If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31202 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.738939,"lon":-79.683653,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151111 | |
Farm/Lease Name: ALEXANDER LINDSAY UNIT | |
License Status: Active | |
Spud Date: 2014-08-05 | |
Permit Date: 2014-05-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.738939 | |
Longitude: -79.683653 |
Date | Event |
---|---|
2014-05-06 | New Permit Application |
2014-08-04 | Performed Spud Operation |
2014-09-13 | Drilling Completion |
2015-03-19 | Perforation |
2015-03-20 | Performed Stage 1 of Stimulation |
2015-03-21 | Performed Stage 2 of Stimulation |
2015-03-21 | Performed Stage 3 of Stimulation |
2015-03-23 | Performed Stage 4 of Stimulation |
2015-03-25 | Performed Stage 5 of Stimulation |
2015-03-26 | Performed Stage 6 of Stimulation |
2015-03-27 | Performed Stage 7 of Stimulation |
2015-03-27 | Performed Stage 8 of Stimulation |
2015-03-28 | Performed Stage 9 of Stimulation |
2015-03-30 | Performed Stage 10 of Stimulation |
2015-03-30 | Performed Stage 11 of Stimulation |
2015-04-01 | Performed Stage 12 of Stimulation |
2015-04-03 | Performed Stage 13 of Stimulation |
2015-04-06 | Performed Stage 14 of Stimulation |
2015-04-07 | Performed Stage 15 of Stimulation |
2015-04-08 | Performed Stage 16 of Stimulation |
2015-04-09 | Performed Stage 17 of Stimulation |
2015-04-10 | Performed Stage 18 of Stimulation |
2015-04-11 | Performed Stage 19 of Stimulation |
2015-04-13 | Performed Stage 20 of Stimulation |
2016-06-21 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-18 | 2015-04-13 | 6,434 | 6,876,450 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Biocide, EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00741475 | 4762.91 |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.000617896 | 396.909 | ||||
Other - (non-hazardous) | NA | 5 | 0.000617896 | 396.909 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00370738 | 2381.45 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.3337 | 57,384,000.0 | |
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0379402 | 24371.1 | |
Other - (non-hazardous) | NA | 92.5 | 0.882884 | 567126 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0157487 | 10116.3 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0178963 | 11495.8 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Ethoxylated alcohol | 68002-97-1 | 35 | 0.000215503 | 138.43 | |
Formaldehyde | 50-00-0 | 1 | 0.00000616 | 3.955 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000616 | 3.955 | ||||
Methanol | 67-56-1 | 5 | 0.00003079 | 19.776 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000369434 | 237.308 | ||||
Thiourea | 62-56-6 | 1 | 0.00000616 | 3.955 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0085629 | 5500.43 | |
Other - (non-hazardous) | NA | 85 | 0.194092 | 124676 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0181534 | 11660.9 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00753535 | 4840.38 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00366751 | 2355.84 | |
Other - (non-hazardous) | NA | 70 | 0.00855752 | 5496.97 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0443605 | 28495.2 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0190116 | 12212.2 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.39491 | 6,034,870.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-03-20 | 1 | SAND | 5,359,829 | 7,017 | 5,480 |
2015-03-21 | 2 | SAND | 5,359,829 | 7,336 | 6,015 |
2015-03-21 | 3 | SAND | 5,359,829 | 7,011 | 6,465 |
2015-03-23 | 4 | SAND | 5,359,829 | 7,083 | 4,404 |
2015-03-25 | 5 | SAND | 5,359,829 | 7,042 | 4,640 |
2015-03-26 | 6 | SAND | 5,359,829 | 6,974 | 3,928 |
2015-03-27 | 7 | SAND | 5,359,829 | 6,843 | 4,868 |
2015-03-27 | 8 | SAND | 5,359,829 | 7,611 | 6,279 |
2015-03-28 | 9 | SAND | 5,359,829 | 7,280 | 6,805 |
2015-03-30 | 10 | SAND | 5,359,829 | 7,178 | 3,699 |
2015-03-30 | 11 | SAND | 5,359,829 | 6,847 | 4,640 |
2015-04-01 | 12 | SAND | 5,359,829 | 6,835 | 4,790 |
2015-04-03 | 13 | SAND | 5,359,829 | 6,825 | 6,051 |
2015-04-06 | 14 | SAND | 5,359,829 | 7,250 | 5,846 |
2015-04-07 | 15 | SAND | 5,359,829 | 7,046 | 5,440 |
2015-04-08 | 16 | SAND | 5,359,829 | 6,781 | 6,873 |
2015-04-09 | 17 | SAND | 5,359,829 | 6,950 | 5,800 |
2015-04-10 | 18 | SAND | 5,359,829 | 6,798 | 6,716 |
2015-04-11 | 19 | SAND | 5,359,829 | 7,191 | 6,250 |
2015-04-13 | 20 | SAND | 5,359,829 | 7,316 | 4,554 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 710,807.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 1,440,526.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 1,163,956.86 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 819,164.95 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 256.01 Tons | LANDFILL | 100434 |
2014 | XTO ENERGY INC | Drill Cuttings | 57.45 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Produced Fluid | 1,691.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,454.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 117.40 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | |
2017 | XTO ENERGY INC | Produced Fluid | 543.60 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | 3,726.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 | |
2017 | XTO ENERGY INC | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | |
2017 | XTO ENERGY INC | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 4,939.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Soil Contaminated by Oil | 0.31 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 169.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.31 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 3,899.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 753.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 87.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 476.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2278243 | Primary Facility | 2014-06-12 | Routine/Complete Inspection | No Violations Noted | Pre-operational inspection performed. Perimeter E&S controls had been installed as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted on the right as you enter the well pad from the access road between the silt sock and the well pad the property owner had seeded the area with soybeans. |
2294439 | Primary Facility | 2014-08-06 | Drilling/Alteration | No Violations Noted | Well spud in. |
2294448 | Primary Facility | 2014-08-07 | Drilling/Alteration | No Violations Noted | First Class Energy moving in rig#8 at time of inspection. |
2296566 | Primary Facility | 2014-08-19 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was observed onsite. |
2296980 | Primary Facility | 2014-08-20 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. First Class Energy rig#8 RD20 tophole at 5000’. |
2306645 | Primary Facility | 2014-09-17 | Drilling/Alteration | No Violations Noted | Waiting on frac. |
2316074 | Primary Facility | 2014-10-27 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed and there was no ongoing well development activity or equipment located onsite. There was no observed evidence of any spills or discharges on the well-site and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2339893 | Primary Facility | 2015-01-30 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well was not equipped for production.. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2376831 | Primary Facility | 2015-06-08 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2400247 | Primary Facility | 2015-08-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2463626 | Primary Facility | 2016-03-11 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment-tank battery-dike looked ok. |
2481542 | Primary Facility | 2016-05-05 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been temporarily stabilized and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2605212 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion in relation to the site or access road. |
2680632 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | At time of inspection, 5H and 7H are both drilled and appear equipped for production. |
For data sources see[9]