If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23372 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.593722,"lon":-76.660172,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 154478 | |
Farm/Lease Name: SGL-12 HARDY NORTH UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-09-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.593722 | |
Longitude: -76.660172 |
Date | Event |
---|---|
2017-09-07 | New Permit Application |
2018-03-02 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-08-09 | 2018-08-23 | 8,785 | 12,663,300 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unihib G | GeoSafe | Acid Inhibitor | Listed Below | ||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
BIOC11139A | Nalco Champion | Biocide | Listed Below | |||||
Unislick CST-LA | Chemplex, Solvay Grp | Friction Reducer | Listed Below | |||||
Water | 7732-18-5 | 85 | 0.15419 | 195379 | ||||
Crystallilne silica | 14808-60-7 | 100 | 16.3259 | 20,687,800.0 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 2 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 20 | 0.01356 | 17188 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02721 | 34479 | ||||
Ethanol | 64-17-5 | 5 | 0.00125 | 1583 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00125 | 1583 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00005000 | 68 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00161 | 2042 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00009000 | 117 | ||||
Water | 7732-18-5 | 40 | 0.00215 | 2722 | ||||
Copolymer of 2-Propenamide | 79-06-1 | 20 | 0.01356 | 17188 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 10 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.0025 | 3167 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.00136 | 1719 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 2 | ||||
Water | 7732-18-5 | 100 | 83.3943 | 105,675,000.0 | ||||
Water | 7732-18-5 | 80 | 0.01999 | 25335 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00136 | 1719 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 2 | ||||
Water | 7732-18-5 | 50 | 0.03391 | 42970 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00161 | 2042 | ||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
SCAL16484A | Nalco Champion | Scale Inhibitor | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | 809,504.55 | 65 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 3,961,753.66 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 12,372.59 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,568.31 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 347.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 21.49 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 360.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 32.54 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 58.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 11,199.73 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2676748 | Primary Facility | 2018-01-02 | Preoperation Inspection | No Violations Noted | Site meets the requirements of 3258. Inspection and production of materials, witnesses, depositions and rights of entry.
(a.1) Preoperation inspections.--The operator may not commence drilling activities until the department has conducted an inspection of the unconventional well site after the installation of erosion and sediment control measures. The department may conduct follow-up inspections of well sites and related activities to determine compliance with this chapter. All E&Scontrols in place. Site built to plan design. No violations noted. |
2701615 | Primary Facility | 2018-03-06 | Drilling/Alteration | No Violations Noted | Two well cellars are being built by a development crew. All removed soil and gravel being placed within roll off containers. No other equipment on location. |
2812025 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall site conditions. Two wells have recently been completed and are in flowback. Two frac tank batteries are on location within secondary containment. Most the pad surface and the surface within the secondary containments was ice-covered.
Two steel produced water tanks are present and in good condition. These sit within steel containment with spay-in liner in good condition. There was no water within this containment. Two GPUs are present within containment. The water within the containment was unfrozen and had a conductivity of less than 100 uS/cm. Two sediment traps appear to be built as permitted and functioning as designed. Compost filter sock is deployed as the E&S plan calls for. Site is stable. No E&S issues noted. No violations noted. |
For data sources see[8]