X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22781

Well Details

Well ID: 37-015-22781
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Monroe Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 150567
Farm/Lease Name: KINGSLEY UNIT A
License Status: Active
Spud Date:
Permit Date: 2013-11-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625589
Longitude: -76.476621

For data sources see[1][2][3]

Well History

Date Event
2013-11-18 New Permit Application
2014-01-22 Performed Spud Operation
2014-08-18 Perforation
2014-08-18 Performed Stage 1 of Stimulation
2014-08-18 Performed Stage 2 of Stimulation
2014-08-19 Perforation
2014-08-19 Performed Stage 3 of Stimulation
2014-08-19 Performed Stage 4 of Stimulation
2014-08-19 Performed Stage 5 of Stimulation
2014-08-20 Perforation
2014-08-20 Performed Stage 6 of Stimulation
2014-08-20 Performed Stage 7 of Stimulation
2014-08-20 Performed Stage 8 of Stimulation
2014-08-21 Perforation
2014-08-21 Performed Stage 10 of Stimulation
2014-08-21 Performed Stage 11 of Stimulation
2014-08-21 Performed Stage 9 of Stimulation
2014-08-22 Perforation
2014-08-22 Performed Stage 12 of Stimulation
2014-08-22 Performed Stage 13 of Stimulation
2014-08-22 Performed Stage 14 of Stimulation
2014-08-23 Perforation
2014-08-23 Performed Stage 15 of Stimulation
2014-08-23 Performed Stage 16 of Stimulation
2014-08-23 Performed Stage 17 of Stimulation
2014-08-23 Performed Stage 18 of Stimulation
2014-08-24 Perforation
2014-08-24 Performed Stage 19 of Stimulation
2014-08-24 Performed Stage 20 of Stimulation
2014-08-24 Performed Stage 21 of Stimulation
2014-08-25 Perforation
2014-08-25 Performed Stage 22 of Stimulation
2014-08-25 Performed Stage 23 of Stimulation
2014-08-25 Performed Stage 24 of Stimulation
2014-08-26 Perforation
2014-08-26 Performed Stage 25 of Stimulation
2014-08-26 Performed Stage 26 of Stimulation
2014-08-26 Performed Stage 27 of Stimulation
2014-08-27 Perforation
2014-08-27 Performed Stage 28 of Stimulation
2014-08-27 Performed Stage 29 of Stimulation
2014-08-27 Performed Stage 30 of Stimulation
2019-02-14 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-18 2014-08-27 9,010 10,755,800

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bactron K-139 Champion Technologies Biocide Glutaraldehyde 111-30-8 5 0.002 0
Quaternary ammonium compounds,
benzyl-C-12-16 alkyldimethyl, chlorides
68424-85-1 10 0.003 0
Ethanol 64-17-5 5 0.002 0
Gyptron T-390 Champion Technologies Scale Inhibitor Methanol 67-56-1 10 0.001 0
Hydrochloric Acid Universal Acid Hydrochloric Acid 7647-01-0 37 0.1 0
Unislik ST 50 Universal Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.02 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.9 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-08-18 1 Sand 10,235,190 7,670 8,922
2014-08-18 2 Sand 10,235,190 8,114 8,686
2014-08-19 3 Sand 10,235,190 8,276 8,973
2014-08-19 4 Sand 10,235,190 7,992 8,740
2014-08-19 5 Sand 10,235,190 7,829 9,198
2014-08-20 6 Sand 10,235,190 8,167 8,794
2014-08-20 7 Sand 10,235,190 8,087 8,612
2014-08-20 8 Sand 10,235,190 8,015 8,620
2014-08-21 9 Sand 10,235,190 8,190 8,702
2014-08-21 10 Sand 10,235,190 8,172 8,587
2014-08-21 11 Sand 10,235,190 7,973 8,680
2014-08-22 12 Sand 10,235,190 7,996 8,715
2014-08-22 13 Sand 10,235,190 7,707 8,494
2014-08-22 14 Sand 10,235,190 7,871 8,814
2014-08-23 15 Sand 10,235,190 7,751 8,762
2014-08-23 16 Sand 10,235,190 8,078 8,699
2014-08-23 17 Sand 10,235,190 7,400 9,021
2014-08-23 18 Sand 10,235,190 7,284 8,821
2014-08-24 19 Sand 10,235,190 8,054 8,860
2014-08-24 20 Sand 10,235,190 7,789 8,658
2014-08-24 21 Sand 10,235,190 7,871 8,684
2014-08-25 22 Sand 10,235,190 7,382 8,844
2014-08-25 23 Sand 10,235,190 7,849 8,742
2014-08-25 24 Sand 10,235,190 7,513 8,902
2014-08-26 25 Sand 10,235,190 7,402 8,380
2014-08-26 26 Sand 10,235,190 7,268 8,746
2014-08-26 27 Sand 10,235,190 7,710 8,651
2014-08-27 28 Sand 10,235,190 7,468 8,864
2014-08-27 29 Sand 10,235,190 6,935 8,707
2014-08-27 30 Sand 10,235,190 6,828 9,043

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 1,050,559.00 102 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 3,600,773.09 360 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,762,891.44 267 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,827,310.87 362 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,094,420.79 361 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,065,131.22 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 162.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 175.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drill Cuttings 609.56 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,396.62 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 635.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 6,497.36 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drill Cuttings 363.10 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Produced Fluid 10,292.02 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 2,150.62 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 1,829.29 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 219.18 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 778.02 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 708.44 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2241290 Primary Facility 2014-01-31 Routine/Complete Inspection No Violations Noted
2478772 Primary Facility 2016-04-26 Routine/Complete Inspection No Violations Noted
2486005 Primary Facility 2016-05-17 Site Restoration No Violations Noted
2563438 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted
2602514 Primary Facility 2017-06-08 Routine/Complete Inspection No Violations Noted Three wells in production status. One well not in production. Three water separators within containment. No leaks detected from production equipment. Petroleum substance within 2H Well celler. No violations cited at this time.
2717033 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted Arrived at 11:00 with Jon Hafer to conduct inspection for regulatory inactive well status extension request. This is the second extension request for this well. The 9-5/8" x 5-1/2" annulus was open and vented to a 550- gallon polytank where no methane was detected. The 20" x 13-3/8" and 13-3/8" x 9-5/8" annuli could not be observed because the cellar was filled with gravel. Requested a follow- up inspection with the cellar vacced out to observe these annuli. The three other wells onsite were in production. No violations were observed at the time of this inspection.
2789050 Primary Facility 2018-10-12 Routine/Complete Inspection No Violations Noted Three wells are staged for production. Well cellars are filled with pea gravel. Three GPUs are present within felt and plastic containment. Three steel produced water tanks are present and in good condition. Steel containment with spray-in liner is present and in good condition. Approximately one foot of water are present within containment. The conductivity here was 29.9 uS/cm.

The majority of the pad surface has been restored and is well-vegetated with greater than 70% vegetation. A gravel path exists to the well heads, produced water tanks, and GPUs. Temporary BMPs have been removed. Pad side slopes and topsoil stockpile are well-vegetated with greater than 70% vegetation as well.

Site is stable.

No violations noted.

For data sources see[9]

References