Well Details

Well ID: 37-009-20080
Loading map...
Country: United States
State: Pennsylvania
County: Bedford
Municipality: Monroe Township
Operator Name: STECKMAN RIDGE LP
Well Pad ID:
Farm/Lease Name: SR 22
License Status:
Spud Date: 2009-04-07
Permit Date: 2008-10-29
Well Type: STORAGE WELL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 39.871260
Longitude: -78.359240

For data sources see[1][2][3]

Well History

Date Event
2008-10-29 New Permit Application
2009-04-07 Performed Spud Operation
2009-06-27 Drilling Completion
2010-06-28 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2010 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2011 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2012 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2013 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2014 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2015 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2016 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2017 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0
2018 STECKMAN RIDGE LP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1798439 Primary Facility 2009-04-09 Drilling/Alteration No Violations Noted site constructed not drilled.
1804145 Primary Facility 2009-06-09 Drilling/Alteration No Violations Noted Waiting on plug back cement, drilled to 6,421' - Oriskany came in high, plugged back hole to 5,650', preparing to redrill directional turn. E&S ok, although pad runoff diversion needed near tanks to reinforce compost berm.
1805988 Primary Facility 2009-06-09 Drilling/Alteration De minimus Violations Noted Site was inspected with O&G inspector Bruce Jankura. Site ID sign and E&S plan are on site. BMPs are in place. On back edge of site, there was an area of accelerated Erosion about 1ft wide by 4ft long across fill slope. The material washed out the wood chip berm and carried out into the woods about 6ft. Issue was discussed with Dave Bimber on site and proper clean-up and restabilization was addressed. There were no other E&S control issues on site. There were a few small piles of KCl near chemical storage area. Piles were about six inches in diameter. These will also be cleaned up as soon as possible. Pit liner was sound and liquid level was greater than 2ft. of freeboard. Truck was on site to haul off some of the waste water. Waste water is being disposed of properly at an Altoona wate facility
1811606 Primary Facility 2009-07-07 Follow-up Inspection No Violations Noted On back edge of site, where area of accelerated Erosion was previously noted, all material had been pulled back onto site and area was seeded and mulched. The wood chip barrier was replaced and the hill had been reconstructed and stabilized. There was some build-up of sediments along wood chip berm that Mr. Anderson Addressed. It will be cleaned out immediately. On day of inspection rig was being moved off site. There were no other E&S control issues on site. The waste water from the pit is being transferred to sewage treatment plants in Altoona and Johnstown. So far 394,700 gallons have gone for disposal. The drill cuttings are being solidified with cement and hauled to Sandy Run Landfill in Hopewell, Pa Pit liner was sound and liquid level was greater than 2ft. of freeboard. Neighboring landowner was observing and documenting inspection from 4-wheeler parking at edge of site and camoflauged Turkey Blind.
1812017 Primary Facility 2009-07-07 Drilling/Alteration No Violations Noted The following items were noted during the inspection:
1872388 Primary Facility 2010-03-25 Site Restoration No Violations Noted -site restored to DEP standards. Extra implements completed at landowners request
1872569 Primary Facility 2010-03-25 Routine/Complete Inspection No Violations Noted Storage Well
1903197 Primary Facility 2010-08-03 Routine/Complete Inspection No Violations Noted Field Idle - 2213 Psi Casing; annulus 103 psi
2017409 Primary Facility 2011-11-01 Routine/Complete Inspection No Violations Noted
2106066 Primary Facility 2012-10-04 Routine/Complete Inspection No Violations Noted
2227754 Primary Facility 2013-12-04 Routine/Complete Inspection No Violations Noted
2312942 Primary Facility 2014-10-14 Routine/Complete Inspection No Violations Noted
2467969 Primary Facility 2016-03-23 Routine/Complete Inspection No Violations Noted
2539550 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted Storage field inspection. Well head and plumbing in good condition. No violations noted at time of inspection.
2661140 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted Steckman Ridge Storage Field. Line Pressure 2.018 psi, Annulus Pressure .6 psi.
2819990 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted The weather is 35 Deg. F and sunny at the time of inspection. Routine inspection of Steckman Ridge LP (operated by Enbridge), Well Name SR 22 on December 11, 2018. There is 1 active storage gas well on this pad. 0% combustible gas was detected in the area immediately surrounding the well. Storage Field line pressure is 1339 PSI, annulus pressure ¿ 1 PSI. No violations are noted at time of inspection.

DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.