X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31263

Well Details

Well ID: 37-005-31263
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153668
Farm/Lease Name: RENSHAW 3H
License Status:
Spud Date:
Permit Date: 2016-05-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.715931
Longitude: -79.621517

For data sources see[1][2][3]

Well History

Date Event
2016-05-12 New Permit Application
2017-03-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-17 2017-11-08 6,940 16,114,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KSI-19NW Keane Scale Inhibitor Methanol 67-56-1 30 0.0053412 7954.37
KAI-12 Keane Acid Inhibitor Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006313 94.019
Methanol 67-56-1 90 0.00113637 1692.34
ethylbenzene 100-41-4 1 0.00001263 18.804
isoproyl alcohol 67-63-0 5 0.00006313 94.019
prop-2-yn-1-ol 107-19-7 5 0.00006313 94.019
xylene 1330-20-7 5 0.00006313 94.019
Fatty imidazoline 61790-69-0 5 0.00006313 94.019
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00006313 94.019
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000827233 1231.95
oleic acid diethanolamide 93-83-4 1.5 0.00124085 1847.93
didecyldimethylammonium chloride 7173-51-5 8 0.00076154 1134.12
Fatty imidazoline 61790-69-0 5 0.00006313 94.019
ethylbenzene 100-41-4 1 0.00001263 18.804
xylene 1330-20-7 5 0.00006313 94.019
ammonium chloride 12125-02-9 1.5 0.00124085 1847.93
isoproyl alcohol 67-63-0 5 0.00006313 94.019
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000507375 755.607
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006313 94.019
Water 7732-18-5 92.5 0.0163442 24340.6
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0165447 24639.1
Water 7732-18-5 85 0.50221 747915
Hydrochloric Acid (7.5%) Keane Acidizing Water 7732-18-5 92.5 0.0163442 24340.6
Hydrochloric Acid 7647-01-0 7.5 0.00132521 1973.56
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 8.98315 13,378,100.0
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 90.297 134,475,000.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0886253 131985
Water 7732-18-5 85 0.50221 747915
KFR-16FW Keane Friction Reducer alcohols, C12-16, ethoxylated 68551-12-2 1 0.000827233 1231.95
Water 7732-18-5 60 0.049634 73917.3
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0165447 24639.1
oleic acid diethanolamide 93-83-4 1.5 0.00124085 1847.93
ammonium chloride 12125-02-9 1.5 0.00124085 1847.93
MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.00255121 3799.38
didecyldimethylammonium chloride 7173-51-5 8 0.00076154 1134.12
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000507375 755.607

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 1,439,120.00 319 0.00 0 0.00 0
2019 SNYDER BROS INC 1,180,293.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 1,541.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 975.28 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 1,541.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 237.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 106.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 4.08 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 975.28 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.89 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 26,985.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 2,312.50 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 11.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 467.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 61.73 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 0.73 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 13,290.60 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,300.80 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 41.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,506.40 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2573229 Primary Facility 2017-03-20 Drilling/Alteration No Violations Noted Well spudded to 42' on 3/16/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
2580986 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2606700 Primary Facility 2017-06-22 Routine/Complete Inspection No Violations Noted Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition. There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment. All access road and site erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2624943 Primary Facility 2017-08-07 Drilling/Alteration No Violations Noted The finishing rig was drilling at 2,242' at the time of this inspection. All equipment on site and the daily drilling information looked ok.
2626444 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted Rig drilling at 11,984' at the time of this inspection. On site drilling info and all equipment on site looked ok.
2633978 Primary Facility 2017-09-08 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Secondary containment was located onsite. Minimal precipitation had accumulated on the containment. No sheens were observed in the puddles of water located on the containment. All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP. Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge. There was no observed accelerated erosion or sedimentation in relation to the access road.
2647159 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized. All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17. Secondary containment had been implemented as outlined in the containment plan.
2681581 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
2750712 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.

For data sources see[8]

References