01-0 15 0.00254794 1682.89
Biocide, EC6116A Nalco Biocide Other - (non-hazardous) NA 5 0.00104235 688.463
Dibromoacetonitrile 3252-43-5 5 0.00104235 688.463
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00625409 4130.77
Polyethylene Glycol 25322-68-3 60 0.0125082 8261.55
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0436692 28843.1
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0187154 12361.3
Acetic Acid (10%) Sagar Acidizing Acetic Acid 64-19-7 10 0.0131853 8708.81
Other - (non-hazardous) NA 90 0.118668 78379.3
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000408 2.694
Short chained glycol ether 112-34-5 60 0.000244683 161.611
Methanol 67-56-1 5 0.00002039 13.468
Ethoxylated alcohol 68002-97-1 35 0.000142732 94.273
Thiourea 62-56-6 1 0.00000408 2.694
Acetophenone 98-86-2 1 0.00000408 2.694

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 164,875.00 142 0.00 0 0.00 0
2016 XTO ENERGY INC 232,575.00 327 0.00 0 34.99 85
2017 XTO ENERGY INC 71,224.00 103 0.00 0 0.00 0
2018 XTO ENERGY INC 126,758.25 188 0.00 0 11.25 14
2019 XTO ENERGY INC 55,641.72 144 0.00 0 1.49 89

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 194.00 Tons LANDFILL 100403
2013 XTO ENERGY INC Drill Cuttings 240.00 Tons LANDFILL 101397
2014 XTO ENERGY INC Fracing Fluid Waste 811.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 197.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Drill Cuttings 995.00 Tons LANDFILL 100403
2015 XTO ENERGY INC Produced Fluid 2,624.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 1,439.10 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 16,889.47 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 534.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Fracing Fluid Waste 210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 4,281.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 435.70 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 362.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Fracturing Fluid Waste 0.71 Tons RESIDUAL WASTE TRANSFER FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 835.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 3,941.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 466.77 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Other Oil & Gas Wastes 3.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 455.04 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 1,165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 170.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 3,084.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 89.26 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 430.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 202.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 625.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 117.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2235539 Primary Facility 2014-01-09 Routine/Partial Inspection No Violations Noted
2256247 Primary Facility 2014-03-19 Drilling/Alteration No Violations Noted
2323909 Primary Facility 2014-11-25 Routine/Partial Inspection No Violations Noted
2487140 Primary Facility 2016-05-20 Routine/Partial Inspection No Violations Noted
2532629 Primary Facility 2016-10-19 Routine/Partial Inspection No Violations Noted
2595781 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of the Cypher B Unit 3H Well.

Well is drilled & completed, and in production.

Well is attached to production equipment (production tank, GPU, & combustor). Well feeds to a gathering pipeline on site. Well tag in place. Well is fenced & protected with jersey barriers.

Well pad has been restored per the PCSM plans. All temporary E/S controls removed.

2791122 Primary Facility 2018-10-18 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Well protected.

Site has 10 drilled and completed wells. Wells are fenced. Site has 12 production tanks on containment. Site has 10 GPUs on containment. There is 1 combustor on site. There is a pipeline header on the well pad.

2815863 Primary Facility 2018-12-14 Routine/Partial Inspection No Violations Noted On 12/14/2018, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Well site consists of 10 wells in production permit nos. A1H (019-22019), B1H (019-22020), A2H (019-22053), A3H (019-22054), B2H (019-22166), A4H (019-22167), A5H (019-22173), B5H (019-22174), B4H (019-22175) and B3H (019-22176). Production equipment consists of twelve 400 bbl tanks within stainless steel containment structure, 10 GPUs and one TVO. Site well vegetated and maintained. Earth disturbance permit ESX12-019-0161 terminated on 5/19/2017.

For data sources see[8]

References