X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31215

Well Details

Well ID: 37-005-31215
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 151874
Farm/Lease Name: AMBROSE
License Status: Active
Spud Date: 2014-10-08
Permit Date: 2014-07-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.860606
Longitude: -79.539425

For data sources see[1][2][3]

Well History

Date Event
2014-07-09 New Permit Application
2014-10-08 Performed Spud Operation
2014-11-26 Drilling Completion
2015-08-19 Perforation
2015-08-25 Perforation
2015-08-25 Performed Stage 1 of Stimulation
2015-08-28 Perforation
2015-08-28 Performed Stage 2 of Stimulation
2015-08-29 Perforation
2015-08-29 Performed Stage 3 of Stimulation
2015-08-29 Performed Stage 4 of Stimulation
2015-08-30 Perforation
2015-08-30 Performed Stage 5 of Stimulation
2015-08-30 Performed Stage 6 of Stimulation
2015-08-31 Perforation
2015-08-31 Performed Stage 7 of Stimulation
2015-08-31 Performed Stage 8 of Stimulation
2015-09-01 Perforation
2015-09-01 Performed Stage 10 of Stimulation
2015-09-01 Performed Stage 9 of Stimulation
2015-09-02 Perforation
2015-09-02 Performed Stage 11 of Stimulation
2015-09-02 Performed Stage 12 of Stimulation
2015-09-03 Perforation
2015-09-03 Performed Stage 13 of Stimulation
2015-09-03 Performed Stage 14 of Stimulation
2015-09-04 Perforation
2015-09-04 Performed Stage 15 of Stimulation
2015-09-04 Performed Stage 16 of Stimulation
2015-09-05 Perforation
2015-09-05 Performed Stage 17 of Stimulation
2015-09-05 Performed Stage 18 of Stimulation
2015-09-05 Performed Stage 19 of Stimulation
2015-09-06 Perforation
2015-09-06 Performed Stage 20 of Stimulation
2015-09-06 Performed Stage 21 of Stimulation
2015-09-07 Perforation
2015-09-07 Performed Stage 22 of Stimulation
2015-09-07 Performed Stage 23 of Stimulation
2015-09-08 Perforation
2015-09-08 Performed Stage 24 of Stimulation
2015-09-08 Performed Stage 25 of Stimulation
2015-09-08 Performed Stage 26 of Stimulation
2016-06-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-25 2015-09-08 6,484 9,469,740 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SCALE CLEAR 112 Weatherford Scale Inhibitor Ethylene Glycol 107-21-1 40 0.00113421 981.138
Sodium Polyacrylate Copolymer 25987-30-8 40 0.00113421 981.138
K BAC 1020 WST Biocide Polyethylene glycol 25322-68-3 60 0.00399209 3453.33
2,2-Diobrom-3nirilopropionamide 10222-01-2 20 0.0013307 1151.11
FFR 730 Nalco Friction Reducer Oxyalkylated alcohol A Proprietary 5 0.00135022 1168
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00297801 2576.1
BIOCLEAR 2000 Weatherford Biocide 2, 2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00183194 1584.7
Water Snyder Brothers Inc Carrier/Base Fluid Water 7732-18-5 100 91.3539 79,025,000.0
LEB 10X Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00001412 12.217
Hydrochloric Acid (15%) FSTI Acid HCL 7647-01-0 15 0.0856738 74111.5
PGS-214 Rockwater Guar Slurry PGS-214 Proprietary 100 0.000556264 481.192
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00206072 1782.61
FRA 405 Weatherford Friction Reducer Petroleum Distillates 64742-47-8 40 0.00495721 4288.19
Sodium Chloride 7647-14-5 10 0.0012393 1072.05
Alcohols, C-12-16, Ethoxylated 68551-12-2 7 0.000867511 750.434
Ammonium Chloride 12125-02-9 7 0.000867511 750.434
FRA 407 Weatherford Friction Reducer Ammonium acetate 631-61-8 5 0.000129867 112.34
Petroleum distillates, hydrotreated light 64742-47-8 40 0.00103894 898.723
FRA 408 Weatherford Friction Reducer Ammonium Chloride 12125-02-9 12125-02-9 20 0.00801289 6931.49
Distillates, Petroleum, Hydrotreated Light 64742-47-8 40 0.0160258 13863
AI 600P Weatherford Acid Inhibitor Triethyl Phosphate 78-40-0 2.5 0.00002799 24.217
2-Butoxyethanol 111-76-2 5 0.00005599 48.433
Cinnamaldehyde 104-55-2 15 0.000167969 145.3
1-Octanol 111-87-5 5 0.00005599 48.433
Nonyl Phenol Ethoxylate, Branched 127087-87-0 15 0.000167969 145.3
Alkyl Pyridine 68391-11-7 1 0.00001120 9.687
Ethylene Glycol 107-21-1 40 0.000447916 387.467
Dimethylformamide 68-12-2 20 0.000223958 193.733
Methanol 67-56-1 2.5 0.00002799 24.217
Pyridine, alkyl derives., quaternized with benzyl chloride 68909-18-2 15 0.000167969 145.3
1-Decanol 112-30-1 5 0.00005599 48.433
Sand (Proppant) Keane Proppant Crystalline Silica, Quartz 14808-60-7 100 7.95577 6,882,080.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-25 1 SILICA SAND 9,469,740 7,776 8,896
2015-08-28 2 SILICA SAND 9,469,740 6,985 9,072
2015-08-29 3 SILICA SAND 9,469,740 6,709 7,344
2015-08-29 4 SILICA SAND 9,469,740 6,709 7,089
2015-08-30 5 SILICA SAND 9,469,740 6,674 7,175
2015-08-30 6 SILICA SAND 9,469,740 6,650 6,912
2015-08-31 7 SILICA SAND 9,469,740 6,636 8,883
2015-08-31 8 SILICA SAND 9,469,740 6,727 8,869
2015-09-01 9 SILICA SAND 9,469,740 6,516 7,346
2015-09-01 10 SILICA SAND 9,469,740 8,232 9,715
2015-09-02 11 SILICA SAND 9,469,740 6,487 7,788
2015-09-02 12 SILICA SAND 9,469,740 6,512 7,974
2015-09-03 13 SILICA SAND 9,469,740 6,441 7,053
2015-09-03 14 SILICA SAND 9,469,740 6,355 6,932
2015-09-04 15 SILICA SAND 9,469,740 6,421 7,882
2015-09-04 16 SILICA SAND 9,469,740 6,606 7,149
2015-09-05 17 SILICA SAND 9,469,740 6,623 7,112
2015-09-05 18 SILICA SAND 9,469,740 6,604 7,040
2015-09-05 19 SILICA SAND 9,469,740 6,508 6,876
2015-09-06 20 SILICA SAND 9,469,740 6,525 6,934
2015-09-06 21 SILICA SAND 9,469,740 6,927 7,846
2015-09-07 22 SILICA SAND 9,469,740 6,683 7,072
2015-09-07 23 SILICA SAND 9,469,740 6,293 6,549
2015-09-08 24 SILICA SAND 9,469,740 6,310 6,521
2015-09-08 25 SILICA SAND 9,469,740 7,071 7,698
2015-09-08 26 SILICA SAND 9,469,740 6,802 7,296

