37-005-31179

Well Details

Well ID: 37-005-31179
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Bend Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147239
Farm/Lease Name: SPRING CHURCH UNIT 3H
License Status: Active
Spud Date: 2013-12-18
Permit Date: 2013-11-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.594208
Longitude: -79.412161

For data sources see[1][2][3]

Well History

Date Event
2013-11-04 New Permit Application
2013-12-15 Performed Spud Operation
2014-05-22 Drilling Completion
2014-11-11 Perforation
2014-11-11 Performed Stage 1 of Stimulation
2014-11-12 Perforation
2014-11-12 Performed Stage 2 of Stimulation
2014-11-12 Performed Stage 3 of Stimulation
2014-11-15 Perforation
2014-11-15 Performed Stage 4 of Stimulation
2014-11-22 Perforation
2014-11-22 Performed Stage 5 of Stimulation
2014-11-22 Performed Stage 6 of Stimulation
2014-11-23 Perforation
2014-11-23 Performed Stage 7 of Stimulation
2014-11-23 Performed Stage 8 of Stimulation
2014-11-25 Perforation
2014-11-25 Performed Stage 9 of Stimulation
2014-11-26 Perforation
2014-11-26 Performed Stage 10 of Stimulation
2014-11-28 Perforation
2014-11-28 Performed Stage 11 of Stimulation
2014-11-29 Perforation
2014-11-29 Performed Stage 12 of Stimulation
2014-11-30 Perforation
2014-11-30 Performed Stage 13 of Stimulation
2014-11-30 Performed Stage 14 of Stimulation
2014-12-02 Perforation
2014-12-02 Performed Stage 15 of Stimulation
2014-12-03 Perforation
2014-12-03 Performed Stage 16 of Stimulation
2016-06-20 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-11 2014-12-03 8,000 4,883,860

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00009787 0
J580 Schlumberger Gelling Agent, Water Carbohydrate Polymer Proprietary 100 0.00214538 0
B466 Schlumberger Friction Reducer Alcohol Ethoxylates Proprietary 5 0.00066703 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00400216 0
Ammonium Acetate 631-61-8 6 0.00080043 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 9.51582 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.010218 0
A264 Schlumberger Corrosion Inhibitor Aliphatic acids Proprietary 30 0.00003426 0
Methanol 67-56-1 40 0.00004569 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00003426 0
Prop-2-yn-1-ol 107-19-7 10 0.00001142 0
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00157507 0
Dibromoacetonitrile 3252-43-5 5 0.00013126 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00078754 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00222022 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00085404 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00022106 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 90.3389 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-11-11 1 OTTAWA 3,330,353 8,940 9,400
2014-11-12 2 OTTAWA 3,330,353 8,918 9,414
2014-11-12 3 OTTAWA 3,330,353 8,713 9,394
2014-11-15 4 OTTAWA 3,330,353 8,744 9,325
2014-11-22 5 OTTAWA 3,330,353 8,477 9,379
2014-11-22 6 OTTAWA 3,330,353 8,496 9,163
2014-11-23 7 OTTAWA 3,330,353 8,717 9,330
2014-11-23 8 OTTAWA 3,330,353 8,729 9,230
2014-11-25 9 OTTAWA 3,330,353 8,198 9,309
2014-11-26 10 OTTAWA 3,330,353 9,049 9,268
2014-11-28 11 OTTAWA 3,330,353 8,795 9,593
2014-11-29 12 OTTAWA 3,330,353 8,759 9,676
2014-11-30 13 OTTAWA 3,330,353 8,839 9,240
2014-11-30 14 OTTAWA 3,330,353 8,621 9,440
2014-12-02 15 OTTAWA 3,330,353 8,470 9,333
2014-12-03 16 OTTAWA 3,330,353 8,504 9,144

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 603,624.00 275 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 389,298.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 260,480.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 183,007.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 160,501.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,052.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 300.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 142.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 177.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drill Cuttings 1,136.14 Tons LANDFILL 100434
2014 CHEVRON APPALACHIA LLC Drill Cuttings 48.94 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 37.02 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 12,037.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,580.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Produced Fluid 16,689.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 3,792.68 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 6,036.02 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 16,601.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 467.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,868.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC 169.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 169.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC 1,583.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC 16,601.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC 558.00 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,190.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 694.17 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 1,531.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 112.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 2,250.00 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 180.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2231588 Primary Facility 2013-12-17 Drilling/Alteration No Violations Noted drilling conductor 20'
2232874 Primary Facility 2013-12-27 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. Site construction had been completed and the site and access road erosion controls had been implemented as outlined in the E&S included within the ESCGP. There was no observed accelerated erosion or sedimentation.
2234533 Primary Facility 2014-01-06 Drilling/Alteration No Violations Noted rigging up on pad
2235554 Primary Facility 2014-01-09 Drilling/Alteration No Violations Noted awaiting rig
2238406 Primary Facility 2014-01-14 Drilling/Alteration No Violations Noted WOC at time of inspection
2263821 Primary Facility 2014-04-08 Routine/Complete Inspection No Violations Noted awaiting rig to resume drilling; preparing matting boards to go over existing containment; no additional info. available
2263833 Primary Facility 2004-04-16 Routine/Complete Inspection No Violations Noted awaiting rig to resume drilling
2273536 Primary Facility 2014-05-13 Drilling/Alteration No Violations Noted WOC; @ 2660'
2273550 Primary Facility 2014-05-22 Drilling/Alteration No Violations Noted @ 11,261' drilling with fluid
2308415 Primary Facility 2014-09-30 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Secondary containment construction was underway for the constructed AST's located on the secondary pad adjacent to the primary pad where the well heads are located. All access road and site erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation.
2334507 Primary Facility 2015-01-09 Routine/Complete Inspection No Violations Noted Work was ongoing and equipment was onsite to continue equipping the well for production. The were two constructed AST's for fluid containment located on a secondary pad along a shared access road with the well pad. There was no observed accelerated erosion or sedimentation in relation to the well-site.
2352629 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2375541 Primary Facility 2015-06-02 Routine/Complete Inspection No Violations Noted Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2433913 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted Drilling and well stimualtion acitivities had been completed. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2445864 Primary Facility 2016-02-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-equipement-production unit-tanks-dike all look ok.
2489938 Primary Facility 2016-06-03 Routine/Complete Inspection No Violations Noted Drilling and well stimualtion acitivities had been completed, well appeared to be equipped for production.. Brine tanks located onsite and they appeared to be in sound conditon. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2549277 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Earthwork to bring the site into agreement with the PCSM plan had been completed. The disturbed areas had been stabilized with seed and mulch with the vegetation beginning to emerge. The vegetation had not yet attained 70% uniform coverage. There was no observed accelerated erosion or sedimentation. Brine tanks located onsite and they appeared to be in sound condition.
2595909 Primary Facility 2017-05-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment look ok.
2668636 Primary Facility 2017-12-06 Site Restoration No Violations Noted At time of inspection, wells 1H and 3H drilled and appear equipped for production.
2748718 Primary Facility 2018-07-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2749030 Primary Facility 2018-07-05 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, wells 3H and 1H are both drilled and appear equipped for production.

For data sources see[9]

References