X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31274

Well Details

Well ID: 37-005-31274
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154091
Farm/Lease Name: NOLDER
License Status:
Spud Date:
Permit Date: 2017-03-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.851961
Longitude: -79.558244

For data sources see[1][2][3]

Well History

Date Event
2017-03-20 New Permit Application
2017-04-24 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-24 2018-08-04 6,583 19,355,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KSI-22 Keane Scale Inhibitor 2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.0022075 3974.56
Methanol 67-56-1 50 0.0110375 19872.8
KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.00138762 2498.38
oleic acid diethanolamide 93-83-4 1.5 0.000104071 187.378
Water 7732-18-5 60 0.00416285 7495.13
ammonium chloride 12125-02-9 1.5 0.000104071 187.378
alcohols, C12-16, ethoxylated 68551-12-2 1 0.00006938 124.919
KAI-12 Keane Acid Inhibitor Fatty imidazoline 61790-69-0 5 0.00005891 106.061
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005891 106.061
xylene 1330-20-7 5 0.00005891 106.061
Methanol 67-56-1 90 0.00106032 1909.09
ethylbenzene 100-41-4 1 0.00001178 21.212
isoproyl alcohol 67-63-0 5 0.00005891 106.061
prop-2-yn-1-ol 107-19-7 5 0.00005891 106.061
Hydrochloric Acid (15%) Keane Acid Inhibitor Water 7732-18-5 85 0.468796 844059
Hydrochloric Acid 7647-01-0 15 0.0827288 148952
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.67159 17,413,500.0
KFR-36 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 60 0.0150132 27031
MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.0010678 1922.56
glutaral 111-30-8 26.7 0.00357721 6440.7
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000711423 1280.9
Other Chemical(s) Listed Above See Trade Name(s) List ethylbenzene 100-41-4 1 0.00001178 21.212
oleic acid diethanolamide 93-83-4 1.5 0.000104071 187.378
isoproyl alcohol 67-63-0 5 0.00005891 106.061
Fatty imidazoline 61790-69-0 5 0.00005891 106.061
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000711423 1280.9
alcohols, C12-16, ethoxylated 68551-12-2 1 0.00006938 124.919
xylene 1330-20-7 5 0.00005891 106.061
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.0022075 3974.56
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.00138762 2498.38
prop-2-yn-1-ol 107-19-7 5 0.00005891 106.061
ammonium chloride 12125-02-9 1.5 0.000104071 187.378
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005891 106.061
Water 7732-18-5 85 0.468796 844059
didecyldimethylammonium chloride 7173-51-5 8 0.0010678 1922.56
Water Snyder Brothers, Inc Carrier/Base Fluid Water 7732-18-5 100 89.7083 161,518,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 555,478.00 66 0.00 0 0.00 0
2019 SNYDER BROS INC 1,292,428.00 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC Drill Cuttings 26.34 Tons INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 2,203.75 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 253.92 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 1,065.15 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 2,261.22 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 771.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Synthetic Liner Materials 1.92 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 23,586.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 92.73 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 1,026.10 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Synthetic Liner Materials 2.16 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 17,346.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 4,136.20 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2584994 Primary Facility 2017-04-20 Preoperation Inspection No Violations Noted Site construction had been completed. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2591824 Primary Facility 2017-05-09 Drilling/Alteration No Violations Noted Spudded 4/25/2017. Ran 42' of 30" casing-cemented to surface-covered with steel plate until Rig arrives. Paper work in place and site looks ok.
2608096 Primary Facility 2017-06-26 Drilling/Alteration No Violations Noted Top hole Rig had drilled this well to the kick off point - moved to the next hole and covered the celler with a steel plate. Site looks ok.
2617266 Primary Facility 2017-07-20 Routine/Complete Inspection No Violations Noted Drilling was ongoing for the Nolder 1H at the time of the inspection. Well-site secondary containment located onsite and it appeared to be in sound condition and functioning as intended. Drill cuttings are being collected to be hauled offsite for disposal. All site and access road erosion controls had been installed properly and were functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2624940 Primary Facility 2017-08-07 Drilling/Alteration No Violations Noted Well drilled to kick off point-casing covered over with steel plate waiting for finishing rig. All equipment on site looked ok.
2635212 Primary Facility 2017-09-11 Routine/Complete Inspection No Violations Noted Drilling was ongoing for Nolder 4H at the time of the inspection. Secondary containment was located onsite. There were no issues observed in relation to the secondary containment. All site and access road controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2661653 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H drilled, not yet frac'd. 3H, 4H, 1H drilled, not yet frac'd. Rig not on-site. No tanks on-site. Pad containment remains on-site.
2683712 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, and 4H also drilled, not yet frac'd. No rig on-site.
2705263 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted This well has been drilled and is waiting on frac. The well head casing, cellar, protective grating, containment and piping on site looks ok.
2713770 Primary Facility 2018-03-20 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, 4H also drilled, not yet frac'd. No rig on-site.
2724808 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, 4H also drilled, not yet frac'd. No rig on-site.
2748316 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted At time of inspection, frac'g equipment and crew on-site preparing to resume stimulation operations. Keane safety representative Carl on-site.
2760920 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted This well has been fracked and is awaiting the snubbing unit to drill out the plugs. The well head and equipment looks ok.
2798075 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted Flow back operations have been completed on this well and it has the new well head and equipment installed and is awaiting turn on to the new pipeline. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2821141 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References