37-015-23339

Well Details

Well ID: 37-015-23339
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Leroy Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 154300
Farm/Lease Name: SGL-12 D WEST UNIT
License Status:
Spud Date:
Permit Date: 2017-06-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.590494
Longitude: -76.717828

For data sources see[1][2][3]

Well History

Date Event
2017-06-26 New Permit Application
2017-10-23 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-19 2018-06-29 8,799 12,521,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislick CST-LA Chemplix, Solvay Group Friction Reducer Listed Below
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00146 1804
Oleic acid diethanolamide 93-83-4 2 0.00146 1804
Thiourea 62-56-6 1 0.00001000 2
Hydrochloric acid 7647-01-0 15 0.02596 32087
Water 7732-18-5 85 0.14708 181827
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00005000 64
Water 7732-18-5 100 84.5228 104,489,000.0
Methanol 67-56-1 5 0.00001000 9
Water 7732-18-5 40 0.00217 2688
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.0146 18043
Formaldehyde 50-00-0 1 0.00001000 2
Water 7732-18-5 80 0.02034 25142
Crystallilne silica 14808-60-7 100 15.2002 18,790,900.0
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00009000 109
Copolymer of 2-Propenamide 79-06-1 20 0.0146 18043
Ethanol 64-17-5 5 0.00127 1571
Glutaraldehyde 111-30-8 5 0.00127 1571
Quaternary ammonium compound 68424-85-1 10 0.00254 3143
Ethylene glycol 107-21-1 30 0.00163 2016
Water 7732-18-5 50 0.03649 45107
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00163 2016
Acetophenone 98-86-2 1 0.00001000 2
Sand Sargent/Unimin Proppant Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
Water Chief Oil & Gas Garier/Base Fluid Listed Below
BIOC11139A Nalco Champion Biocide Listed Below
SCAL16484A Nalco Champion Scale Inhibitor Listed Below
Unihib G GeoSafe Acid Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,178,726.31 151 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 980,586.26 349 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CHIEF OIL & GAS LLC Drill Cuttings 1,467.16 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Drill Cuttings 75.08 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Produced Fluid 13,545.07 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Drilling Fluid Waste 731.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials 10.55 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 2.35 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 8,372.04 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2643588 Primary Facility 2017-10-04 Preoperation Inspection No Violations Noted Site meets the requirements of A 3258. Inspection and production of materials, witnesses, depositions and rights of entry.

(a.1) Preoperation inspections.--The operator may not commence drilling activities until the department has conducted an inspection of the unconventional well site after the installation of erosion and sediment control measures. The department may conduct follow-up inspections of well sites and related activities to determine compliance with this chapter. All E&Scontrols in place. Site built to plan design. No violations noted. Site approved for drilling activities.

2677374 Primary Facility 2018-01-03 Drilling/Alteration No Violations Noted No issues as of time of inspection.

Cold windy at time of inspection.

2687396 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted I met Trey Villareal of Chief when I arrived onsite. H&P rig 513 on location at 2970' on the 3H well. Crews were cleaning ice and snow out of containment. I noted a section of berm near the mud logging trailer where the lock and key style berm was not run straight, but made a s-curve instead; in this area, there were several spots where the berm sections did not meet fully, and the liner was sagging between them. Near the cuttings backyard, I noted several spots where the liner on the berm was torn, likely from vehicular traffic in the area. I then met Aaron Stredny, Environmental Specialist for Chief, and pointed out the containment issues I had noted to him. Aaron took pictures of the aforementioned areas, and we spoke for a few minutes regarding solutions for this and other issues that we had noted on other locations. I informed Trey of my findings as well before I departed.
2734595 Primary Facility 2018-05-25 Routine/Complete Inspection No Violations Noted Six wells drilled. Site being staged for frack.
2747274 Primary Facility 2018-06-29 Drilling/Alteration No Violations Noted 4h and 1h wells being fracked.

No rig matting on location. Only polyurethane and felt liner.

No leaks detected. A small hole in the secondary containment was noted, but was marked by the operator for repair.

2762531 Primary Facility 2018-08-08 Incident- Response to Accident or Event No Violations Noted I spoke with Chief's Environmental Inspector, Aaron Stredny, who is guiding the cleanup of flowback that sprayed out of a gas buster trailer (photo 1). He said they started flowing back the six Marcellus Shale wells last Saturday (4 days ago), and that the gasbuster overflowed last night.

There was just enough liquid in the excavated area (photo 1) for me to get an electrical conductivity (EC) reading with an Oakton PCSTestr 35; it was 1.1 mS/cm. From puddles on the rest of the pad, the highest EC reading I got was 0.50 mS/cm. 78.56a is cited to the 015-23364 permit. The violation is considered immediately corrected. JLP

2813381 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. Two frac tank batteries are on location within secondary containment. No problems with the containments were noted. Unlabeled containers are present near the well heads. The department recommends labeling these containers.

Six steel produced water tanks are present and in good condition. These sit within steel containment with spay-in liner in good condition. The water was frozen within this containment. Six GPUs are present within containment. The water within the containment was unfrozen and had a conductivity of less than 100 uS/cm.

Two sediment traps appear to be built as permitted and functioning as designed. Compost filter sock is deployed as the E&S plan calls for. Site is stable. No E&S issues noted.

No violations noted.

For data sources see[8]