37-015-23077

Well Details

Well ID: 37-015-23077
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151414
Farm/Lease Name: SGL 12 A UNIT
License Status: Active
Spud Date:
Permit Date: 2014-06-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.590975
Longitude: -76.675169

For data sources see[1][2][3]

Well History

Date Event
2014-06-12 New Permit Application
2015-01-02 Performed Spud Operation
2016-05-01 Perforation
2016-05-01 Performed Stage 1 of Stimulation
2016-05-01 Performed Stage 2 of Stimulation
2016-05-01 Performed Stage 3 of Stimulation
2016-05-02 Perforation
2016-05-02 Performed Stage 4 of Stimulation
2016-05-02 Performed Stage 5 of Stimulation
2016-05-02 Performed Stage 6 of Stimulation
2016-05-02 Performed Stage 7 of Stimulation
2016-05-03 Perforation
2016-05-03 Performed Stage 10 of Stimulation
2016-05-03 Performed Stage 11 of Stimulation
2016-05-03 Performed Stage 8 of Stimulation
2016-05-03 Performed Stage 9 of Stimulation
2016-05-04 Perforation
2016-05-04 Performed Stage 12 of Stimulation
2016-05-04 Performed Stage 13 of Stimulation
2016-05-04 Performed Stage 14 of Stimulation
2016-05-05 Perforation
2016-05-05 Performed Stage 15 of Stimulation
2016-05-05 Performed Stage 16 of Stimulation
2016-05-05 Performed Stage 17 of Stimulation
2016-05-05 Performed Stage 18 of Stimulation
2016-05-06 Perforation
2016-05-06 Performed Stage 19 of Stimulation
2016-05-06 Performed Stage 20 of Stimulation
2016-05-06 Performed Stage 21 of Stimulation
2016-05-07 Performed Stage 22 of Stimulation
2016-05-08 Perforation
2016-05-08 Performed Stage 23 of Stimulation
2016-05-08 Performed Stage 24 of Stimulation
2016-05-08 Performed Stage 25 of Stimulation
2016-05-08 Performed Stage 26 of Stimulation
2016-05-08 Performed Stage 27 of Stimulation
2016-08-16 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-01 2016-05-08 9,031 10,935,900

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486A Nalco Champion Scale Inhibitor Triethanolamine Tri 68171-29-9 30 0.002 1731
Water 7732-18-5 40 0.002 2308
Ethylene Glycol 107-21-1 30 0.002 1731
Water Chief Oil & Gas Base Fluid Water 7732-18-5 100 84.68 91,126,700.0
Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000100 1
Thiourea 62-56-6 1 0.00000100 1
Short Chained Glycol Ether 112-34-5 60 0.00007000 73
Methanol 67-56-1 5 0.00001000 6
Acetophenone 98-86-2 1 0.00000100 1
Ethoxylated alcohol 68002-97-1 35 0.00004000 43
Unislick ST-50 CESI Chemical Friction Reducer Water 7732-18-5 42 0.03 30869
Alcohols, ethoxylated 68002-97-1 5 0.003 3675
Alcohols, ethoxylated 68439-50-9 5 0.003 3675
Ammonium acetate 631-61-8 13 0.009 9555
Petroleum distillates, hydrotreated light 64742-47-8 30 0.02 22049
Alcohols, ethoxylated 68551-12-2 5 0.003 3675
Bactron K-139 Nalco Champion Biocide Water 7732-18-5 80 0.02 21457
Quarternary Ammonium Compounds 68424-85-1 10 0.002 2682
Gluteraldehyde 111-30-8 5 0.001 1341
Ethanol 64-17-5 5 0.001 1341
Sand Sargent/Unimin Proppant Silica Substrate 14808-60-7 100 15.09 16,240,500.0
Hydrochloric Acid (15%) PVS Acidizing Water 7732-18-5 85 0.11 122594
Hydrochloric Acid 7647-01-0 15 0.02 21634

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-05-01 1 Sand 1,640,388 9,040 9,521
2016-05-01 2 Sand 1,640,388 9,081 9,781
2016-05-01 3 Sand 1,640,388 8,992 9,577
2016-05-02 4 Sand 1,640,388 8,898 9,721
2016-05-02 5 Sand 1,640,388 8,842 9,657
2016-05-02 6 Sand 1,640,388 8,782 9,710
2016-05-02 7 Sand 1,640,388 8,939 9,681
2016-05-03 8 Sand 1,640,388 8,787 9,771
2016-05-03 9 Sand 1,640,388 8,576 9,585
2016-05-03 10 Sand 1,640,388 8,657 9,469
2016-05-03 11 Sand 1,640,388 8,878 9,203
2016-05-04 12 Sand 1,640,388 8,752 9,240
2016-05-04 13 Sand 1,640,388 8,781 9,535
2016-05-04 14 Sand 1,640,388 8,725 9,172
2016-05-05 15 Sand 1,640,388 8,523 9,288
2016-05-05 16 Sand 1,640,388 8,387 9,838
2016-05-05 17 Sand 1,640,388 8,422 9,600
2016-05-05 18 Sand 1,640,388 8,570 9,539
2016-05-06 19 Sand 1,640,388 7,684 8,925
2016-05-06 20 Sand 1,640,388 7,928 8,567
2016-05-06 21 Sand 1,640,388 8,668 9,001
2016-05-07 22 Sand 1,640,388 8,375 8,980
2016-05-08 23 Sand 1,640,388 8,161 9,182
2016-05-08 24 Sand 1,640,388 7,946 9,310
2016-05-08 25 Sand 1,640,388 7,482 9,277
2016-05-08 26 Sand 1,640,388 7,356 9,394
2016-05-08 27 Sand 1,640,388 7,830 9,004

