If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21631 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.676015,"lon":-79.746348,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Buffalo Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148560 | |
Farm/Lease Name: HRANICA ET AL 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-05-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.676015 | |
Longitude: -79.746348 |
Date | Event |
---|---|
2009-05-06 | New Permit Application |
2009-09-09 | Performed Spud Operation |
2009-09-30 | Drilling Completion |
2009-10-26 | Perforation |
2010-03-04 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 26035.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 109,603.00 | 276 | 0.00 | 105 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 53,768.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 34,687.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 51,516.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 25,073.00 | 286 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 28,892.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 17,876.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 25,082.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 12,587.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 7,504.00 | 346 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 7,014.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 690.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 180.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,464.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 922.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 178.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 74.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 480.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid | 1,996.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 400.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 194.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 718.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 400.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 1,399.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | XTO ENERGY INC | Produced Fluid | 1,578.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 128.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 128.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 988.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Basic Sediment | 7.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 495.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 522.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 776.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 605.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 255.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1827251 | Primary Facility | 2009-09-10 | Drilling/Alteration | No Violations Noted | |
1828051 | Primary Facility | 2009-09-15 | Drilling/Alteration | No Violations Noted | |
1828219 | Primary Facility | 2009-09-15 | Drilling/Alteration | No Violations Noted | |
1829257 | Primary Facility | 2009-09-21 | Drilling/Alteration | No Violations Noted | |
1839338 | Primary Facility | 2009-10-29 | Drilling/Alteration | No Violations Noted | |
1839978 | Primary Facility | 2009-11-02 | Drilling/Alteration | No Violations Noted | |
1847613 | Primary Facility | 2009-12-03 | Routine/Complete Inspection | No Violations Noted | |
1932489 | Primary Facility | 2010-12-01 | Routine/Complete Inspection | No Violations Noted | Well equipped for production. Site is nearly restored. I was unable to determine if there was 70% vegetative cover due to snow cover. 2 210 barrell production fluid tanks were diked. |
1946598 | Primary Facility | 2011-01-25 | Routine/Complete Inspection | No Violations Noted | Routine Inspection of this horizontal Marcellus well. (2) 210 Barrel Production fliud tanks are diked. Pits have been reclaimed. No spills found. Well equipped for production. Separator/Dryer on-site. Some E&S BMP's are still in place. Site not yet fully restored. Ground frozen and snow covered. |
1988643 | Primary Facility | 2011-07-14 | Routine/Partial Inspection | No Violations Noted |
For data sources see[7]