X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-23346

Well Details

Well ID: 37-015-23346
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 154343
Farm/Lease Name: L. KINGSLEY NE UNIT
License Status:
Spud Date:
Permit Date: 2017-07-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.596833
Longitude: -76.581306

For data sources see[1][2][3]

Well History

Date Event
2017-07-17 New Permit Application
2017-12-02 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-21 2018-10-14 8,986 13,650,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislick CST-LA Chemples, Solvay Group Friciton Reducer Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
BIOC11139A Nalco Champion Biocide Listed Below
Sand Sargent/Unimin Proppant Listed Below
SCAL16484A Nalco Champion Scale Inhibitor Listed Below
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00005000 67
Oleic acid diethanolamide 93-83-4 2 0.00127 1731
Glutaraldehyde 111-30-8 5 0.00121 1638
Water 7732-18-5 100 83.7931 113,910,000.0
Water 7732-18-5 50 0.03183 43270
Crystallilne silica 14808-60-7 100 15.9476 21,679,500.0
Ethanol 64-17-5 5 0.00121 1638
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00127 1731
Formaldehyde 50-00-0 1 0.00001000 2
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00008000 115
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00153 2087
Quaternary ammonium compound 68424-85-1 10 0.00241 3276
Ethylene glycol 107-21-1 30 0.00153 2087
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.01273 17308
Methanol 67-56-1 5 0.00001000 10
Copolymer of 2-propenamide 79-06-1 20 0.01273 17308
Hydrochloric acid 7647-01-0 15 0.02494 33899
Acetophenone 98-86-2 1 0.00001000 2
Water 7732-18-5 40 0.00205 2782
Water 7732-18-5 80 0.01928 26210
Water 7732-18-5 85 0.1413 192092
Thiourea 62-56-6 1 0.00001000 2
Unihib G GeoSafe Acid Inhibitor Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 625,024.65 42 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 4,509,088.37 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHIEF OIL & GAS LLC Drill Cuttings 1,292.61 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials 3.59 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Produced Fluid 7,258.27 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Drilling Fluid Waste 639.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHIEF OIL & GAS LLC Produced Fluid 270.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 13.02 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 19,728.48 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2670514 Primary Facility 2017-12-12 Drilling/Alteration No Violations Noted Drilling of the well cellars underway. Drill cuttings being disposed of in roll off container. Drilling performed by Halliburton. No violations noted. Location snow covered.
2696143 Primary Facility 2018-02-20 Drilling/Alteration No Violations Noted Arrived @ 12:00. Weather: warm, T¿s in 40¿s. Precision 569 on site and beginning surface hole drilling on the L. Kingsley SE 4H during my inspection. Met with Ty Merreighn (company man), also onsite were Trey Villaneuve and Paul Ricco (drilling co-superintendent). Chief is employing batch drilling on this location and using the FMC DTO 30 wellhead system. Halliburton conducted the surface casing cement job on the SE2H during my inspection. The surface casing for the SE 3H had been previously cemented.
2699941 Primary Facility 2018-02-28 Drilling/Alteration No Violations Noted Arrived @ 12:00. Weather: warm, overcast. Precision 569 on site and drilling intermediate hole on the L. Kingsley SW 1H. 8 surface holes were finished and 3 intermediate holes cased. Met with Jeremy Boyd (company man). Reviewed 3 surface casing CBLs which showed no abnormalities. Discussed temperature of cement water. Chief is employing batch drilling on this location and using the FMC DTO 30 wellhead system. The order of work is to drill and case, then move the rig and start drilling the adjacent hole while cementing the just-cased wellbore.
2706768 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted I met Ty Marine when I arrived. Precision rig #569 on location, drilling at 6231' on the SW 2H well. 1-3" of snow on the site; snow on rig mats had been shoveled into piles on containment. Overall, site looked good, with containment berms in good condition and good housekeeping. Chemical storage area was neat and clean. I did note 4 vac boxes that had been set off of containment; a small (8' x 4') duck pond had been placed under the end that opens, but these had been buckled and folded under the vac boxes. When I mentioned it to Ty, he said that the boxes were empty, but that he had already called the company that had dropped them off, and they would be returning on Friday to re-set them.
2715346 Primary Facility 2018-03-29 Drilling/Alteration No Violations Noted Arrived @ 10:43 with Ulyana Trynovich (DEP OGI)Weather: overcast, foggy. Precision 569 on site at 3000' on the SE 3H. Met with Jeremy Boyd (company man). Reviewed several intermediate casing CBLs. There appeared to be decreased bond quality at approximately 750', based on a quick review. Requested electronic copies from Peg Farrell (Chief) for further review. Cement sample cups did not appear to be labelled. We agreed to label them consistently. Reviewed BOP test conducted on 3/21/18. Discussed level of detail in drillers log and noted that vertical section was logged. NW 2H from 100' to 1521', and SW1H from 1546' to 8640' MD. Also discussed changes in CBL timing. No violations were observed during this inspection.
2732773 Primary Facility 2018-05-22 Drilling/Alteration No Violations Noted Arrived @ 10:50. Weather: rain. Precision 569 on site at 16663' on the NE3H. Met with Jeremy Boyd (company man). Operations going well. Should skid over to last well on Friday. No violations were observed during this inspection.
2769765 Primary Facility 2018-08-31 Routine/Complete Inspection No Violations Noted Eight wells drilled in track and ready for production. Eight GPU installed within containment. The well supply and dump lines are being installed at this time. Heavy equipment onsite digging trenches for the pipe installation.
2811983 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted I met Greg Rohrer, Chief company man, when I arrived. Flowback operations were in progress, with temporary sand separators and GPUs hooked up and gas flowing to sales. Overall containment appeared to be in good condition, with the exception of the foam berm between the permanent GPUs and temporary ones; in what was obviously a high traffic area, the berm had been crushed. The containment volume for this area may still have been more than adequate, as only pass-through equipment was located on the containment, but I pointed it out to Greg anyway. I noted a 10'x12' puddle on the pad that showed slightly elevated conductance (2.88mS/cm) between the temporary GPUs and the Baker tank battery containment. A vac truck was pumping out the Baker tanks in this area, and Greg told me he would have the area vacced ASAP.

For data sources see[8]

References