X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22405

Well Details

Well ID: 37-015-22405
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 147405
Farm/Lease Name: P CULLEN UNIT
License Status:
Spud Date:
Permit Date: 2013-01-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.568244
Longitude: -76.548686

For data sources see[1][2][3]

Well History

Date Event
2013-01-03 New Permit Application
2013-10-24 Permit Renewal Application
2014-06-20 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-02 2014-12-10 7,806 10,692,600

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.1 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.01 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.891 0
MCB-8614 MULTI-CHEM BIOCIDE GLUTARALDEHYDE 111-30-8 30 0.02 0
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.03 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHIEF OIL & GAS LLC 67,255.00 11 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 2,356,644.73 360 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 1,631,321.48 358 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,325,860.21 344 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,135,434.65 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,039,220.14 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drill Cuttings 859.65 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 11,712.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 3,012.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 2,276.73 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drill Cuttings 318.29 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 11,848.98 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 16,331.82 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 420.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Produced Fluid 3,888.73 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 238.14 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 1,683.83 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 710.83 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 1,360.44 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2137754 Primary Facility 2013-01-31 Routine/Partial Inspection No Violations Noted
2168880 Primary Facility 2013-05-22 Routine/Partial Inspection No Violations Noted
2268886 Primary Facility 2014-04-02 Routine/Complete Inspection No Violations Noted
2291206 Primary Facility 2014-07-24 Routine/Complete Inspection No Violations Noted
2303824 Primary Facility 2014-09-12 Routine/Complete Inspection No Violations Noted
2500768 Primary Facility 2016-07-04 Routine/Complete Inspection No Violations Noted
2508580 Primary Facility 2016-08-08 Routine/Complete Inspection No Violations Noted
2549031 Primary Facility 2017-01-04 Routine/Complete Inspection No Violations Noted Rig matting and empty production storage tanks located on wellsite. One well is in production phase. One well recently drilled. No violations noted.
2577026 Primary Facility 2017-03-30 Routine/Complete Inspection No Violations Noted I arrived on-site @ 11:15 hrs and met Dale Graham, Chief company man. Frac was completed on 3/29; crews on location were swapping frac trees on wells for production trees. The 2H had the production head on and was tagged, and the 1H was having the production tree installed. Production crew will be moving on today or tomorrow to begin flowback operations. I departed @ 11:45 hrs.
2736083 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted Two wells staged for production phase. Two water separators. No leaks detected from production equipment. No violations noted.

For data sources see[8]

References