X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31257

Well Details

Well ID: 37-005-31257
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 152316
Farm/Lease Name: BIBLICAL LIFE
License Status: Active
Spud Date: 2016-03-01
Permit Date: 2016-03-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.743919
Longitude: -79.646539

For data sources see[1][2][3]

Well History

Date Event
2016-03-04 New Permit Application
2016-03-15 Performed Spud Operation
2016-05-06 Drilling Completion
2016-06-15 Drilling Completion
2016-07-18 Performed Stage 1 of Stimulation
2016-07-19 Perforation
2016-07-19 Performed Stage 2 of Stimulation
2016-07-19 Performed Stage 3 of Stimulation
2016-07-20 Perforation
2016-07-20 Performed Stage 4 of Stimulation
2016-07-21 Perforation
2016-07-21 Performed Stage 5 of Stimulation
2016-07-21 Performed Stage 6 of Stimulation
2016-07-22 Perforation
2016-07-22 Performed Stage 7 of Stimulation
2016-07-23 Performed Stage 8 of Stimulation
2016-07-23 Performed Stage 9 of Stimulation
2016-07-24 Perforation
2016-07-24 Performed Stage 10 of Stimulation
2016-07-25 Perforation
2016-07-25 Performed Stage 11 of Stimulation
2016-07-25 Performed Stage 12 of Stimulation
2016-07-26 Perforation
2016-07-26 Performed Stage 13 of Stimulation
2016-07-26 Performed Stage 14 of Stimulation
2016-07-27 Perforation
2016-07-27 Performed Stage 15 of Stimulation
2016-07-27 Performed Stage 16 of Stimulation
2016-07-28 Perforation
2016-07-28 Performed Stage 17 of Stimulation
2016-07-28 Performed Stage 18 of Stimulation
2016-07-29 Perforation
2016-07-29 Performed Stage 19 of Stimulation
2016-07-29 Performed Stage 20 of Stimulation
2016-07-29 Performed Stage 21 of Stimulation
2016-07-30 Perforation
2016-07-30 Performed Stage 22 of Stimulation
2016-07-30 Performed Stage 23 of Stimulation
2016-07-31 Perforation
2016-07-31 Performed Stage 24 of Stimulation
2016-07-31 Performed Stage 25 of Stimulation
2016-07-31 Performed Stage 26 of Stimulation
2016-08-01 Perforation
2016-08-01 Performed Stage 27 of Stimulation
2016-08-01 Performed Stage 28 of Stimulation
2016-08-02 Perforation
2016-08-02 Performed Stage 29 of Stimulation
2016-08-02 Performed Stage 30 of Stimulation
2016-08-02 Performed Stage 31 of Stimulation
2016-08-03 Perforation
2016-08-03 Performed Stage 32 of Stimulation
2016-08-03 Performed Stage 33 of Stimulation
2016-08-04 Perforation
2019-06-06 Deviated
2019-06-06 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-18 2016-08-03 6,694 10,400,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Silica Substrate 14808-60-7 100 9.67839 9,381,720.0
KFR-25 Keane Friction Reducer Water 7732-18-5 50 0.00390406 3784.39
distillates (petroleum), hydrotreated light 64742-47-8 18.5 0.0014445 1400.22
Oleic Acid Diethanolamide 93-83-4 1.5 0.000117122 113.532
Ammonium chloride 12125-02-9 2 0.000156163 151.376
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.000117122 113.532
MBC-516 Keane Biocide Ethanol 64-17-5 2.8 0.000244655 237.156
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.000725228 702.998
