Well Details

Well ID: 37-015-23079
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151414
Farm/Lease Name: SGL 12 A UNIT
License Status: Active
Spud Date:
Permit Date: 2014-06-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.590989
Longitude: -76.675061

For data sources see[1][2][3]

Well History

Date Event
2014-06-13 New Permit Application
2015-01-01 Performed Spud Operation
2015-03-31 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-17 2016-04-28 8,829 13,038,100

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bactron K-139 Nalco Champion Biocide Quarternary Ammonium Compounds 68424-85-1 10 0.00249 3194
Ethanol 64-17-5 5 0.00125 1597
Water 7732-18-5 80 0.01994 25549
Gluteraldehyde 111-30-8 5 0.00125 1597
Sand Sargent/Unimin Proppant Silica Substrate 14808-60-7 100 15.0367 19,265,300.0
Water Chief Oil & Gas Base Fluid Water 7732-18-5 100 84.7415 108,573,000.0
Unislick ST-50 CESI Chemical Friction Reducer Ammonium acetate 631-61-8 13 0.00876 11224
Water 7732-18-5 42 0.0283 36264
Petroleum distillates, hydrotreated light 64742-47-8 30 0.02022 25903
Alcohols, ethoxylated 68002-97-1 5 0.00337 4317
Alcohols, ethoxylated 68551-12-2 5 0.00337 4317
Alcohols, ethoxylated 68439-50-9 5 0.00337 4317
EC6486A Nalco Champion Scale Inhibitor Triethanolamine Tri 68171-29-9 30 0.00162 2071
Water 7732-18-5 40 0.00215 2761
Ethylene Glycol 107-21-1 30 0.00162 2071
Hydrochloric Acid (15%) PVS Acidizing Hydrochloric Acid 7647-01-0 15 0.01858 23804
Water 7732-18-5 85 0.10528 134890
Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00001000 7
Short Chained Glycol Ether 112-34-5 60 0.00006000 79
Ethoxylated alcohol 68002-97-1 35 0.00004000 46
Acetophenone 98-86-2 1 0.00000100 1
Thiourea 62-56-6 1 0.00000100 1
Formaldehyde 50-00-0 1 0.00000100 1

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 637,418.17 207 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 670,676.22 332 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 578,999.40 363 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 472,917.02 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 440.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CHIEF OIL & GAS LLC Drill Cuttings 1,677.11 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 3,617.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 300.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 17,932.98 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 41,980.86 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 2,309.61 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 7,364.66 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 7,211.39 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 8,303.25 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296693 Primary Facility 2014-08-15 Routine/Complete Inspection No Violations Noted
2339387 Primary Facility 2015-01-28 Routine/Complete Inspection No Violations Noted
2345885 Primary Facility 2015-02-18 Routine/Complete Inspection No Violations Noted
2349087 Primary Facility 2015-02-18 Drilling/Alteration No Violations Noted
2362975 Primary Facility 2015-04-16 Drilling/Alteration No Violations Noted
2369585 Primary Facility 2015-05-08 Routine/Complete Inspection No Violations Noted
2371400 Primary Facility 2015-05-19 Routine/Complete Inspection No Violations Noted Arrived on site at 14:45 and departed at 13:45. Weather conditions were sunny and ~80°F. I spoke with Mr. Billy Swanson of Chief and was accompanied by a representative of Orion Well Drilling.
2377402 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted
2386904 Primary Facility 2015-07-06 Routine/Complete Inspection No Violations Noted Arrived @13:10 in the rain. Maintenance on the access road was ongoing at the time of my inspection. The Orion 15 rig was onsite. Met with Company Man Trey Villeneuve. At the 4H well, (015-23079) Orion 15 was preparing to drill out the floats previously set at 1928’ and drill deeper, with an estimated 3 to 4 days to KOP. After TD’ing the 4H, Orion 15 plans to TD the 6H.
2400811 Primary Facility 2015-08-20 Incident- Response to Accident or Event No Violations Noted
2482985 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted
2492300 Primary Facility 2016-06-09 Routine/Complete Inspection No Violations Noted
2502576 Primary Facility 2016-07-06 Routine/Complete Inspection No Violations Noted
2511317 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted Arrived @ 13:00. Weather: hot, humid, rain off and on. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. At the time of my inspection, flow back operations had been completed. Oil States staff were onsite monitoring a sand separator and heating unit that were staged near the well head so that high initial pressure could be dropped back and sent to the production units on site. As a consequence, the SGL12A 5H well was still covered by containment, so it was not possible conduct an inspection. The status of the other wells on location was as follows:

SGL 12 A 1H – shut in SGL 12A 4H – in production SGL 12 A 2H in production SGL12A 5H – covered by containment SGL 12 A 3H in production SGL 12A 6H – in production. Left location at 14:00.

2531453 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted Arrived @ 9:00. Weather: cool, sunny. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. This inspection could not be completed at this time because Oil States staff were still using a heating unit on the 6H and the 5H was still covered by containment. The status of the other wells on location was as follows:

SGL 12 A 1H, shut-in,not producing. Gravel and water in cellar, no bubbling. 9-5/8” x 5-1/2”: 1200 psi (analog gauge) –queried this with Jon Hafer. SGL 12A 3H, in production, 5-1/2”: 1100 psi (0-5000) SGL 12A 4H, in production, 5-1/2” 900 psi SGL 12A 5H, covered by containment SGL 12A 6H, Top gauge: 2125 psi (0-5000, analog), 5-1/2” 2125 psi. There were no violations noted at the time of this inspection. Left location @ 11:15

2552276 Primary Facility 2017-01-13 Routine/Complete Inspection No Violations Noted Five wells in production stage. One will drilled but not in production. Four water separator's appear to be in use and within containment. Four production tanks within containment. No violations noted.

Note: See the 6H inspection for photos.

2559088 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted Arrived @ 10:00. Weather: cold, snowing. Met with Jon Hafer (Chief) to conduct inspections for Inactive Status Applications for the SGL 12A 5H and 1H. Observed Hafer as he monitored annular vents for combustible gas (Multirae meter calibrated 1/31/17).

SGL 12A 1H, drilled to total depth, gravel in cellar. 13-3/8” x 9-5/8”: 0.3% methane 9-5/8” x 5-1/2”: 100% methane SGL 12A 5H: to, top-holed to 1953’ 13-3/8” x 9-5/8”: no methane detected 9-5/8”: no methane detected. SGL 12A 2H, SGL 12 A 3H, SGL 12A 4H, SGL 12A 6H are in production. Left @ 11:30. No violations observed during this inspection. Approval of the Inactive Status Applications is recommended.

2747148 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Above ground fresh water storage tanks in use on location. No violations noted.
2813340 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. There are 5 well heads. Four of the wells are stages for production. Well tag for the 5H well has fallen off of the well head. An unlabeled container is present near the well heads. The department recommends labeling the container.

Four steel produced water tanks are present and in good condition. These sit within steel containment with spay-in liner in good condition. The water in the containment was frozen at the time of inspection. Four GPUs are present within containment. The water within the containment was unfrozen and had a conductivity of less than 100 uS/cm.

Two infiltration areas appear to be built as permitted and functioning as designed. Site is stable. No E&S issues noted.

No violations noted.

For data sources see[8]