X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30542

Well Details

Well ID: 37-005-30542
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: D D MARSHALL 2
License Status:
Spud Date:
Permit Date: 2010-01-05
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.878070
Longitude: -79.254323

For data sources see[1][2][3]

Well History

Date Event
2010-01-05 New Permit Application
2010-06-11 Performed Spud Operation
2010-06-16 Drilling Completion
2010-06-25 Perforation
2010-09-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 272.00 11 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 832.00 363 0.00 0 0.00 0
2012 XTO ENERGY INC 3,239.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 5,734.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 6,759.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 3,913.00 329 0.00 0 0.00 0
2016 XTO ENERGY INC 4,142.00 365 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,956.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 2,589.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 1,159.00 304 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PHILLIPS EXPLORATION INC Produced Fluid 15.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 XTO ENERGY INC Produced Fluid 66.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid 115.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 XTO ENERGY INC Produced Fluid 48.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2015 XTO ENERGY INC Produced Fluid 77.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 67.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 67 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1919943 Primary Facility 2010-09-28 Routine/Complete Inspection No Violations Noted drilling complete - well being equipped/E&S ok/ID&tank ok
1925111 Primary Facility 2010-11-02 Routine/Complete Inspection No Violations Noted Drilling completed on 06/16/10. Well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had not been regraded or restored at the time of the inspection. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. Below grade drill pits still located onsite. Noted that the pit contained minimal fluids and the drill cuttings. The Department recommends that the operator close the drill pits and begin site restoration activities as soon as possible so that the site is prepped to go through the winter months without developing any erosion issues before the next growing season.
2146343 Primary Facility 2013-03-08 Routine/Complete Inspection No Violations Noted Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been restored and it was noted that the well was located in a crop field.
2586312 Primary Facility 2017-04-24 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-equipment-grounded 100 bbl plastic tank look ok.
2719530 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is shut. The well head casing, piping, equipment and grounded 100 bbl plastic fluid collection tank look ok.

For data sources see[7]

References