X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22004

Well Details

Well ID: 37-019-22004
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Donegal Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149522
Farm/Lease Name: WALTMAN B UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-12-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.926956
Longitude: -79.748547

For data sources see[1][2][3]

Well History

Date Event
2012-12-19 New Permit Application
2013-02-11 Performed Spud Operation
2013-03-20 Drilling Completion
2013-11-13 Perforation
2014-08-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-23 2014-05-15 5,905 7,693,690 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0375192 27152.2
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0160797 11636.7
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.7176 64,203,800.0
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 0.597643 432507
Hydrochloric Acid 7647-01-0 7.5 0.0121144 8767.04
Hydrochloric Acid 7647-01-0 7.5 0.0256825 18586.1
Hydrochloric Acid 7647-01-0 7.5 0.0106607 7714.99
Acetic Acid (10%) Sagar Acidizing Other - (non-hazardous) NA 90 0.190422 137806
Acetic Acid 64-19-7 10 0.021158 15311.8
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0031136 2253.28
Other - (non-hazardous) NA 70 0.00726507 5257.65
Biocide, EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000506653 366.658
Polyethylene Glycol 25322-68-3 60 0.00607983 4399.9
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00303992 2199.95
Other - (non-hazardous) NA 5 0.000506653 366.658
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.49705 6,872,900.0
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0281352 20361.1
Hydrochloric Acid 7647-01-0 15 0.0677804 49051.8
Other - (non-hazardous) NA 85 0.724696 524454
Hydrochloric Acid 7647-01-0 15 0.0319719 23137.7
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short chained glycol ether 112-34-5 60 0.000608343 440.25
Acetophenone 98-86-2 1 0.00001014 7.338
Formaldehyde 50-00-0 1 0.00001014 7.338
Ethoxylated alcohol 68002-97-1 35 0.000354867 256.813
Thiourea 62-56-6 1 0.00001014 7.338
Methanol 67-56-1 5 0.00005070 36.688

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 306,930.00 107 0.00 0 292.72 107
2015 XTO ENERGY INC 556,969.00 350 0.00 0 571.83 171
2016 XTO ENERGY INC 386,092.00 337 0.00 0 435.27 276
2017 XTO ENERGY INC 358,895.00 362 0.00 0 418.05 362
2018 XTO ENERGY INC 294,500.74 355 3.39 30 247.54 325
2019 XTO ENERGY INC 251,168.25 350 0.00 0 269.68 350

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 2,005.98 Tons LANDFILL 100403
2013 XTO ENERGY INC Drilling Fluid Waste 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2014 XTO ENERGY INC Produced Fluid 3,259.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 424.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 448.10 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 660.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 8,160.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 1,161.30 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 675.65 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 415.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 6,777.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Filter Socks 8.61 Tons LANDFILL 100585
2016 XTO ENERGY INC Produced Fluid 1,785.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,610.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 781.29 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 370.31 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 1,908.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 2,331.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 488.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 782.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 865.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2138453 Primary Facility 2013-02-12 Drilling/Alteration No Violations Noted
2141803 Primary Facility 2013-02-21 Routine/Partial Inspection No Violations Noted
2142246 Primary Facility 2013-02-25 Drilling/Alteration No Violations Noted
2143704 Primary Facility 2013-02-26 Drilling/Alteration No Violations Noted
2145399 Primary Facility 2013-03-06 Drilling/Alteration No Violations Noted
2147227 Primary Facility 2013-03-11 Drilling/Alteration No Violations Noted
2149134 Primary Facility 2013-03-19 Drilling/Alteration No Violations Noted
2169412 Primary Facility 2013-05-21 Routine/Partial Inspection No Violations Noted
2181887 Primary Facility 2013-07-03 Routine/Partial Inspection No Violations Noted
2189181 Primary Facility 2013-07-31 Routine/Complete Inspection No Violations Noted
2196311 Primary Facility 2013-08-15 Routine/Partial Inspection No Violations Noted
2209015 Primary Facility 2013-09-27 Routine/Partial Inspection No Violations Noted
2258502 Primary Facility 2014-04-01 Routine/Partial Inspection No Violations Noted
2349628 Primary Facility 2015-03-04 Routine/Partial Inspection No Violations Noted
2544142 Primary Facility 2016-12-02 Routine/Partial Inspection No Violations Noted
2565122 Primary Facility 2017-02-17 Routine/Partial Inspection No Violations Noted
2651486 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well head protected by fencing and jersey barriers. A well tag is in place. Production equipment includes GPU and a 3 tank battery, all on containment. There is a gathering pipeline header on site.

Temporary E/S controls have been removed and the PCSM plan has been implemented and the PCSM BMPs installed. Site is 100% vegetated.

While on site, I found a pile of dumped waste on the well pad. It is unknown if the operator is aware of this.

The Department requests this waste be removed ASAP and steps be taken to prevent this from happening in the future. Illegally dumped waste is a crime for those dumping it and may also be a violation of the Solid Waste Management Act for the operator if dumped on the well pad.

2840128 Primary Facility 2019-02-08 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

PCSM BMPs in place, maintained, and functioning. Site stabilized with vegetation. Snow cover at time of inspection.

For data sources see[8]

References