Glutaraldehyde 111-30-8 27 0.00235918 2286.86
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.000480573 465.842
FR-16FW Keane Friction Reducer Oleic Acid Diethanolamide 93-83-4 1.5 0.00102552 994.082
distillates (petroleum), hydrotreated light 64742-47-8 17.5 0.0119644 11597.6
Alcohols, C12-16, ethoxylated 68551-12-2 1 0.000683678 662.722
Water 7732-18-5 55 0.0376023 36449.7
Ammonium chloride 12125-02-9 1.5 0.00102552 994.082
KSI-16NW Keane Scale Inhibitor ammonia, anhydrous 7664-41-7 0.3 0.00002585 25.053
Alkyl phosphonic acid Proprietary 3 0.000258456 250.534
Hydrochloric Acid (15%) FSTI Acidizing Water 7732-18-5 85 0.583423 565539
Hydrochloric Acid 7647-01-0 15 0.102957 99801.1
AI-600P Weatherford Corrosion Inhibitor 1-Octanol 111-87-5 3 0.00005005 48.511
Pyridine, alkyl derives, quaternized with Benzyl chloride 68909-18-2 10 0.000166817 161.703
2-Butoxyethanol 111-76-2 3 0.00005005 48.511
Dimethylformamide 68-12-2 15 0.000250225 242.555
Triethyl Phosphate 78-40-0 1.8 0.00002919 28.298
1-Decanol 112-30-1 3 0.00005005 48.511
Ethylene Glycol 107-21-1 30 0.000500451 485.11
Methanol 67-56-1 1.8 0.00002919 28.298
Nonyl Phenol Ethoxylate, Branched 127087-87-0 10 0.000166817 161.703
Cinnamaldehyde 104-55-2 10 0.000166817 161.703
Alkyl Pyridine 68391-11-7 0.6 0.00000917 8.894
Water Snyder Brothers Carrier/Base Fluid Water 7732-18-5 100 89.54 86,795,300.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-07-18 1 4,437,920 8,048 8,711
2016-07-19 2 Silica Sand 4,437,920 8,289 8,713
2016-07-19 3 Silica Sand 4,437,920 7,832 8,308
2016-07-20 4 Silica Sand 4,437,920 7,815 8,308
2016-07-21 5 Silica Sand 4,437,920 7,957 8,961
2016-07-21 6 Silica Sand 4,437,920 8,057 8,671
2016-07-22 7 Silica Sand 4,437,920 7,977 9,275
2016-07-23 8 Silica Sand 4,437,920 8,361 8,698
2016-07-23 9 Silica Sand 4,437,920 7,837 9,330
2016-07-24 10 Silica Sand 4,437,920 7,972 8,762
2016-07-25 11 Silica Sand 4,437,920 8,199 9,275
2016-07-25 12 Silica Sand 4,437,920 7,757 8,109
2016-07-26 13 Silica Sand 4,437,920 7,543 9,496
2016-07-26 14 Silica Sand 4,437,920 7,858 8,146
2016-07-27 15 Silica Sand 4,437,920 7,482 9,313
2016-07-27 16 Silica Sand 4,437,920 7,774 9,377
2016-07-28 17 Silica Sand 4,437,920 7,982 9,243
2016-07-28 18 Silica Sand 4,437,920 7,752 9,128
2016-07-29 19 Silica Sand 4,437,920 7,650 8,352
2016-07-29 20 Silica Sand 4,437,920 7,501 9,215
2016-07-29 21 Silica Sand 4,437,920 7,621 8,618
2016-07-30 22 Silica Sand 4,437,920 7,608 8,927
2016-07-30 23 Silica Sand 4,437,920 7,966 9,364
2016-07-31 24 Silica Sand 4,437,920 7,451 8,928
2016-07-31 25 Silica Sand 4,437,920 7,360 8,803
2016-07-31 26 Silica Sand 4,437,920 7,311 8,683
2016-08-01 27 Silica Sand 4,437,920 7,287 8,645
2016-08-01 28 Silica Sand 4,437,920 7,616 8,841
2016-08-02 29 Silica Sand 4,437,920 7,540 8,492
2016-08-02 30 Silica Sand 4,437,920 7,889 9,318
2016-08-02 31 Silica Sand 4,437,920 7,431 8,622
2016-08-03 32 Silica Sand 4,437,920 7,262 7,736
2016-08-03 33 Silica Sand 4,437,920 7,332 7,671

