X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22003

Well Details

Well ID: 37-019-22003
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Donegal Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149522
Farm/Lease Name: WALTMAN A UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-12-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.926983
Longitude: -79.748547

For data sources see[1][2][3]

Well History

Date Event
2012-12-19 New Permit Application
2013-02-11 Performed Spud Operation
2013-04-02 Drilling Completion
2013-06-12 New Permit Application
2013-11-13 Perforation
2014-08-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-23 2014-05-13 5,905 3,952,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Other - (non-hazardous) NA 85 0.0274423 10273
Water 7732-18-5 15 0.00484276 1812.88
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.034339 12854.8
Other - (non-hazardous) NA 92.5 1.92507 720648
Hydrochloric Acid 7647-01-0 7.5 0.0390216 14607.7
Hydrochloric Acid 7647-01-0 7.5 0.0827259 30968.4
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short chained glycol ether 112-34-5 60 0.000645086 241.488
Formaldehyde 50-00-0 1 0.00001075 4.025
Acetophenone 98-86-2 1 0.00001075 4.025
Thiourea 62-56-6 1 0.00001075 4.025
Ethoxylated alcohol 68002-97-1 35 0.0003763 140.868
Methanol 67-56-1 5 0.00005376 20.124
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.50956 3,559,900.0
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0157172 5883.74
Other - (non-hazardous) NA 70 0.0366735 13728.7
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0031423 1176.32
Other - (non-hazardous) NA 70 0.00733204 2744.75
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0162778 6093.6
Other - (non-hazardous) NA 85 0.17404 65151.6
Hydrochloric Acid 7647-01-0 15 0.00767822 2874.34
Hydrochloric Acid 7647-01-0 15 0.00675683 2529.42
Biocide, EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000511323 191.413
Polyethylene Glycol 25322-68-3 60 0.00613587 2296.96
Other - (non-hazardous) NA 5 0.000511323 191.413
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00306794 1148.48
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.0981 32,979,500.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 138,646.00 107 0.00 0 272.61 107
2015 XTO ENERGY INC 215,071.00 352 0.00 0 565.88 173
2016 XTO ENERGY INC 143,580.00 337 0.00 0 394.81 276
2017 XTO ENERGY INC 125,996.00 365 0.00 0 364.79 365
2018 XTO ENERGY INC 109,330.51 354 19.46 30 266.55 324
2019 XTO ENERGY INC 93,648.42 358 0.00 0 275.14 358

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 2,005.98 Tons LANDFILL 100403
2013 XTO ENERGY INC Drilling Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2014 XTO ENERGY INC Produced Fluid 4,536.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 338.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 474.30 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 1,328.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 12,138.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 1,756.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 89.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 1,663.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 558.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 10,956.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 312.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Filter Socks 8.61 Tons LANDFILL 100585
2016 XTO ENERGY INC Produced Fluid 2,827.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 2,904.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 799.44 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 355.83 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 3,191.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 3,796.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 399.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 1,483.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 946.00 Bbl INJECTION DISPOSAL WELL 34-133-24096

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2138439 Primary Facility 2013-02-12 Drilling/Alteration No Violations Noted
2141424 Primary Facility 2013-02-20 Drilling/Alteration No Violations Noted
2141805 Primary Facility 2013-02-21 Routine/Partial Inspection No Violations Noted
2169411 Primary Facility 2013-05-21 Routine/Partial Inspection No Violations Noted
2181883 Primary Facility 2013-07-03 Routine/Partial Inspection No Violations Noted
2189180 Primary Facility 2013-07-31 Routine/Partial Inspection No Violations Noted
2196310 Primary Facility 2013-08-15 Routine/Partial Inspection No Violations Noted
2209013 Primary Facility 2013-09-27 Routine/Partial Inspection No Violations Noted
2258501 Primary Facility 2014-04-01 Routine/Partial Inspection No Violations Noted
2349627 Primary Facility 2015-03-04 Routine/Partial Inspection No Violations Noted
2544140 Primary Facility 2016-12-02 Routine/Partial Inspection No Violations Noted
2565121 Primary Facility 2017-02-17 Routine/Partial Inspection No Violations Noted
2651481 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well head protected by fencing and jersey barriers. A well tag is in place. Production equipment includes GPU and a 3 tank battery, all on containment. There is a gathering pipeline header on site.

Temporary E/S controls have been removed and the PCSM plan has been implemented and the PCSM BMPs installed. Site is 100% vegetated.

While on site, I found a pile of dumped waste on the well pad. It is unknown if the operator is aware of this.

The Department requests this waste be removed ASAP and steps be taken to prevent this from happening in the future, refer to picture #1. Illegally dumped waste is a crime for those dumping it and may also be a violation of the Solid Waste Management Act for the operator if dumped on the well pad.

2840124 Primary Facility 2019-02-08 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

PCSM BMPs in place, maintained, and functioning. Site stabilized with vegetation. Snow cover at time of inspection.

For data sources see[8]

References