X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22528

Well Details

Well ID: 37-003-22528
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: South Fayette Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name:
License Status:
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Undetermined
Conservation: No
Latitude: 40.3298
Longitude: -80.1579

For data sources see[1][2][3]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2750335 Primary Facility 2018-06-18 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rigged up with good containment in place. WO wireline truck to log hole before starting.
2750338 Primary Facility 2018-06-18 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Wireline truck logged hole, tool set down at 357', in 5 1/2" casing.
2750723 Primary Facility 2018-06-19 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig ready to TIH with washover pipe to obstruction @ 357'.
2750921 Primary Facility 2018-07-02 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig drilling out fill at 484' (rod down), drilling on air with mist. No circulation to surface.
2750946 Primary Facility 2018-07-05 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig drilled out fill to 512'. Currently SD, working on rig.
2754087 Primary Facility 2018-07-09 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig will be attempting to pull 5" casing so they can use drillpipe instead of tubing to continue cleaning out well.
2754441 Primary Facility 2018-07-10 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig pulled 7 joints of 5" casing (random lengths), working on 8th at time of inspection.
2755062 Primary Facility 2018-07-12 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig pulled a total of 358' of 5 1/2" casing (parted at 358'). Drove 4' of new 13 3/8" conductor.
2755398 Primary Facility 2018-07-16 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig milling with 5" mill at 421'. Slow drilling with no circulation.
2755807 Primary Facility 2018-07-20 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig milling/cleaned out well to 429' before shutting down for weekend (no activity at time of inspection).
2757381 Primary Facility 2018-07-23 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig settled and shifted away from well. Set down mast and preparing to move rig back over well.
2757383 Primary Facility 2018-07-24 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig is moved back over well, running drillpipe back into hole to resume cleanout.
2757653 Primary Facility 2018-07-26 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig got down to 549' yesterday before conductor pipe began to leak. Getting ready to grout outside of conductor.
2757667 Primary Facility 2018-07-30 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig cleaning out well at 600' with 6" mill. Circulating air but no fluid.
2758184 Primary Facility 2018-07-31 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig cleaning out well at 729' with 6" mill. Circulating air but no fluid.
2761484 Primary Facility 2018-08-06 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig cleaning out well at 1089'. Circulating air but no fluid, except flowback on connections. Servicing rig at time of inspection.
2761496 Primary Facility 2018-08-07 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig cleaned out hole to 1125'. TIMCO logged hole with caliper/CCL to a depth of 2200'. Found 5 1/2" casing from TD to 417', open hole from 417' - 397' and 6 5/8" to surface.
2761590 Primary Facility 2018-08-08 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig TIH with drillpipe to TD, pumped 30 sack bottom-hole plug. TOOH to get ready for TIMCO to perforate casing to surface later today.
2763586 Primary Facility 2018-08-09 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost tagged bottom hole plug at ~1960' (TOC calculated at 2000'). Formation Cementing rigged up and began pumping a series of cement plugs.
2763605 Primary Facility 2018-08-14 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost has CBS truck on location topping off cement after cementing to within ~80'-90' from surface last week. Rig has been demobilized, but some of equipment still remains on site.

For data sources see[4]

References