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 MDS ENERGY DEV LLC 172,242.00 29 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 1,497,413.00 347 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 1,308,301.00 365 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 1,110,796.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 519.39 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 MDS ENERGY DEV LLC 3,036.22 Bbl REUSE OTHER THAN ROAD SPREADING
2016 MDS ENERGY DEV LLC 519.39 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 200.27 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016 MDS ENERGY DEV LLC 79.23 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 MDS ENERGY DEV LLC Produced Fluid 191.47 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 MDS ENERGY DEV LLC 191.47 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 MDS ENERGY DEV LLC Produced Fluid 235.49 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 MDS ENERGY DEV LLC Drill Cuttings 1,317.51 Tons LANDFILL 100585
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 2,866.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016 MDS ENERGY DEV LLC Synthetic Liner Materials 1.55 Tons LANDFILL 100434
2016 MDS ENERGY DEV LLC Produced Fluid 384.04 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 MDS ENERGY DEV LLC 1,159.09 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 MDS ENERGY DEV LLC Other Oil & Gas Wastes 1.15 Tons LANDFILL 100585
2016 MDS ENERGY DEV LLC 200.27 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016 MDS ENERGY DEV LLC 255.07 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 977.15 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 MDS ENERGY DEV LLC Produced Fluid 1,159.09 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 38.35 Tons LANDFILL 100585
2016 MDS ENERGY DEV LLC Produced Fluid 79.23 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 MDS ENERGY DEV LLC Fracturing Fluid Waste 255.07 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 MDS ENERGY DEV LLC Produced Fluid 169.46 Bbl REUSE OTHER THAN ROAD SPREADING
2017 MDS ENERGY DEV LLC 6,621.31 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 MDS ENERGY DEV LLC 3,587.08 Bbl REUSE (AT WELL PAD)
2017 MDS ENERGY DEV LLC Waste Water Treatment Sludge 4.90 Tons LANDFILL 100594
2017 MDS ENERGY DEV LLC 1.72 Tons LANDFILL 100594
2017 MDS ENERGY DEV LLC Synthetic Liner Materials 4.58 Tons LANDFILL 100594
2017 MDS ENERGY DEV LLC Produced Fluid 603.61 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 MDS ENERGY DEV LLC Waste Water Treatment Sludge 3.21 Tons LANDFILL 100585
2017 MDS ENERGY DEV LLC 24.21 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 MDS ENERGY DEV LLC Produced Fluid 7,716.21 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 MDS ENERGY DEV LLC Synthetic Liner Materials 3.31 Tons LANDFILL 100585
2017 MDS ENERGY DEV LLC Produced Fluid 3,985.42 Bbl REUSE (AT WELL PAD)
2018 MDS ENERGY DEV LLC Produced Fluid 9,217.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 MDS ENERGY DEV LLC Produced Fluid 453.40 Bbl REUSE (AT WELL PAD)
2018 MDS ENERGY DEV LLC Produced Fluid 226.70 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 MDS ENERGY DEV LLC Produced Fluid 223.40 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 MDS ENERGY DEV LLC Produced Fluid 1,177.50 Bbl REUSE (AT WELL PAD)
2019 MDS ENERGY DEV LLC Produced Fluid 58.30 Bbl INJECTION DISPOSAL WELL 34-099-2-3171
2019 MDS ENERGY DEV LLC Produced Fluid 5,885.10 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2463268 Primary Facility 2016-03-10 Preoperation Inspection No Violations Noted Site construction had been effectively completed as outlined in the E&S plan contained within the ESCGP. All E&S controls had been constructed and all disturbed earth had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2466910 Primary Facility 2016-03-21 Drilling/Alteration No Violations Noted Set 6'x6' cellar 3/15/16. Drilled 32" hole to 42' - set 42' of 26" conductor - grouted inside-out.
2467302 Primary Facility 2016-03-23 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. All site and acces sroad E&S controls outlined in the E&S plan within the ESCGP had been properly implemented. Al disturbed areas had been temporarily stabilized.
2480952 Primary Facility 2016-05-02 Drilling/Alteration No Violations Noted Rig drilling @ 2310' @ time of inspection. Ran/cemented 866' of 13 3/8 pipe-14 bbl return. Ran/cemented 2103' of 9 5/8" pipe-40 bbl return. Daily drilling log-equipment looked ok.
2486441 Primary Facility 2016-05-23 Routine/Complete Inspection No Violations Noted Drilling had commenced, but was not ongoing at the time of the inspection. Work was underway to set up the NOMAC drilling rig onsite. Also final touches were being made on the construction of the freshwater impundment and its security fencing along with the tank pad for the flowback tanks to be located onsite. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP.
2492320 Primary Facility 2016-06-13 Drilling/Alteration No Violations Noted Nomac #78 finishing Rig was drilling in the curve of this well @ 7,665' at the time of this inspection. The BOP test chart - daily drilling information and on site equipment looked ok.
2494676 Primary Facility 2016-06-17 Drilling/Alteration No Violations Noted Nomac Rig # 78 had just tripped out of the hole and was rigging down @ the time of this inspection. Drilling site/equipment looked ok. Rig had just run 13,087' of production casing and cemented it back to surface with a 30 bbl return on cement.
2495386 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, NOMAC drilling rig had been rigged down and moved off-site. OG-71 approved Aboveground Storare Tank (AST) had been constructed onsite in preparation for well stimulation activities. Freshwater impoundment construction had been completed, the impoundment had been lined, and was being filled with purchased water from a nearby hydrant. All disturbed areas had been temporarily stabilized with vegetation. E&S controls had been implemented and maintained as outlined in the E&S plan within the ESCGP and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2503686 Primary Facility 2016-07-19 Drilling/Alteration No Violations Noted Keane frac crew was pumping the 2nd stage of the planned 151 stage zipper frac on the 4H at the time of this inspection. All equipment and containments on site looked ok.
2503728 Primary Facility 2016-07-20 Drilling/Alteration No Violations Noted Keane frac crew zipper fracking 4th stage on this 4H well @ the time of this inspection. Conducted entire site inspection along with DEP Air Quality Specialist Cary Miller. All equipment and containment on site looked ok.
2552430 Primary Facility 2017-01-13 Routine/Complete Inspection No Violations Noted Drilling had been completed, wells were equipped for production. Brine tanks located onsite within secondary containment. Tanks and containment appeared to be in sound condition. Site had been constructed, E&S Controls had been maintained and the site had been stabilized with vegetation as outlined in the E&S plan contained within the ESCGP. Based upon the condition if the site and the completeness if the Restoration Extension Request submission the request will be granted extending the restoration deadline until March 15, 2019.
2569468 Primary Facility 2017-03-08 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2589360 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2589361 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2595538 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2689117 Primary Facility 2018-01-31 Routine/Partial Inspection No Violations Noted Multi-well pad. At time of inspection, well 4H drilled and appears equipped for production. Wells 1H, 2H, and 3H all drilled and appear equipped for production.
2766346 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2821588 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References