X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22137

Well Details

Well ID: 37-019-22137
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145303
Farm/Lease Name: DREHER A UNIT 3H
License Status:
Spud Date: 2014-06-28
Permit Date: 2013-08-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.851680
Longitude: -79.823681

For data sources see[1][2][3]

Well History

Date Event
Deviated
2013-08-27 New Permit Application
2014-06-17 Performed Spud Operation
2014-10-02 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-16 2016-12-07 5,916 10,510,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KSI-16NW Keane Scale Inhibitor Alkyl phosphonic acid Proprietary 10 0.000194086 186.636
ammonia 7664-41-7 1 0.00001941 18.664
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Water 7732-18-5 92.5 0.706421 679304
Hydrochloric Acid 7647-01-0 7.5 0.0572774 55078.7
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 7.87448 7,572,200.0
Other Chemical(s) Listed Above See Trade Name(s) List Ethoxylated alcohol 68131-39-5 10 0.000112703 108.377
Cinnamaldehyde 104-55-2 10 0.000112703 108.377
Ethylen glycol 107-21-1 40 0.0077513 7453.75
didecyldimethylammonium chloride 7173-51-5 8 0.000654332 629.215
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000435948 419.213
formic acid 64-18-6 10 0.000112703 108.377
Alkyl phosphonic acid Proprietary 10 0.000194086 186.636
Fatty alcohols ethoxylated Proprietary 2 0.00164801 1584.75
Alcohols, C12-16, ethoxylated propoxylated 68213-24-1 2 0.00164801 1584.75
Water 7732-18-5 85 0.0351307 33782.1
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000112703 108.377
Water 7732-18-5 92.5 0.706421 679304
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000225406 216.753
ethanediol 107-21-1 10 0.00824005 7923.74
propan-2-ol 67-63-0 5 0.00005635 54.188
Alkyl phosphonic acid Proprietary 10 0.00193783 1863.44
KAI-13 Keane Acid Inhibitor ethanediol 107-21-1 40 0.000450811 433.506
formic acid 64-18-6 10 0.000112703 108.377
propan-2-ol 67-63-0 5 0.00005635 54.188
Ethoxylated alcohol 68131-39-5 10 0.000112703 108.377
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000225406 216.753
Cinnamaldehyde 104-55-2 10 0.000112703 108.377
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.000112703 108.377
MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000435948 419.213
didecyldimethylammonium chloride 7173-51-5 8 0.000654332 629.215
glutaral 111-30-8 26.7 0.00219205 2107.91
KSI-16 Keane Scale Inhibitor ammonia 7664-41-7 1 0.000193783 186.344
Ethylen glycol 107-21-1 40 0.0077513 7453.75
Alkyl phosphonic acid Proprietary 10 0.00193783 1863.44
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00619953 5961.55
Water 7732-18-5 85 0.0351307 33782.1
Water XTO Carrier/Base Fluid Water 7732-18-5 100 91.2074 87,706,300.0
KFR-17 Keane Friction Reducer ethanediol 107-21-1 10 0.00824005 7923.74
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0370802 35656.8
Fatty alcohols ethoxylated Proprietary 2 0.00164801 1584.75
Alcohols, C12-16, ethoxylated propoxylated 68213-24-1 2 0.00164801 1584.75

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 315,972.00 187 0.00 0 120.97 123
2018 XTO ENERGY INC 348,328.95 304 0.00 0 57.69 177
2019 XTO ENERGY INC 208,986.09 220 0.00 0 91.10 190

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,217.80 Tons LANDFILL 100585
2017 XTO ENERGY INC Produced Fluid 1,149.37 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 228.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 41.88 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid 1,132.98 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Soil Contaminated by Oil 0.35 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.35 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid 1,276.33 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 14,807.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Other Oil & Gas Wastes 123.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 207.11 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 8,046.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 8,176.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,785.51 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 2,761.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 1,242.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2280639 Primary Facility 2014-06-20 Routine/Partial Inspection No Violations Noted
2288983 Primary Facility 2014-07-21 Routine/Partial Inspection No Violations Noted
2308023 Primary Facility 2014-09-29 Drilling/Alteration No Violations Noted
2311229 Primary Facility 2014-10-07 Routine/Partial Inspection No Violations Noted
2335941 Primary Facility 2015-01-13 Routine/Partial Inspection No Violations Noted
2360274 Primary Facility 2015-04-10 Routine/Partial Inspection No Violations Noted
2569641 Primary Facility 2017-02-28 Routine/Partial Inspection No Violations Noted
2569826 Primary Facility 2017-02-28 Administrative/File Review No Violations Noted
2699636 Primary Facility 2018-02-27 Site Restoration No Violations Noted On 2/27/2018, WQS Brian MacQuarrie onsite. The site sign is maintained at entrance to site. Well pad has 11 wells drilled and tagged. Eight are in production including Permit Nos. 37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208. Three wells are not setup for production, Well Permit Nos. 37-019-22147, 37-019-22177 and 37-019-22178. Tank battery consists of nine 400 bbl tanks installed within secondary steel containment. The site has been restored and vegetative growth well established in previously disturbed areas. Temporary BMPs removed. PCSM BMPS installed.

Therefore the Notice of Termination request is approved.

2775470 Primary Facility 2018-09-11 Routine/Partial Inspection No Violations Noted On 9/13/2018, WQS Brian MacQuarrie onsite. The site sign is maintained at entrance to site. Well pad has 11 wells drilled and tagged. Eight are in production including Permit Nos. 37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208. Three wells are not setup for production, Well Permit Nos. 37-019-22147, 37-019-22177 and 37-019-22178. Tank battery consists of nine 400 bbl tanks installed within secondary steel containment. The site has been restored and vegetative growth well established in previously disturbed areas. PCSM BMPS maintained.
2809282 Primary Facility 2018-11-30 Routine/Partial Inspection No Violations Noted On 11/30/2018, WQS Brian MacQuarrie onsite meet with Jeff Voltz (XTO). Well stimulation activities currently underway for wells A5H (37-019-22147), B4H (37-019-22177) and B5H (37-019-22178). The other 8 wells (37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208), previously in production are currently shut-in until stimulation activities are completed. Containment setup on well pad. Freshwater is being pumped in from Kozik impoundment. PCSM plan maintained.

For data sources see[8]

References