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2015 SNYDER BROS INC 187,951.00 35 0.00 0 0.00 0
2016 SNYDER BROS INC 963,129.00 355 0.00 0 0.00 0
2017 SNYDER BROS INC 584,963.00 273 0.00 0 0.00 0
2018 SNYDER BROS INC 628,950.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 367,471.00 290 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SNYDER BROS INC Drilling Fluid Waste 25.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 SNYDER BROS INC Drill Cuttings 1,325.50 Tons LANDFILL SWF 1025
2014 SNYDER BROS INC Drilling Fluid Waste 33.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Fracturing Fluid Waste 43.55 Tons LANDFILL 100585
2015 SNYDER BROS INC Produced Fluid 952.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Produced Fluid 6,910.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 300.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2015 SNYDER BROS INC Produced Fluid 126.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Fracing Fluid Waste 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 SNYDER BROS INC Fracing Fluid Waste 3,365.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 3,365.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 SNYDER BROS INC Fracing Fluid Waste 1,860.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Produced Fluid 6,910.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 2,844.69 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 641.43 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 SNYDER BROS INC Produced Fluid 840.42 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 118.80 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016 SNYDER BROS INC Produced Fluid 925.13 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 1,566.33 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Produced Fluid 1,400.39 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 6,733.97 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 2,844.69 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 SNYDER BROS INC 5,397.97 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 47.60 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC Produced Fluid 3,227.46 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 2,798.76 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 624.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 6,151.97 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 609.50 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 7,636.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 139.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 630.90 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 2,729.70 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2314199 Primary Facility 2014-10-09 Drilling/Alteration No Violations Noted Rocky Mountain Drilling grouting conductor, mousehole, and cementing cellar at time of inspection.
2315382 Primary Facility 2014-10-24 Routine/Complete Inspection No Violations Noted Drill rig was located onsite and drilling activities were ongoing for 005-31214 Ambrose 2H. Closed loop system was in use for drill cutting disposal resulting in drill cuttings being hauled off-site for disposal. Secondary containment located onsite and it appear to be intact and functioning as required. There was no observed accelerated erosion or sedimentation in relation to the site or existing access road.
2317079 Primary Facility 2014-10-27 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2327573 Primary Facility 2014-12-08 Drilling/Alteration No Violations Noted Waiting on frac.
2337444 Primary Facility 2015-01-20 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2352706 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2354574 Primary Facility 2015-03-19 Drilling/Alteration No Violations Noted Waiting on frac.
2366654 Primary Facility 2015-04-24 Drilling/Alteration No Violations Noted Waiting on frac.
2366810 Primary Facility 2015-04-29 Drilling/Alteration No Violations Noted Waiting on frac. Department site visit w/WQS S. Foulk and C. Witham.
2368643 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2377852 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted Waiting on frac.
2382192 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Waiting on frac.
2390254 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling for Ambrose 5H was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2441960 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2442050 Primary Facility 2016-01-19 Routine/Complete Inspection No Violations Noted 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok.
2443546 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production units-equipment-tank battery-dike look ok.
2480490 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2538006 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2583511 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-in production-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok.
2589373 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2674088 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled and appears equipped for production. Wells 2H, 1H, 4H, 5H, 6H also drilled and appear equipped for production.
2683775 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H drilled and appears equipped for production. Wells 1H, 2H, 4H, 5H, 6H also drilled and appear equipped for production.
2709934 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2771431 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment.
2798049 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2821113 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2847438 Primary Facility 2019-02-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 381 psi and the casing pressure was 548 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad.

For data sources see[9]

References