X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30330

Well Details

Well ID: 37-005-30330
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146812
Farm/Lease Name: BVL/MUSHROOM FARM 6-1813
License Status:
Spud Date:
Permit Date: 2009-04-28
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.827343
Longitude: -79.665792

For data sources see[1][2][3]

Well History

Date Event
2009-04-28 New Permit Application
2010-03-15 Performed Spud Operation
2010-03-24 Drilling Completion
2010-04-21 Perforation
2013-06-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 27,845.50 166 0.00 0 0.00 0
2011 SNYDER BROS INC 22,770.00 294 0.00 0 0.00 0
2012 SNYDER BROS INC 18,034.00 357 0.00 0 0.00 0
2013 SNYDER BROS INC 13,786.00 362 0.00 0 0.00 0
2014 SNYDER BROS INC 12,448.00 362 0.00 0 0.00 0
2015 SNYDER BROS INC 10,032.00 354 0.00 0 0.00 0
2016 SNYDER BROS INC 8,350.00 334 0.00 0 0.00 0
2017 SNYDER BROS INC 7,470.00 359 0.00 0 0.00 0
2018 SNYDER BROS INC 7,202.00 174 0.00 0 0.00 0
2019 SNYDER BROS INC 12,355.00 324 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 SNYDER BROS INC Produced Fluid 290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 SNYDER BROS INC Produced Fluid 5,635.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2011 SNYDER BROS INC Produced Fluid 360.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 SNYDER BROS INC Produced Fluid 185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 SNYDER BROS INC Produced Fluid 210.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 SNYDER BROS INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 SNYDER BROS INC Produced Fluid 2,216.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 SNYDER BROS INC Produced Fluid 380.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 76.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 SNYDER BROS INC Produced Fluid 800.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Produced Fluid 320.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Produced Fluid 250.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012 SNYDER BROS INC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 SNYDER BROS INC Produced Fluid 410.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 SNYDER BROS INC Produced Fluid 622.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 SNYDER BROS INC Produced Fluid 1,335.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 SNYDER BROS INC Produced Fluid 138.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 450.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2014 SNYDER BROS INC Produced Fluid 558.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 SNYDER BROS INC Produced Fluid 35.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 SNYDER BROS INC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 SNYDER BROS INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Produced Fluid 163.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2015 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2015 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2016 SNYDER BROS INC Produced Fluid 25.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 2,850.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,923.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 570.00 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1871205 Primary Facility 2010-03-15 Drilling/Alteration No Violations Noted MARCELLUS - preparing to spud/E&S ok/ID&pit pk
1871207 Primary Facility 2010-03-16 Drilling/Alteration No Violations Noted MARCELLUS - drilling commenced/E&S ok/ID&pit ok
1874950 Primary Facility 2010-03-26 Routine/Complete Inspection No Violations Noted Well site has been drilled, but it is not equipped for production. The area for the frac pit has been excavated but it is not lined yet. Located the Site ID sign and E&S plan. E&S controls such as silt fence and rocked culverts have been installed. There is no evidence of accelerated erosion or sedimentation on the access road or well site.
1879954 Primary Facility 2010-04-22 Drilling/Alteration No Violations Noted MARCELLUS - drilling complete - frac in process/E&S ok/ID&pit ok
2048295 Primary Facility 2012-03-06 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the well site or access road.
2160831 Primary Facility 2013-04-08 Routine/Complete Inspection No Violations Noted Well site was restored and in production. No E&S issues were noted. Brine tanks and production equipment appeared to be in good condition.
2226481 Primary Facility 2013-10-25 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2470355 Primary Facility 2016-03-31 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus plumbed-venting 10' vertical. Well head casing-production set-equipment- 2 grounded 100 bbl fiberglass tanks patched and ok.
2612529 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-production set equipment-2 100 bbl fiberglass tanks look ok.

For data sources see[7]

References