If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22301 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.820014,"lon":-76.735833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Springfield Township | |
Operator Name: EOG RESOURCES INC | |
Well Pad ID: 152795 | |
Farm/Lease Name: KLINE 15H | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2012-10-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.820014 | |
Longitude: -76.735833 |
Date | Event |
---|---|
2012-10-22 | New Permit Application |
2012-11-25 | Performed Spud Operation |
2013-05-02 | Perforation |
2014-01-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-30 | 2017-05-20 | 6,434 | 12,308,600 | 0 |
2 | 2013-06-01 | 2013-06-01 | 6,434 | 282,282 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.01468 | 0 | |||
Glutaraldehyde | 111-30-8 | 30 | 0.00662 | 0 | ||||
Dimethylamine | 68439-70-3 | 0.5 | 0.00011 | 0 | ||||
Ammonia | 7664-41-7 | 0.5 | 0.00005000 | 0 | ||||
Crystalline Silica | 14808-60-7 | 100 | 13.3502 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.00227 | 0 | ||||
Ammonium, didecyldimethyl-, chloride | 7173-51-5 | 5 | 0.0011 | 0 | ||||
Alkyl phosphonic acid | Trade Secret | 5 | 0.00047 | 0 | ||||
Petroleum naphtha | 64742-47-8 | 30 | 0.0136 | 0 | ||||
Sand | EOG | Proppant | Listed Below | |||||
BioClear 2256 | US Well Services | Biocide | Listed Below | |||||
Water | EOG | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.3774 | 0 | |
Hydrochloric Acid | EOG | Acid | Listed Below | |||||
WFRA-5000 | US Well Services | Friction Reducer | Listed Below | |||||
SI 1200s | US Well Services | Scale Inhibitor | Listed Below | |||||
2 | Plexhib 256 | Chemplex | Corrosion Inhibitor for hydrochloric acid | Methyl Alcohol | 67-56-1 | 60 | 0.00103 | 0 |
C-14 to C-16 Alpha Olefins | 64743-02-8 | 5 | 0.00009000 | 0 | ||||
Thiourea/Formaldehyde Copolymer | 68527-49-1 | 30 | 0.00051 | 0 | ||||
Polyethoxylated Alcohol Surfactant | 68951-67-7 | 30 | 0.00051 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 10 | 0.00017 | 0 | ||||
Sand | EOG | Proppant | Crystalline Silica | 14808-60-7 | 100 | 4.1261 | 0 | |
Plexslick 961 | Chemplex | Friction reducer for water | Water | 7732-18-5 | 35 | 0.0087 | 0 | |
Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.00745 | 0 | ||||
Polyacrylamide-co-acrylic acid | 9003-06-9 | 32 | 0.00795 | 0 | ||||
Alcohol Ethoxylate Surfactants | Trade Secret | 8 | 0.00199 | 0 | ||||
Water | EOG | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 93.6911 | 0 | |
Ferriplex 40 | Chemplex | Iron Control | Sodium Sulfate Anhydrous | 7757-82-6 | 2 | 0.00005000 | 0 | |
Water | 7732-18-5 | 60 | 0.00155 | 0 | ||||
Trisodium Nitrilotriacetate | 5064-31-3 | 40 | 0.00104 | 0 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.00003000 | 0 | ||||
BIO CLEAR 2000 | Weatherford | Biocide | Polyethylene Glycol | 25322-68-3 | 70 | 0.00692 | 0 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 40 | 0.00396 | 0 | ||||
SCALE CLEAR SI 112 | Weatherford | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00554 | 0 | |
Hydrochloric Acid | Basic Chemical Solutions | Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.15974 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EOG RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EOG RESOURCES INC | 2,040,153.99 | 215 | 0.00 | 0 | 0.00 | 0 |
2018 | EOG RESOURCES INC | 1,882,100.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | EOG RESOURCES INC | 1,290,633.15 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | EOG RESOURCES INC | Drill Cuttings | 957.52 Tons | LANDFILL | 301358 |
2013 | EOG RESOURCES INC | Fracing Fluid Waste | 1,013.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EOG RESOURCES INC | Drill Cuttings | 54.33 Tons | LANDFILL | 301358 |
2017 | EOG RESOURCES INC | Produced Fluid | 51.20 Tons | LANDFILL | 301358 |
2017 | EOG RESOURCES INC | Produced Fluid | 1,634.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | EOG RESOURCES INC | Produced Fluid | 24,362.60 Bbl | REUSE (AT WELL PAD) | |
2017 | EOG RESOURCES INC | Produced Fluid | 162.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | EOG RESOURCES INC | Produced Fluid | 474.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | EOG RESOURCES INC | Produced Fluid | 4.50 Tons | LANDFILL | 301358 |
2018 | EOG RESOURCES INC | Produced Fluid | 119.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | EOG RESOURCES INC | Synthetic Liner Materials | 1.50 Tons | LANDFILL | 301358 |
2018 | EOG RESOURCES INC | Produced Fluid | 7,391.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EOG RESOURCES INC | Produced Fluid | 1,698.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | EOG RESOURCES INC | Produced Fluid | 229.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | EOG RESOURCES INC | Produced Fluid | 93.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EOG RESOURCES INC | Produced Fluid | 461.01 Bbl | REUSE (AT WELL PAD) | |
2019 | EOG RESOURCES INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | EOG RESOURCES INC | Produced Fluid | 126.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2118121 | Primary Facility | 2012-11-27 | Routine/Complete Inspection | No Violations Noted | |
2127619 | Primary Facility | 2013-01-02 | Routine/Complete Inspection | No Violations Noted | |
2140936 | Primary Facility | 2013-02-20 | Drilling/Alteration | No Violations Noted | |
2701510 | Primary Facility | 2018-03-06 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. Piles of filter sock casing and stakes have been deposited in several piles along the west boundary of the site and should be removed. No violations cited. |
2733355 | Primary Facility | 2018-05-21 | Routine/Partial Inspection | No Violations Noted | I took electrical conductivity readings with an Oakton PCSTestr 35. Secondary containment was leaking 3.4 mS/cm liquid onto the pad surface (photo 1). I taped the liner to stop the leak, then called Nathan Wells (EOG Environmental) who said he would send the containment repair crew. Liquid was still ~6" deep inside the secondary containment, which is where I collected sample 0935-387. An undetermined amount of the regulated substance leaked onto the pad surface. Please refer to 78a66 regarding remediating releases. Violations cited to the 015-22380 drilling permit. JLP |
2739108 | Primary Facility | 2018-06-07 | Follow-up Inspection | No Violations Noted | I took electrical conductivity readings from standing liquid on site with an Oakton PCSTestr 35. Water in the east side ditch returned a 0.34 mS/cm reading. I did not see any standing liquid on the pad surface. Violations cited to the 015-22380 drilling permit on May 23, 2018 remain outstanding. JLP |
2775103 | Primary Facility | 2018-07-26 | Compliance Evaluation | No Violations Noted | Violations from my May 21, 2018 inspection (2732703) shall be closed. EOG excavated an area approximately 10'x10' 4-6" deep (photo 1) to remediate the spill of flowback. Electrical conductivity of puddles in the excavated area is 0.31 mS/cm today with an Oakton PCSTestr 35. JLP |
2844095 | Primary Facility | 2019-02-25 | Routine/Complete Inspection | No Violations Noted | I took electrical conductivity readings from pooled water on site. A puddle near the production tanks returned 0.33 mS/cm.
Air temp 28 F, partly sunny. JLP |
For data sources see[8]