37-015-23402

Well Details

Well ID: 37-015-23402
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Leroy Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 154875
Farm/Lease Name: SGL-12 M NORTH UNIT 2H
License Status:
Spud Date:
Permit Date: 2018-02-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.654267
Longitude: -76.693125

For data sources see[1][2][3]

Well History

Date Event
2018-02-07 New Permit Application
2018-06-19 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CHIEF OIL & GAS LLC 4,791,412.49 245 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHIEF OIL & GAS LLC Drill Cuttings 1,350.00 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Drilling Fluid Waste 584.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 CHIEF OIL & GAS LLC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHIEF OIL & GAS LLC Produced Fluid 570.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 16.50 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 46,708.94 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2737621 Primary Facility 2018-06-05 Preoperation Inspection No Violations Noted Site meets the requirements of § 3258. Inspection and production of materials, witnesses, depositions and rights of entry.

(a.1) Preoperation inspections.--The operator may not commence drilling activities until the department has conducted an inspection of the unconventional well site after the installation of erosion and sediment control measures. The department may conduct follow-up inspections of well sites and related activities to determine compliance with this chapter. All E&Scontrols in place. Site built to plan design. No violations noted. The pre-operational inspection is approved as of 6/5/2018.

2743920 Primary Facility 2018-06-21 Routine/Complete Inspection No Violations Noted Warm/sunny at time of inspection.

At time of inspection crews were drilling and setting conductor.

2770319 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted Weather was 75° and partly sunny at time of inspection. Met with Chief representative Jeremy Watson on location. Well was covered with a rig mat and under the catwalk at time of inspection. No violations noted at time of inspection.

For data sources see[7]