X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22706

Well Details

Well ID: 37-015-22706
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Monroe Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 148286
Farm/Lease Name: ELLIOT UNIT B 5H
License Status:
Spud Date:
Permit Date: 2013-08-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.706425
Longitude: -76.421473

For data sources see[1][2][3]

Well History

Date Event
2013-08-08 New Permit Application
2013-09-26 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-05 2014-06-14 7,326 10,258,000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bactron K-139 Champion Technologies Biocide Glutaraldehyde 111-30-8 5 0.002 0
Quaternary ammonium compounds,
benzyl-C-12-16 alkyldimethyl, chlorides
68424-85-1 10 0.004 0
Ethanol 64-17-5 5 0.002 0
Gyptron T-390 Champion Technologies Scale Inhibitor Methanol 67-56-1 10 0.001 0
Unislik ST 50 Universal Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.02 0
Hydrochloric Acid Universal Acid Hydrochloric Acid 7647-01-0 37 0.1 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.9 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 534,122.00 152 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 1,228,156.08 353 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 938,340.88 343 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 692,304.61 340 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 618,446.83 362 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 591,565.16 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drill Cuttings 128.50 Tons LANDFILL 301358
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 855.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,291.35 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 108.15 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,756.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Produced Fluid 14,971.49 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drill Cuttings 53.71 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Produced Fluid 4,793.55 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Produced Fluid 1,739.46 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 33.59 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 241.85 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 564.36 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 268.12 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2218075 Primary Facility 2013-10-30 Drilling/Alteration No Violations Noted First Class Drilling, Comp. Man - Manuel Olmos, @ 4415'
2218179 Primary Facility 2013-10-25 Drilling/Alteration Pending first class Energy, Comp Man - Johnny Foller- not here, talked to tool pusher, @ 1811'
2227099 Primary Facility 2013-12-05 Drilling/Alteration No Violations Noted Rig has moved out. Cellar has 1' of water - no bubbles. Site is being cleaned up, looks good.
2244622 Primary Facility 2014-02-07 Routine/Complete Inspection No Violations Noted
2252383 Primary Facility 2014-03-07 Routine/Complete Inspection No Violations Noted
2367912 Primary Facility 2015-05-07 Routine/Complete Inspection No Violations Noted
2446200 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted
2565368 Primary Facility 2017-02-27 Routine/Complete Inspection No Violations Noted Seven Wells in production status. Seven water separators within plastic lined containment. No leaks detected from production equipment. No violations taken at this time.
2723967 Primary Facility 2018-04-27 Routine/Complete Inspection No Violations Noted Seven wells in a production status. Seven GPU's within containment. No leaks from production equipment.
2792301 Primary Facility 2018-10-19 Site Restoration No Violations Noted A Notice of Termination (NOT) was received by the department from the operator on October 5, 2018 and prompted this inspection.

Seven wells are staged for production. A compressor unit sits on the east corner of the pad. Seven GPUs are present within felt and plastic containment. A trace of water is within the containment. Seven produced water tanks are present within steel containment woth plastic liner. A trace of water is present within this containment.

Some of the pad surface has been restored and is well-vegetated with greater than 70% vegetation. The side slopes and top soil stockpiles are well-vegetated as well with greater than 70% vegetation. The vegetated filter strip at the north corner of the pad is well vegetated. No E&S issues were noted in these locations.

Infiltration berm #1 does not appear to be functioning as designed. Stormwater appears is being retained by the earthen level spreader. Vegetation within and around the infiltration area is less than 70%.

The department recommends re

For data sources see[8]

References