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 873,378.23 208 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 897,159.05 349 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 700,806.99 363 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 592,359.11 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHIEF OIL & GAS LLC Drill Cuttings 1,804.65 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 433.81 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 2,392.43 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 300.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste 14,726.40 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 29,095.20 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 885.16 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 3,507.86 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 3,055.94 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 3,992.67 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296690 Primary Facility 2014-08-15 Routine/Complete Inspection No Violations Noted
2339385 Primary Facility 2015-01-28 Routine/Complete Inspection No Violations Noted
2345882 Primary Facility 2015-02-18 Routine/Complete Inspection No Violations Noted
2349084 Primary Facility 2015-02-18 Drilling/Alteration No Violations Noted
2362970 Primary Facility 2015-04-16 Drilling/Alteration No Violations Noted
2369580 Primary Facility 2015-05-08 Routine/Complete Inspection No Violations Noted
2371398 Primary Facility 2015-05-19 Routine/Complete Inspection No Violations Noted Arrived on site at 14:45 and departed at 13:45. Weather conditions were sunny and ~80°F. I spoke with Mr. Billy Swanson of Chief and was accompanied by a representative of Orion Well Drilling.
2377398 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted
2386901 Primary Facility 2015-07-06 Routine/Complete Inspection No Violations Noted Arrived @13:10 in the rain. Maintenance on the access road was ongoing at the time of my inspection. The Orion 15 rig was onsite. Met with Company Man Trey Villeneuve. At the 4H well, (015-23079) Orion 15 was preparing to drill out the floats previously set at 1928’ and drill deeper, with an estimated 3 to 4 days to KOP. After TD’ing the 4H, Orion 15 plans to TD the 6H.
2400818 Primary Facility 2015-08-20 Incident- Response to Accident or Event No Violations Noted
2446455 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted
2482983 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted
2492295 Primary Facility 2016-06-09 Routine/Complete Inspection No Violations Noted
2502565 Primary Facility 2016-07-06 Routine/Complete Inspection No Violations Noted : Arrived @ 13:20. Weather: sunny, warm. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. At the time of my inspection, Oil States representatives were onsite overseeing flowback operations. Oil States representative Larry Patrick informed me that operations would most likely require a few more weeks. The SGL12A 5H well was covered by containment, so it was not possible conduct an inspection. Left location at 14:20.
2511310 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted Arrived @ 13:00. Weather: hot, humid, rain off and on. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. At the time of my inspection, flow back operations had been completed. Oil States staff were onsite monitoring a sand separator and heating unit that were staged near the well head so that high initial pressure could be dropped back and sent to the production units on site. As a consequence, the SGL12A 5H well was still covered by containment, so it was not possible conduct an inspection. The status of the other wells on location was as follows:

SGL 12 A 1H – shut in SGL 12A 4H – in production SGL 12 A 2H in production SGL12A 5H – covered by containment SGL 12 A 3H in production SGL 12A 6H – in production. Left location at 14:00.

2531431 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted Arrived @ 9:00. Weather: cool, sunny. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. This inspection could not be completed at this time because Oil States staff were still using a heating unit on the 6H and the 5H was still covered by containment. The status of the other wells on location was as follows:

SGL 12 A 1H, shut-in,not producing. Gravel and water in cellar, no bubbling. 9-5/8” x 5-1/2”: 1200 psi (analog gauge) –queried this with Jon Hafer. SGL 12A 3H, in production, 5-1/2”: 1100 psi (0-5000) SGL 12A 4H, in production, 5-1/2” 900 psi SGL 12A 5H, covered by containment SGL 12A 6H, Top gauge: 2125 psi (0-5000, analog), 5-1/2” 2125 psi. There were no violations noted at the time of this inspection. Left location @ 11:15

2552280 Primary Facility 2017-01-13 Routine/Complete Inspection No Violations Noted Five wells in production stage. One will drilled but not in production. Four water separator's appear to be in use and within containment. Four production tanks within containment. No violations noted.

Note: See the 6H inspection for photos.

2559026 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted Arrived @ 10:00. Weather: cold, snowing. Met with Jon Hafer (Chief) to conduct inspections for Inactive Status Applications for the SGL 12A 5H and 1H. Observed Hafer as he monitored annular vents for combustible gas (Multirae meter calibrated 1/31/17).

SGL 12A 1H, drilled to total depth, gravel in cellar. 13-3/8” x 9-5/8”: 0.3% methane 9-5/8” x 5-1/2”: 100% methane SGL 12A 5H: to, top-holed to 1953’ 13-3/8” x 9-5/8”: no methane detected 9-5/8”: no methane detected. SGL 12A 2H, SGL 12 A 3H, SGL 12A 4H, SGL 12A 6H are in production. Left @ 11:30. No violations observed during this inspection. Approval of the Inactive Status Applications is recommended.

2747140 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Above ground fresh water storage tanks in use on location. No violations noted.
2813321 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. There are 5 well heads. Four of the wells are stages for production. Well tag for the 5H well has fallen off of the well head. An unlabeled container is present near the well heads. The department recommends labeling the container.

Four steel produced water tanks are present and in good condition. These sit within steel containment with spay-in liner in good condition. The water in the containment was frozen at the time of inspection. Four GPUs are present within containment. The water within the containment was unfrozen and had a conductivity of less than 100 uS/cm.

Two infiltration areas appear to be built as permitted and functioning as designed. Site is stable. No E&S issues noted.

No violations noted.

For data sources see[9]